Text
u
,
3.
-
,
-
y;
'
N
UNITED STATES .
'
.)
[M'-
f:
NUCLEAR REGULATORY COMMISSION -
l
,
,
_
9;;
-.g'
El
FIEGION V ,
k
1450 MARIA LANE - .
"
'
'%y
WALNUT CREEK, CAUFORNIA 94596-5368
q
g
J
December 15, 1993
j
Docket'No. 50-344-
,
Portland General Electric Company
121=S. W. Salmon Street
.;
,
Portland, Oregon 97204
y
i
Attention:
Mr. J. E. Cross
'
i
'
,
Vice President and Chief Nuclear Officer
Gentlemen:
,
n
Subject: NRC INSPECTION REPORT NO. 50-344/93-14
g
-This refers to the inspection conducted by Mr. J. F. Melfi of this office on -
'
September 30 through November 12, 1993. The inspection-included a review of-
'
activities authorized by NRC License No. NPF-1 for'the Trojan Nuclear Plant.-
. At the conclusion of the inspection, the findings were discussed with. those
1
-
members of your staff identified in the enclosed report.:
1
,,
Areas examined during this inspection are identified in thel enclosed, report.
Withinithese areas, the inspection consisted of: selective examinations of
procedures and representative records, interviews with personnel, and-
observations by the inspector.
.
Based on the results of this inspection, one of your activities appeared to be
L
.in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). This violation related to the' failure' ofia detailed
.
1
construction package to specify sufficient design details to ensure 'that.the
,
spent fuel pool could not be siphoned below;the minimum allowed' level 'of
,
~83 feet, 11 inches. Your corrective actions' for this ' violation were reviewedi
'
by the inspector and found to be appropriate. Therefore, no response to thei
,;
enclosed Notice is required.
]
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a, copy ofi
j
this letter and the enclosures will be placed in the NRC Public Document Room.-
]
.~
. Should you have any questions concerning this inspection,' we will be. pleased.
l
to discuss them with you.
,
L
1
l
Sincerely,
udm
o
hC.
VanDenburgh, Chief
,i
Re
or Projects Branch
l
- Enclosures
-
1.
Notice of Vi01ation
!
2.
Inspection Report No. 50-344/93-14
j
.
.r
-4
9322300024 931215
~
l[/.'
l
gDR
ADOCK 05000344
ma
-
,
v
,
L
_
,,
_ _ ,
I
- 2 --
)
"
,
a
1
. cc w/ enclosure:
-
Mr. Steve M. Quennoz, Plant General Manager
Mr. Leonard A. Girard, Vice President and General Counsel
-
Mr. Michael J. Sykes, Chairman, Board of County Commissioners,
Columbia' County -
!
Mr. David Stewart-Smith, Oregon Department of Energy'
l
Mr. Tom' Walt, General Manager, Technical Functions'
Mr. Lloyd K. Marbet
i
Mr. Jerry: Wilson, Do It Yourself Committee
i
Mr. Eugene Rosolie, Northwest Environmental Advocates
!
c
i
+
1
!
'?
l
-
,
r
!
i
?
l
l
l
,
'
t
i
[
!
i
'I
t
!
5
r
-
-
.
-3-
! ~
bec w/ copy.of' enc 1osure:
- Docket File
,--
Project Inspector
Resident Inspector
G. Cook
B. Faulkenberry
S. Richards
P. Johnson
M. Masnik, NRR
-
bcc w/o enclosure:
M. Smith
J. Bianchi
D. Clevenger
REGI N V
'?
PJonsn(lJ17jd
i 3
i
RHue
CVanD
gh
2/ 3 /93
12/ 3 /93 -
'
12/[j/93
12/(p/93
EQUEST COPY . /EQyESTCOPY
JtEQUEST COPY ,
EST COPY ]
'
YES // NO
' /YESi/ NO
- ES/ / NO
ES / N0
1
-
j
v
/
i
'
YES \\ / NO
File Location: G:\\PSl\\TR-93-14.PHJ
280054
(N
,
$505
._