Forwards Insp Rept 50-344/93-14 on 930930-1112 & Notice of Violation
ML20059A129
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 12/15/1993
From: Vandenburgh C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Cross J
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML20059A132 List:
References
NUDOCS 9312300024
Download: ML20059A129 (3)


See also: IR 05000344/1993014

Text

u

,

3.

-

,

-

y;

'

N

UNITED STATES .

'

.)

[M'-

f:

NUCLEAR REGULATORY COMMISSION -

l

,

,

_

9;;

-.g'

El

FIEGION V ,

k

1450 MARIA LANE - .

"

'

'%y

WALNUT CREEK, CAUFORNIA 94596-5368

q

g

J

December 15, 1993

j

Docket'No. 50-344-

,

Portland General Electric Company

121=S. W. Salmon Street

.;

,

Portland, Oregon 97204

y

i

Attention:

Mr. J. E. Cross

'

i

'

,

Vice President and Chief Nuclear Officer

Gentlemen:

,

n

Subject: NRC INSPECTION REPORT NO. 50-344/93-14

g

-This refers to the inspection conducted by Mr. J. F. Melfi of this office on -

'

September 30 through November 12, 1993. The inspection-included a review of-

'

activities authorized by NRC License No. NPF-1 for'the Trojan Nuclear Plant.-

. At the conclusion of the inspection, the findings were discussed with. those

1

-

members of your staff identified in the enclosed report.:

1

,,

Areas examined during this inspection are identified in thel enclosed, report.

Withinithese areas, the inspection consisted of: selective examinations of

procedures and representative records, interviews with personnel, and-

observations by the inspector.

.

Based on the results of this inspection, one of your activities appeared to be

L

.in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice). This violation related to the' failure' ofia detailed

.

1

construction package to specify sufficient design details to ensure 'that.the

,

spent fuel pool could not be siphoned below;the minimum allowed' level 'of

,

~83 feet, 11 inches. Your corrective actions' for this ' violation were reviewedi

'

by the inspector and found to be appropriate. Therefore, no response to thei

,;

enclosed Notice is required.

]

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a, copy ofi

j

this letter and the enclosures will be placed in the NRC Public Document Room.-

]

.~

. Should you have any questions concerning this inspection,' we will be. pleased.

l

to discuss them with you.

,

L

1

l

Sincerely,

udm

o

hC.

VanDenburgh, Chief

,i

Re

or Projects Branch

l

Enclosures

-

1.

Notice of Vi01ation

!

2.

Inspection Report No. 50-344/93-14

j

.

.r

-4

9322300024 931215

~

l[/.'

l

gDR

ADOCK 05000344

ma

-

,

v

,

L

_

,,

_ _ ,

I

- 2 --

)

"

,

a

1

. cc w/ enclosure:

-

Mr. Steve M. Quennoz, Plant General Manager

Mr. Leonard A. Girard, Vice President and General Counsel

-

Mr. Michael J. Sykes, Chairman, Board of County Commissioners,

Columbia' County -

!

Mr. David Stewart-Smith, Oregon Department of Energy'

l

Mr. Tom' Walt, General Manager, Technical Functions'

Mr. Lloyd K. Marbet

i

Mr. Jerry: Wilson, Do It Yourself Committee

i

Mr. Eugene Rosolie, Northwest Environmental Advocates

!

c

i

+

1

!

'?

l

-

,

r

!

i

?

l

l

l

,

'

t

i

[

!

i

'I

t

!

5

r

-

-

.

-3-

! ~

bec w/ copy.of' enc 1osure:

- Docket File

,--

Project Inspector

Resident Inspector

G. Cook

B. Faulkenberry

S. Richards

P. Johnson

M. Masnik, NRR

-

bcc w/o enclosure:

M. Smith

J. Bianchi

D. Clevenger

REGI N V

'?

PJonsn(lJ17jd

i 3

i

RHue

CVanD

gh

2/ 3 /93

12/ 3 /93 -

'

12/[j/93

12/(p/93

EQUEST COPY . /EQyESTCOPY

JtEQUEST COPY ,

EST COPY ]

'

YES // NO

' /YESi/ NO

  1. ES/ / NO

ES / N0

1

-

j

v

/

RQ TO PDR

i

'

YES \\ / NO

File Location: G:\\PSl\\TR-93-14.PHJ

280054

(N

,

$505

._