e Portland General Electric Company 1
James E. Cross Vice President and Chief Nuclear Officer October 18,1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission j
Attn: Document Control Desk Washington DC 20555 1
Mr. Bobby H. Faulkenberry (2)
Regional Administrator, Region V J
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 l
l
Dear Sirs:
Troian Permanently Defueled Emercency Plan 1993 Annual Exercise Scenario Packace Enclosed please find the Trojan Permanently Defueled Emergency Plan 1993 Annual Exercise Scenario package. The package provides exercise participants' extent of play, objectives, scenario narrative summary, scenario timeline, and controller data. The objectives have been modified to reflect the exemptions granted by the NRC to discontinue offsite planning, consistent with the approved Trojan Permanently Defueled Emergency Plan. This information is being provided for your review prior to the exercise and shall be withheld from public disclosure until after the Annual Exercise to assure confidentiality. The 1993 Trojan exercise is scheduled for November 17,1993, during normal working hours and will be an announced exercise.
On March 29,1993, the NRC approved, on a one-time basis for 1992, Portland General Electric's (PGE's) request for exemption from the requirements of 10 CFR 50, Appendix E, Section IV(F)(2), which require each licensee at each site to exercise its emergency plan on an annual basis. In its exemption request dated February 15, 1993, PGE committed to perform an l
C O N FID EN TI A L IN FORM ATION 20332 i
The information provided in the enclosure shall be withheld from
[
public disclosure until November 18,1993, to assure confidentiality, w.
, a y
N.Y b l )
g T'
121 S W Sarrnon Sneet, eotana Oregon 97204 (503)464-8897
f 8
Document Control Desk October 18,1993 Pace 2 exercise using the Permanently Defueled Emergency Plan subsequent to its approval by the NRC.
j The Trojan Permanently Defueled Emergency Plan 1993 Annual Exercise, to be conducted on i
November 17, 1993, will fulfill this commitment and will satisfy the requirements of 10 CFR 50, Appendix E, Section IV(F)(2) for 1993.
In light of the exemptions granted by the NRC to discontinue offsite planning, the NRC, by letter dated September 30,1993, from F.J. Congel, NRR, to C.S. Wingo, Federal Emergency Management Agency (FEMA), has withdrawn the requirement for FEMA to monitor, review, or report on offsite radiological emergency planning and preparedness activities at Trojan.
Sincerely, S. M. Quennoz for J. E. Cross Enclosure C ON FID ENTI AL IN FORM ATION The information provided in the enclosure shall be withheld from public disclosure until November 18,1993, to assure confidentiality.
l i
1 Document Control Desk October 18,1993 Pace 3 1
c:
Mr. David Stewart-Smith (w/o enclosure)
State of Oregon Department of Energy Ms. Rose Bennett State of Oregon Department of Energy J
Mr. James Melfi.
NRC Resident Inspector Trojan Nuclear Plant
)
Mr. Phil Qualls Reactor Inspector, Region V U.S. Nuclear Regulatory Commission Ms. Diane Offord (w/o enclosure)
State of Washington
~
Division of Emergency Management Mr. Joe Murray (w/o enclosure)
State of Washington Division of Emergency Management Mr. Richard Donovan (w/o enclosure)
Federal Emergency Management Agency Region X j
C O N FID E N TI A L IN FO RM ATION The information provided in the enclosure shall be withheld from public disclosure until November 18,1993, to assure confidentiality.
...-.