ML20057D672
| ML20057D672 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 09/30/1993 |
| From: | Cross J PORTLAND GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9310050163 | |
| Download: ML20057D672 (1) | |
Text
-
1 SAFEGUARDS INFORM ATION i
i m
s==
==
Portland General ElechicCompany i
F-L__
James E. Cross Vice President and Chief Nuclear Officer September 30,1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attn: Document Control Dest Washington DC 20555
Dear Sirs:
Trojan Nuclear Plant i
Security Plan (Defueled Condition)
This letter transmits PGE-1017, Revision 40, " Trojan Nuclear Plant Security Plan (Defueled Condition)." This document replaces PGE-1017, Revision 39, in its entirety.
The signed original and three copies of PGE-1017, Revision 40, " Trojan Nuclear Plant Security Plan (Defueled Condition)" are enclosed with this letter. This enclosure contains Safeguards Information, and should be handled in accordance with the requirements of 10 CFR 73.21.
Sincerely, h
S. M. Quennoz o J. E. Cross Enclosure c:
Mr. Bobby H. Faulkenberry Regional Administrator, Region V U. S. Nuclear Regulatory Commission UNcLASSIRED WHEN SEPARATED FRW SAFEOUAR06 '
Mr. David Stewart-Smith (w/o enclosure)-
mFORmTION ENCt.06URE State of Oregon Department of Energy Mr. James Melfi NRC Resident Inspector 5,
Trojan Nuclear Plant
.J j
)) !jp
/
9320050163 93o93o
.T SAFEGU ARDS INFORM ATION q~
g PDR ADOCK 05000344 e
F PDR
. ; Er~cn %t R.c.ya ;-s ~ a 9;id (503)464-6897
-