i l

i l

OPERATINS DATA REPORT DOCKET ND 50-413 i

DATE Perenber 15. 1993 OPERATINS STATUS COMPLETED Bf R.A. Williams TELEPHONE 704-322-5346

1. Unit Nase: Catauba 1
2. Reporting Period: November 1, 1993-Novester 30,1993
3. Licensed thereal Feuer (MWt):

3411

0. Neceplate Rating (Gross MWe):

1305*

Notes *NameplateRating

5. Design Electrical Rating (Net MWe):

1145 (Bross MWe) calculated as

6. Gaxinus i,tre.dable Capacity (Bross MWe):

1192 1450.000 MVA x'.90 power

7. Gaxisus Dependable Capacity (Net MWe):

1129 factor ;er Page iii, l

8. If Changes Occur in Capacity Ratings (Itees Number 3 Through 7) Since Last NURES-0020.

l l

Report. Give Reasons:

l

9. Power Level To Which Restricted, if Any (Net MWe):
10. Reason for Restrictions, If any:

j i

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 720.0

'8016.0 73849.0

12. Number Of Hours Reactor Was Critical 0.0 6944.5 55731.1
13. Reactor Reserve Shutdown Hours

- --0--

- 10. Hours Generator On-Line 0.0 6909.3 54644.1

15. Unit Reserve Shutdown Hours -

- -0--

16. Gross Thereal Energy Generated (MWH) 0 22696626 177233434
17. Gross Electrical Energy Generated (MWH) 0 8037948 62363167
18. Net Electrical Energy Benerated (MWH)

-5138 7591992 58557233 l'

19. Unit Service Factor 0.0 26.2 74.0
20. Unit Availability Factor 0.0 86.2 74.0
21. Unit Capacity Factor ti' sing MDC Net) 0.0 -

.B3.9 69.9

22. Unit Capacity Factor (Using DER Net) 0.0 82.7 69.3
23. Unit Forced Dutage Rate 0.0-4.6 10.3
24. Shutdown Scheduled Over Next 6 f!onths (Type, Date, and Duration of Each):

Currently Refueling

25. If Shut Down At End Of Report Period. Estimated Date of Startup: January 2. 1994
26. Units In Test Status (Prior to Consercial Operation):

Forecast Achieved i

INITIAL CRITICALITY I

INITIAL ELECTRICITY COMMs.RCIAL OFEFATION l

1 I

J 9312210003 931215 k

PDR ADOCK 05000413 l

R pnn S<

i

i i

DFERATINB BATA REFORT DDCKET ND 50-413 UNIT Catawba !

DATE Detenber 15, 1993 COMPLETED BY P.A. Willines TELEPHONE 704-382-5346 i

MONTH Noveeher 1993 i

DE AVERASE DAILY POWER LEVEL

piY, WERABE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

1 2

0 IB 0

i 3

0 19 0

4 0

20 0

5 0

21 0

l 6

0 22 0

3 t

7 0

23 0

5 r

B 0

24 0

I 9

0 25

'0 l

10 0

26 0

i t

11 0

27 0

i 12 0

28 0

13 0

29 0

l 14 0

30 0

15 0

r 16 0

l 9

7

?

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-413 UNIT NAME CATAWUA 1 l

DATE 12/1D/ 9 J REPORT MONTH November 1993 COMPLETED BY M.

A.

WILb1AMS TELEPHONE true)-auz-DJ4b (1) 2)

(4)

(5)

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 4

93 1 S

720.00 C

RC FUELXX END OF CYCLE 7 REFUELING OUTAGE i

i (1)

(2)

(3' (4)

F Forced Reason

  • bethod:

' Exhibit G - Instructions A-Equihment FailureB-Maintenance or test (Explain) 1-Manual for PreDaration of, Data S Scheduled 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram

'Eyent Report (NUREG-0161) )

(LER D-Regulato W Restriction 4-Other (Explain)

File E-Operator Training;&~ License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit-I.- Same Source H-Other (Explain) i

.. -.-.---.-a.-

--s

-,n,w,,-.

--n...--...-~.v.

.,...,--,--,.--..-,-a...,,-wn...,,,.,e

,ne.w.

,,s

k 4

DOCKET: 50-413 UNIT: Catawba 1 Date: 12/15/93 1

NARRATIVE

SUMMARY

MONTH: November 1993 l

Catawba Unit 1 began the month of Novemberwith end-of-cycle 7 refueling outage in progress. The unit remained in the outage for the entire month.

L k

i Prepared by R. A. Williams I

Telephone: 704-382-5346

I l

t MONTHLY REFUELING INFORMATION REOUEST 1

1.

Facility name: Catawba.

Unit 1

{

2.

Scheduled next refueling. shutdown: Currently Refuelino l

3.

Scheduled restart'following refueling: Januarv'1994-i l

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE-COMMUNICATION OF' ANY T.S.

CHANGE OR. LICENSE AMENDMENT. THEREFORE, ~ QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling 'or. resumption of operation thereaftera require a technical specification change or other license amendment?

]

I If yes, what will these be?

If no, has reload design and' core configuration been reviewed by f

Safety Review Committee-regarding-unreviewed safety questions?

i i

-5.

Scheduled date(s) for submitting proposed licensing action ; and-i supporting information.

6.

Important licensing considerations (new or different d e s i g n. o r '.

i

supplier, unreviewed design or performance analysis methods,

'l significant changes in design or new operating procedures).

l l

7.

Number of Fuel. assemblies (a)

'in the core: 191 j

(b) in the spent fuel' pool: 101.

8.

Present licensed fuel pool capacity: 1418

.l Size of requested or planned increase * -

q 9.

Projected date of 'last refueling whichi can. be l accommodated by-1 present licensed capacity: September 2009 1

DUKE POWER COMPANY DATE:

December 15. 1993 Name of

Contact:

R.

A. Williams Phone:

704-382-5346 i

(

l l-

GFERATING DATA FEPORT DOCKET N3 50-414 DATEpecreter 15. 1993 OPERATING STATUS COMPLETED BY R.A. Williaes TELEFHONE 704-382-5346

1. Unit Name: Catant>a 2
2. Reporting Period: November 1,1993-November 30, 1993
3. L: tented Thersal Power (MWt):

3411

4. Naseplate Rating (Srpss MWe):

1305e Notes *Naneplate Rating

5. Design Electrical Rating (Net MWe):

1145 (Bross MWe) calculated as

6. Ma:isus Dependable Capacity (6tess MWel:

1192 1450.000 MVA x.90 power 1

7. Raxinus Dependable Capacity (Net MWe):

!!29 factor per Page iii,

2. If Changes Dccur in Capacity Patirigs (Itess Nester 3 Through 7) Since Last NURE6-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):
10. Reas:n For Restrictions, If any:

This Month Yr.-to-Date Cunlative

!!. Hours in Reporting Feried 720.0 B016.0 63B65.0 l

12. Number Df Hours Reactor Was Critical 720.0 6550.5 49196.9 l
13. Reatter Reserve Shutdown Hours

--0--

--0--

--0--

14. Hours Generater On-Line 720.0 6469.9 4B335.5
15. Unit Reserve Shutdtwn Hours

--0--

--0--

--0--

l

16. Bress Thereal Energy Benerated (MWH) 2%6B20 21673730 154364B76
17. Brcss Electrical Energy Generated (MWH1 877939' 7710042 54671017 i
18. Net Electrical Energy Senerated (MWH)

E33076 7302269 51429595

19. Unit Service facter 100.0 81.0 75.7
20. Unit Availability Fatter 100.0 Bl.0 75.7 1
21. Unit Capacity Fatter (Using MDC Net) 102.5 B0.7 71.1 1
22. Unit Capacity Fatter (Using DER Net) 101.1 79.6 70.3
23. Unit Forced Dutage Rate 0.0 0.7 9.B
24. Shutdown Scteduled Dyer Next 6 Ponths (Type, Pate, and Duration of Each):

Refueling - April 29, 1994 - 68 days

25. If Shut Dcwn At End Of Report Feriod. Estinated Late of Startup:
26. Units In Test Status (Prior to Ceseercial Operationi:

Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICliY COMMERCIAL DPERATIDN l

1

OPERATING DATA EEPORT f

DOCKET N3 50-414 UNIT Catawba 2 DATE Detester 15. 1993 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 I

00 NTH Nevesber. 1993 i

I AVERABE DAILY POWER LEVEL 03

. AVERABE DAILY F0WER LEVEL f

(MWe-het)

(MWe-Net) 1 1160 17.

!!47 i

2 1159 IB 1158 3

1157 19 1158 4

1155 20

!!61 5

1!49 21 1163 6

1152 22 1160 i

7 1159

'23 1160 B

1159 24

!!60 9

1159 25

!!60 10 1159 26 1161 11 1157 27 1159 l

12 1158 28 1161 i

13 1154 29

!!63 i

i 14 1149 30

!!61 15 1146 16 1148

l i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-414 UNIT NAME CATAWBA z DATE 12/ lo/ wa REPORT MONTH November 1993 CCMPLETED BY H.

A.

w1Ln1AMs TELEPHONE tiv4)-Juz-d346 (1)

2) g, (4)

(5)'

E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE l

o NO SHUTDOWNS OR REDUCTION S

1 i

( 1) -=

(2)

(3)

(4)

~

F Forced Reason

  • Method:

Exhibit G - Ini wctions A-Equipment FailureB-Maintenance or test (Explain)

S Scheduled 1-Manual for Preparation c.t Data 2-Manual Gcram Entry Sneets Fo-Licensee C-Refueling 3-Automatic Scram-Event Report-(LER)

D-Regulatory R9striction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training &-License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

-o

.. ~ -.. -.. _ _,

,_.~..-...~,.......m.....~.~.-

....,.-,..,.~.~~...--*.e.

v~

- - ~,- -... ~,--..~.,,

--..c.

i DOCKET: 50-414 P

UNIT: Catawba 2 Date: 12/15/93 l

l t

I NARRATIVE

SUMMARY

i MONTH: November 1993 Catawba Unit 2 began the month of November operating at 100% full power. The unit operated at or near 100% full power the entire month.

l

[

f l

1 l

l i

I I

.i Prepared by R. A. Williams l

Telephone: 704-382-5346 l

MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name: Catawba.

Unit 2 2.

Scheduled next refueling shutdown: Anril 1994 l

3.

Scheduled restart following refueling: July 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.

CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter. require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

i l

S.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or i

supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 251 8.

Present licensed fuel pool capacity: 1438 Size of requested or planned increase: -

9.

Projected date of last refueling which can be accommodated by l

present licensed capacity: Sectember 2011 l

DUKE POWER COMPANY DATE:

December 15. 1993 Name of

Contact:

R.

A. Williams Phone:

704-382-5346 l

_