P t

i 7

t i

ENCLOSURE 5 VOGTLE ELECTRIC GENERATING PLANT ,

REQUEST TO REVISE TECHNICAL SPECIFICATIONS REGARDING AUXILIARY COhfPONENT COOLING WATER SUPPLY AND RETURN CONTAINMENT ISOLATION VALVES PROPOSED TECHNICAL SPECIFICATION CHANGE l

l l

l i

Il

)

l 9310040341 930930 PDR TI P ADOCK 05000424 .h!

PDR h

1 CONTAINMENT SYSTEMS SURVEILLANCE REOUIREMENTS (Continued)
b. If any periodic Type A test fails to meet 0.75 L the test schedule for subsequent Type A tests shall be reviewed and approved by the -

Commission. If two consecutive Type A tests fail to meet 0.75 L,, a Type A test shall be performed at least every 18 months until two consecutive Type A tests meet 0.75 L, at which time the above test schedule may be resurred;

c. The accuracy of each Type A test shall be verified by a supplemental test which:
1) Confirms the accuracy of the test by verifying that the absolute value of the supplemental test result, L,, minus the sum of the Type A and the superimposed leak, L , is equal to or less than 0.25 L,;
2) Has a duration sufficient to establish accurately the change in leakage rate between the Type A test and the supplemental test; and
3) Requires that the rate at which gas is injected into the containment or bled from the containment during the supplemental test is between 0.75 L, and 1.25 L,. l
d. Type B and C tests shall be conducted with gas at a pressure not less than P,, 37 psig, at intervals no greater than 24 monthstexcept for tests involving:
1) Air locks and j l
2) Purge supply and exhaust isolation valves with resilient 4 material seals. l l
e. Air locks shall be tested and demonstrated OPERABLE by the require- I ments of Specification 4.6.1.3; i
f. Purge supply and exhaust isolation valves with resilient material l seals shall be tested and demonstrated OPERABLE by the requirements I of Specification 4.6.1.7.2;
g. The provisions of Specification 4.0.2 are not applicable.

t Tjg ~J~ c. C les4 in hwsI& (hH i vska HV-1979 ad wocMed Check cl/L J-JLI7-UY-l13),HV"625>UV~lA76,a HV-JA74 Ma bc l ed/cg/e/ /c fner b PA&y irlh Md4 Yh//* wig /Ae sieg7' se/i u/e/ i (t[ntling 00lagt fV NL llC,<l 1Grcd 04/df c rr &hjy c, fry, jmQ M6de 5), bnf m Infw /4sn Nev% hw f. /11%

V0GTLE UNITS - 1 & 2 3/4 6-3 Amendment No. 63 (Unit 1)

Amendment No. 42 (Unit 2)