ML20058L263
| ML20058L263 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/31/1990 |
| From: | WISCONSIN ELECTRIC POWER CO. |
| To: | |
| Shared Package | |
| ML20058L260 | List: |
| References | |
| NUDOCS 9008070090 | |
| Download: ML20058L263 (1) | |
Text
-.. -
1~
i,
- [,*~'
TABLE 15.4.1-1 (2 of.4)-
l-Channel No. Desc-iption Check Calibrate Test Remarks
- 10. Rod Position Bank Counters S(1)**
N.A.
N.A.
(1) With analog rod position
- 11. Steam Generator Level S**
R M(1,2)**'
(1) Includes test of logic for l
reactor trip on low-low level and automatic actuation logic for auxiliary feedwater pumps
'Ujj (2) Includes test of logic for-
- n o high steam generator level.
i
$$12.SteamGeneratorFlowMisraatch S**
R M**
SS E 13. Charging Flow N.A.
R N.A.
oo
$814. Residual Heat Removal Pump Flow N.A.
R-
-N.A.
- 15. Boric Acid Tank Level D
R N.A.
O$
- 16. Refueling Water Storage Tank Level N.A.
R N.A.
- 17. Volume Control Tank Level N.A.
R N.A.
- 18. Reactor Containment Pressure S
R M(1)**'
.(1) Isolation valve signal
- 19. Radiation Monitoring System D
R M
(1) Radioactive Effluent Monitoring Instrumentation Surveillance Require-ments are specified in 15.7.4.
- 20. Boric Acid Control N.A.
R N.A.
- 21. Containment Water Level M
R N.A.
- 22. Turbine Overspeed Trip
- N.A.
R M(1)**
(1) Block trip
- 23. Accumulator Level and Pressure S
R N.A.
- Overspeed Trip Mechanism, and Independent. Turbine Speed Detection and Valve Trip System
- Not required during periods of refueling shutdown, but must be performed prior to starting up if it has-not been performed during the previous surveillance period.
Unit 1 Amendment No.
Unit 2 Amendment No.
. _ _ _ _ _ _