7 COOPER NUCLEAR STATION i

%h Nebraska Public Power District "Y4E"Y ~

CNSS938875

)

December 9, 1993 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Monthly Operating Status Report for November, Docket No. 50-298.

l Gentlemen:

j Enclosed for your information and use is the Cooper Nuclear Station Monthly-Operating Status Report for November 1993.

The report includes Operating Status, Average Daily Unit Power Level Unit Shutdown Data and a Narrative Summary of Operating Experience.

Should you have any comments, or require additional information regarding this i

report, please contact me.

Sincerely, i

l 1

R. L. Gardner Plant Manager i

RLG/SCW/ dis l

Enclosures cc:

G. D. Watson J. L. Milhoan l

1 l

1 I~

, l y

i 1

9312150002 9311N 1

PDR ADOCK O L'

"mm aspawertarprideiasnebraska.

=====m m= =..

OPERATING DATA REPORT DOCKET NO.

050-0298 UNIT CNS

{

DATE Decen:ber 9.1993 i

OPERATING STATUS TELEPHONE (402) 825-5487 1.

Unit Name:

CooDer Nuclear Station Notes j

2.

Reporting Period:

November 1993 3.

Ucensed Thermal Power (MWt):

2381 4.

Nameplate Rating (Gross MWe):

836 9

Design Electrical Rating (Net MWe):

778 6.

Maximum Dependable Capacity (Gross MWe):

787 7.

Maximum Dependable Capacity (Net MWe):

764 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

4 g.

Power Level To Which Restricted, if Any (Net MWe):

10.

Reasons For Restriction,if Ariy-l This Month Yr.-to-Date Cumulative 11.

Hours in Reporting Period 720.0 8.016.0 170.233 0 12.

Namber of Hours Reactor Was Critical 720 0 4.543 0 129.510.0 I

13 Reactor Reserve Shutdown Hours 0.0 00 0.0 14.

Hours Generator On-Une 720.0 4.451.0 127.659.9 l

15.

Unit Reserve Shutdown Hours 0.0 00 0.0 16.

Gross Thermal Energy Generated (MWH) 1.708.320 0 10.183.632.0 263.027.596 0 17.

Gross Electric Energy Generated (MWH) 573.335.0 3.387.105.0 85.378.087.0 18.

Net Electric Energy Generated (MWH) 556.053.0 3.282.747.0 82.441.063.0 1

19.

Unit SwWcs Factor 100.0 55.5 75.0 20 Unit Availability Factor 100.0 55.5 75.0 21.

Unit Capacity Factor (Using MDC Nc')

101.1 53.6 63.4 l

22.

Unit Capacity Factor (Using DER Neti 99 3 52.6 62.2, 23.

Unit Forced Outage Rate 0.0 0.0 4.2 24.

Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

A two-week maintenance OUtaae is scheduled for March 1994.

25.

If Shut Down At End of Report Period, Estimated Date of Startup:

26.

Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICAUTY INITIAL ELECTRICITY COMMERCIAL OPERATION j

.- =.

h AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

050-0298 UNIT CNS-DATE December 9, 1993 TELEPHONE (402) 825-5487 MONTH November 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL' (MWe-Net)

(NWa-Net) 1 774 17 775 2

774 18 775 j

3 728 19-775 4

775 20 775 l

5 773 21 77?

6 774 22 775 7

772 23 775 1

8 771

.4 773 9

776 25 773 10 775 26 774 I

i 11 775 27 774

)

12 775 28 771 l

1

]

13 775 29 773 14 771 30 773 15 774 1

16 775 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net'for each day in the reporting month.

Compute to the nearest whole negawatt.

y

'I l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

0504298 UNIT NAME Cooper Nuclear Station DATE.

December 9.1993 COMPLETED BY S. C. Wheeler TELEPHONE (402) 825-5487 REPORT MONTH November 1993 Method Of Licensee Cause & Corrective Duration Shutting Event System

  • Component' Action to No.

Date Type'

-(Hours)

Reason

  • Down Reactor' Report Code Code' Prevent Recurrence None 4

1 F: Forced 2

Reason:

3 Method

-.4' Exhibit G -Instructions for S: Scheduled A Equipment Failure (Emplem) 1 - Manuel.

Pro,wation of Data Entry -

. B - Maintenance or Test

. 2 - Manual Scram.

Sheets for Ucensee Event C - Refueling "3 - Automatic Scram Report (LER) Fue (NUREG0161)

D - Regulatory Restriction 4 - Continued E - Operator Training & Ucense Examination.

5 - Reduced Load.

.5 Exhibit t-Same Source F-Admmistrative 6 - Other

- G - Operational Error (Explem)

. H - Other (Explain) -

. ~,

... -,~.-

, - ~. -~

~

m-------

II l

l l

l OPERATIONS NARRATIVE-COOPER NUCLEAR STATION November 1993 i

i Cooper Station operated at.100 percent power for the. entire month of ~

November, with the exception of planned power reductions for control l

rod operability testing on November 7,14,21 and 28. Power reductions were also experienced on November 3 for repair of an extraction steam drain leak and November 8 when the plant entered an LCO for inoperability of the diesel generators.

A unit capacity factor of 101.1 percent (MDC Net) was attained for the month of November.