Forwards Proposed Rev to 931025 TS Change Request,Addressing Change to Reduce Required Min Measured RCS Flow,Per NRC Request That Only Changes Essential to Upcoming Startup of Catawba Unit 1 Cycle 8 Be Proccessed
ML20058J342
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/06/1993
From: Tuckman M
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058J345 List:
References
NUDOCS 9312140070
Download: ML20058J342 (3)


Text

11 I

Ddeh>uer Coripany M S hxrm

.P.0 Box'HX$

Senior McePresident Orariarte, NC28201!X%

Nuclear Generation (704)38222000%ce (704)3824360 Tar l

DUKE POWER 1

i December 6, 1993 U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 Attention: Document Control Desk

Subject:

Catawba Nuclear Station Docket Numbers 50-413 and -414 Technical Specification Change to Reduce Required Minimum Measured Reactor Coolant System Flow; Amended Submittal On October 25, 1993, Duke Power submitted a proposed revision to Technical Specifications for McGuire and Catawba Nuclear Stations which sought to: 1) reduce the required minimum measured reactor _

coolant system flow for McGuire Units 1 and 2 and Catawba Unit 1, and 2) to replace the reference to Figure 2.1-1 in the Limiting Condition for Operation of Technical Specification 2.1.1 (Safety Limits) with a more meaningful safety limit LCO.. Because the first part of the requested revision necessitated a change to Figure 2.1-l 1, it was anticipated that this would be a reasonable opportunity to enhance the Technical Specifications in the second area.

However, resource limitations on the part of the NRC staff have required that only changes essential to the upcoming startup of Catawba Unit 1 Cycle 8 be processed at this time.

Therefore, Duke was requested to amend the submittal to address only the change to the minimum measured flow, and delete all references to the proposed change to the LCO.

Accordingly, attached is a proposed revision to the Technical Specifications of Catawba Nuclear Station, to reduce the required minimum measured reactor coolant system flow for Unit 1 only from 385,000 gallons per minute to 382,000 gpm.

There are two reasons, largely independent of each other, which make this necessary.

Degrading steam generator tubes in McGuire Units 1 and 2,

'and Catawba Unit 1, have necessitated that tubes be plugged or sleeved, which reduces available flow area in the steam generators and consequently reduces flow through the core.

In addition, a hot leg temperature streaming phenomenon has affected the ability to accurately measure flow.-

The steam generators in the affected units are scheduled to be replaced, beginning in 1995.

Catawba Unit 2 has not experienced the level or rat.e of degradation that the other three units have, and this change to reduce required flow M

1300%

9322140070 93 206 DR ADDCK 0500 3

U.

S.

Nuclear Regulatory Commission December 6, 1993 Page 2

)

is not applicable to Catawba Unit 2. There are currently no plans to replace the steam generators in this unit.

The flow measurement i

difficulties caused by the temperature streaming phenomenon will be addressed in a separate submittal.

Approval of this change is requested by the time Catawba Unit-1 i

begins Cycle 8, currently scheduled for December 24, 1993, i

Please note that calibrations to accommodate revised Overpower-Delta-T and Overtemperature Delta-T setpoints will be required when the change to reduce minimum measured flow is approved.

Therefore, it is requested that the changes be made effective 30 days from the date of issuance; or, for a unit that is shutdown, upon startup.

The marked-up Technical Specification pages are contained in Attachment I, a Justification and Safety Analysis in Attachment II, and a "No Significant Hazards" analysis in Attachment III.

Note that when the changes are

approved, the Technical Specifications for Catawba Unit 1 will be different from Unit 2 with regard to RCS flow.

The page numbers will be differentiated (e.

g.,

2-A4 for Unit i

vs.

2-B4 for Unit 2),

and the Specifications will be printed on differently colored paper.

i This submittal is intended to supercede the October 25, 1993 amendment request as it applies to the Catawba Nuclear Station l

only; the October 25, 1993 application'as docketed for McGuire is

~

unaffected.

If any additional information is required, please call Scott Gewehr i

at (704) 382-7581.

l Very trulysyours, C&

~

M.

S.

Tuckman F

3

t e

J U.

S.

Nuclear Regulatory: Commission December 6,-1993 Page 3 i

cc:

Mr. V.

Nerses, Project Manager Office of Nuclear Reactor Regulation U.

S.

Nuclear Regulatory Commission l

Mail Stop 14H25, OWFN i

Washington, D.

C.-

20555 Mr.

R.

E. Martin, Project Manager Office of Nuclear Reactor Regulation U.

S.

Nuclear Regulatory Commission l

Mail Stop 14H25, OWFN I

Washington, D.

C.

20555 I

Mr.

S.

D.

Ebneter, Regional Administrator U.S.

Nuclear Regulatory Commission - Region II 101 Marietta Street, NW - Suite 2900 l

Atlanta, Georgia 30323 l

G.

F. Maxwell Senior Resident Inspector McGuire Nuclear Station 1

i R. J.

Freudenberger l

Senior Resident Inspector Catawba Nuclear Station Dayne Brown, Chief Radiation Protection Branch Division of Facility Services Department of Human Services 701 Barbour Drive Raleigh, North Carolina 27603-2008

[

Heyward G.

Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street j

Columbia, South Carolina l

,