ML20058H947
| ML20058H947 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 07/30/1982 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Sinclair J VERMONT YANKEE NUCLEAR POWER CORP. |
| Shared Package | |
| ML20058H952 | List: |
| References | |
| CAL-82-13, NUDOCS 8208090116 | |
| Download: ML20058H947 (1) | |
Text
N JUL 3 01982 Docket No. 50-271 Vermont Yankee Nuclear Power Corporation ATTN: Mr. J. B. Sinclair Licensing Engineer 1671 Worcester Road Framingham, Massachusetts 01701 Gentlemen:
Subject:
Confirmatory Action Letter 82-13 This refers to your letter dated July 16, 1982, in response to our letter dated April 28, 1982.
Thank you for informing us of the corrective and preventive actions documented in your letter.
In addition, your request for an extension has been granted to complete implementation of the new procedures by September 30, 1982 in order to incorporate comments from Vermont State officials.
Your cooperation with us is appreciated.
Sincerely, Original Signed By:
George H. Smith, Director Division of Emergency Preparedness and Operational Support cc w/ encl:
Mr. Warren P. Murphy, Plant Manager Mr. W. F. Conway, President and Chief Executive Officer Mr. F. W. Jackson, Manager of Operations Mr. L. H. Heider, Vice President Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC) j NRC Resident Inspector l
State of New Hampshire State of Vermont bcc w/ encl:
Region I Docket Room (with concurrences)
RI:DEPOS RI:D Q-RI:DEPOS
- DEPOS RI. P Mojta/ntm Crocker S
e Smi h Star tecki C
0FFI L RECORD 8208090116 820730
~
9 PDR ADOCK 05000271 F
PDR L