NRC hionthly Operations Summary c-
+
Peach Bottom Atomic Power Station October 1990 -
Unit 2 The unit began the month at 80% power in support of maintenance work on the 2C condensate pump, and dropped to 60% the same day for wrk on the 'A2* and *B2' waterboxes. Repairs were made and the Unit was returned to nominal 100% power on October 4.
During the month, minor repairs were maic with no significant problems, On October 20, a load drop began for c antrol rod adjustment which was competed by October 24. The unit was again returned to 100% power whe c it remained for the rest of the month.
J'oltl The unit began the month at 100% power, During the week of October 15, acceptance testing was completed for the new process computer. Preparations for th'c mid-cycle outage began on October 26, and the unit was manually shut down for the outage at 1:30 A.ht, on October 27.
The Offgas system experienced a recombination of hydrogen and oxygen in the aftercondenser rather than the recombiner. When operators attempted to swap steam jet air ejectors, recombination was forced back into the recombiner and the process stabilized. The cause remains the subject of investigation. This condition is not uncommon for a two unit BWR, it appears that the flame or combustion flashes back on pressure wave during low pressure condition. G.E. S.I.L 246 references this condition almost exactly as experienced.
CC1090.NRC 9011260047 901114 0"'00 %: C.
i Docket No. 50-277 Attachment to Monthly Operating a
Report for October 1990 UNIT 2 RFTUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 2 l'
2.
Scheduled date for next refueling shutdown:
Januuy 12,1991 3.
Scheduled date lor restart following refueling:
l.
h1 arch 21,1991
[
l-h 4.
Will refueling or resumption of operation therefore require a technical specification change or other i
license amendment?
Yes.
If ans.ver is yes, what, in general, will these be?
Safety limit MCPR for cycle 9.
L" 5
Scheduled date(s) for submitting proposed '. censing action and sup >orting information:
January 1991 6.
Importar? *..ensing considerathns associ. ted with refueling e.g., new or different fuel design or su unreVewel design or performacce analysa methods, significant changes in fuel' design, new operat proced <cs:
H, Resolution of licensing isstes associated with lead fuel assemblies from new fuel vendors is pending.
7.
The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 7M Fuel Assemblics (b)
Fuel Pool - 1734 Fuel Assemblies,58 Fuel Rods i
CC1090.NRC
4 Docket No. 50-277 Attachment to Monthly Operating Report for October 1990 i
Page 2 UNIT 2 REFUEL,1NG INFORMATION (Continued) 8.
The present licensed spent fuel pool storage capacity and the size of any increase in capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblics.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool as present capacity:
September :003 without full core affload capability, September 1997 with full core offload capability.
l l
i l'
CC1090ERC 9
_. _ =.... - -..
Docket No. 50-278 Attachment to
~
hionthly Operating Report for October 1990 UNIT 3 REFUEL. LNG INFORM ATION 1.
Name of facility:
Peach Bottom Unit 3
[
2.
Scheduled date for next refueling shutdown:
Reload 8 scheduled for August 31,1991 3.
- Ccheduled date for restart following refueling Restart following refueling scheduled for Novemh:r 29,1991 4.
Will refueling or resumption of operation thereafter requ.e a technical specification change or other i
license amendment?
Yes.
'If answer is yes, what, in general, will these be?
Safety limit htCPR for cycle 9 fuel.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
January 1991 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or i applier, unreviewed derign or performance analysis methods, significant changes in fuel design, new ;perating procedures:
w 7.
- The number of ILel assemblics (a) in the core and (b) in the spent fuel storage pool:
(a)
( ore - 764 Fuel Assemblics (b)
"uel Pool 14% Fuel Assemblies,6 Fuel Rods CCt090.NRC
1 u
Docket No. 50 278 Attachment to Monthly Operating Report for October 1990 t
Page 2 i
i UNIT 3 REFUELING INFORMATION (Continued)'
l 8.
The present licensed spent fuel pool storage capacity and the size of any i capacity that has been requested or is planned, m number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemb of the fuel poolis expected to be complete in the fourth quarter of 1990.
4 The projected date of the last refueling that can be discharged to the spent present capacity:
With the current fuel pool capacity (prior to the completion of the fuel poo September 1996 without full core offload capability.
End of next cycle with full core offload capability est. January 1991).
With incteased fuel pool capacity (subsequent to the complet(ion o I
September 20N without full core ofnoad capability.
l September 1998 with full core ofDoad capability.
1 l ~..
h y
1 i
I
.j j
CCt090.NRC r
++
- _. 7 - -
-a
[q
,' ?!,
+
t
(
AVERAGE DAILY UNIT POWER LEVEL
,o i
- q.,
00CKET NO. 50 - 277 e
UNIT PEACH 80Tf0M UNIT 2 DATE NOVEMBER 15. 1990 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERV!50R REPORTS GROUP
' PEACH BOTTOM ATOMIC POWER STAT 10N TELEPHONE (717)456-7014EXI.3321-MONTH OCTOBER 1990 as n
DAY - AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
( =.
-(MWE-NET) 1 733-17 1063 0
2 839 18
-1051 3
954-19 1060 4-1054.
20 977 5
1057 21 800-6 1052 22 1008 r
7 1056 23 1060' a
.8 1049-24
'1066-9 1058
- 25 '
1050
-y-10 -
1063 26 1062-
.I1 1055 27 1060 12 1039 28 1103 j
.- 13 '
1049 29 1062
' 14 '
1061 30 1062-15i 1054 31.
1062 16.
998-
,4
-l l'
AVERAGE DA!LY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 OATE NOVEMBER 15. 1990 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORT 5 GROUP PEACH B01 TOM ATOMIC PCWER STAil0N TELEPHONE (?!?) 456-7014 EXI. 3321 MONTH OCTOCER 1990 DAY AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MVE-NET) 1 1056 17 1067 2
1065 18 1053 3
1056 19 1066 4
1059 20 1067 5
1058 21 1055 6
1054 22 1067 7
1057 23 1046 8
1055 24 855 9
1059 25 861 10 1065 26 795 11 1057-27 16 12 1040 28 0
13 1052 29-0 14 1016 30 0
15 1058 31
.o 16 1058
\\
l
OPERAtlNG DATA REPORT DOCKET NO 50 - 277 DATE h0VEMBER 15, 1990 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-7014EXI.3321 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
- 2. REPORTING PERIDO: OCTOBER, 1990 3.LICENSEDTHERMALPOVER(MVT):
3293
{
- 4. NAMEPLATE RATING (GROSS MWE):
1152
{
5, DESIGN ELECTRICAL RATING (NET MWE):-
1065 6.MAXIMUMDEPENDABLECAPACITY(GROS %MWE): 1098 l
7.MAXIMUMDEPENDABLECAPACITY(NETMWE):
1055 8.IF.CHANGESOCCURINCAPACliYRATINGS(iTEMSNUMBER3THROUGH7)SINCELASTREPORT, GIVER!ASONS:
I
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, 1F ANYi THis MONTH YR-T(H) ATE CUMULATlvE
- 11. HOURS IN REPORTING PERIOD 745 7,296 143,112
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 5,794.7 85,322.0~
- 13. REACTOR RESERVE SHUTOOWN HOURS 0.0 0.0 0.0 14,- HOURS GENERATOR ON-LINE
.145.0 5,642.5 82,247.8
- 15. UNIT RESERVE SHUTDOWN HfJR$
-0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED-(MWH) 2,366,880 16,966,584 242,262,777 17.GROSSELECTRICALENERGYGENERATE0(MWH) 788,000 5.575,600 19,635.490 18.NETELECTRICALENERGYGENERATED(HWH) 761,189 5,367,806 76,222,655 1
PAGE 1 0F 2.
I s
d v
f
...s
o 4
.s i; '
s OPERATING DATA REPDRT (CONTINUED)-
DOCKET NO. 50 - 277 1
OATE NOVEMBER 15. 1990 I
i
- I'
i THIS MONTH YR-TO-DATE CUMULATIVE -
s
- 19. UNIT SERVICE Fact 0R 100.0
.77.3 57.5
- 20. UNIT AVAILABILITY FACIDR 100.0.
177.3 57.5
- 21. UNIT CAPACliY FACTDR (USING MDc NET) 96.8' 69.7 50.5 1'
22.UNITCAPACITYFACIDR(USINGDERNET) 95.9 69.1 50.0
-n,
v-b-
- 23. UNIT FORCED OUTAGE RATE 0.0 14.5 14.5 q
- 24. SHUTDOWNS SCHEDULEC OVER NEXT 6 MONTHS (TIPE. DATE. AND DURATION OF EACH):
s
- g,3; i REFUEL DUTAGE. BEGINNING JANUARY 12, 1991 90 DAYS, j
- 1 g_
ni
- 25. IF $HUTDOWN AT END OF REPORT PERIOD, ES7 MATED DATE OF STARTUP 4
- 26. UNITS IN TEST STATUS 'PRIDR TO CDMMERCIAL OPERATIDN):
FDRECAST ACHIEVED a
INITIAL _CRiflCAll1Y 09/16/13
~IN.TIAL ELECTRICITY 02/18/74 CONNERCIAL OPERATION 07/05/74
- )
. i
. [
.i
.o i'
u.
- PAGE 2 0F 2-m.
5 i
?
t 1 >
'I
- L 'i
. (
i i
'[
t l.
$n W
i I
OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE NOVEMBER 15, 1990 i
COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISOR REPORTS GROUP PEACH BOTTOM ATOMIC POVER STATION TELEPHONE (717)456-7014 EXT.3321 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:
- 2. REPORTING PERIOD:
OCTOBER, 1990 3.LICENSEDTHERMALPOWER(MVT):
3293 UNIT TAKEN OFF LINE AT 1:30 AM
- 4. NAMEPLATE RATING (GROS $ WE):
1152 OCTOBER 27, 1990 FOR MID-CYCLE 5.DESIGNELECTRICALRATING(NETMWE) 1065 0UTAGE.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MVE):
1035
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) $1NCE LAST REPORT, GIVE REASONS:
9,POWERLEVELTOVHICHRESTRICTED,IFANY(NETMWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THis MONTH YR-TD-0 ATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745-7,296 139,008
- 12. NUMBER OF HOUR $ REACTOR WAS CRITICAL 626.6 6,886.6 84,045.4 l
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
- 14. HOURS GENERATOR ON-LINE 626.6' o,774.0 81,176.2~
- 15. UNIT RESERVE SHUTDOVN HOURS 0.0 0.0 0,0 16.GROSSTHERMALENERGYGENERATED(MWH) 1,999,536 20,929,445 237,092,314
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 666,600 6,893,500 77,765,632 18.. NET ELECTRICAL ENERGY GFNERATED (MVH)-
642,992 6,653,287 74,495.855 PAGE 1 0F 2 I
t
=
I t
V [; i
.l OPERATINGDATAREPORT(CONTINUED)
DOCKET NO 50 + 278 ;
I
~
l 4
m.
DATE NOVEMBER 15.-1990 -
1 4
l
-THl3 MONTH YR-TEDATE
-CUMULATIVE
^
19.~ UNIT LERVICE FACTOR 84.1 92.8 58.4 i
- 20. UNIT, AVAILABILITY FACTOR 84.1 92.8 58.4 i
21.UNITCAPACITYFACTOR(USINGMDCNET) 83.4 88.1 51.8 22.UNITCAPACITYFACTOR(USINGDERNET) 81.0, 85.6 50.3-
+
- 23. UNIT FORCED OUTAGE RATE
- 0. 0.
= 5.6 12.7 24, $HUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
M![> CYCLE MAINTENANCE OUTAGE STARTING OCTOBER 27, SCHEDULED FOR 21 DATS.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUPt i
NOVEMBER 14, 1990'
- 26. UNIT $.INTESTSTATUS(PRIORTOCOMMERCIALOPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY-08/07/74 INITIAL ELECTRICITY 09/01/14
-COMMERCIAL OPERATION
-12/23/74 4
- t i
-i
?
l 0-e s
p '
3- :
PAGE 2 0F 2 l'
t i
t l
i
~
UNIT SHUT 00VNS AND POVER REDUCil0NS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 DATE NOVEMBER IS, 1990 i
REPORT MONTH OCTOBER. 1990 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY.
hPRV 0 REPORTS GROUP PEACH BOTTOM ATDMIC POVER STATION r
TELEPHONE (717) 456-7014 EXT 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO a
NO, DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT f (4)
(5).
PREVENT RECURRENCE j
18 901001 F
0.0 A-4 N/A HH-PUMPXX
2C" C0"DENSATE PUMP TAKEN OUT OF SERVICE FOR PUMP PACK!NG PROBLEMS. REACTOR WAS NOT SHUT 00VN.
'10 901001 5
0.0
.B 4
N/A.
HC HTEFCH CLEAN WATER BOX TUBE SHEETS.
REACTOR WAS NOT SHUT DOWN.
1 20 001016 S
' 0.0 H
4 N/A RB CONR00 CONTROL R00 PATTERN ADJUSTMENT.
REACTOR WAS NOT SHUT DOWN.
21 901020 5
0.0 H
4 N/A RB CONR00-CONTROL R00 PATTERN ADJUSTMENT.
1 REACTOR WAS NOT SHUT 00WN.
)
l (1)
(2)
(3)
(4)
F - FORCEO REASON METH00.
EXHIBli G - INSTRUCTIONS I
$ - SCHEDULED-A - EQUIPMENT FAILURE (EXPLAIN) 1 - HANUAL FOR PREPARATION OF DATA 1
B - MAINTENANCE OR TEST 2 ~ HANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING -
3 - AUTOMATIC SCRAM.
EVENTREPORT(LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)-
i E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN) l H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE
.i UNIT $HUTDOWNS AND POVER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH B0TTOH UNIT 3 DATE NOVEMBER 15. 1930 REPORT MONTH OCTOBER. 1990 COMPLETED BY PHILADELPHIA ELECTRIC COMPAN)
H. J. BARON SUPERVl$0R REPORTS GROUP PEACH BOTT0H ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON
$ HUTTING DOWN EVENT CODE CODE ACTION 10
' NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT f (4)
($)
PREVENT RECURRENCE
~ 17 901023 F
0.0 H
4 N/A XX XXXXXX LOV RECOMBINER TEMPERATURE-O!FFERENCE.
REACTOR VAS NOT $ HUT 00WN.
.l!
18 901026 5
119.4 H
1 N/A ZZ ZZZZZZ Mio-CYCLE OUTAGE.
119.4-(1)'
(2)
(3)
(4)
'F - FORCEO REASON HETH00 EXHIBli G - INSTRUCTIONS 5 - SCHE 0ut.ED _ A-EQUIPMENTFAILURE(EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY $HEETS FOR LICENSEE _
C - REFUELING 3 - AUTOMATIC SCRAM.
EVENTREPORT(LER) 0 - REGULATORY' RESTRICTION 4-OTHER(EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE
($)
G-OPERATIONALERROR(EXPLAIN)
H-OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE
.