ML20058H791

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Oct 1990 for Peach Bottom Units 2 & 3 & Revised Repts for Jan & Mar 1990
ML20058H791
Person / Time
Site: Peach Bottom  
Issue date: 11/14/1990
From: Miller D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058H794 List:
References
NUDOCS 9011260044
Download: ML20058H791 (2)


Text

'CCN 90-14215 T

PIIILADELPIIIA ELECTRIC COMPANY e'

h,,

Pl%Cll lK71 IDM A10MIC POWl'.R STATION R. D. I, llox 208 s% t Delta, l'entnylvania 17314 reacu mornne-tus Pos ea os e urttaw a

(*17) 4 % -7014 D. B. Miller, Jr.

Vice President November 14, 1990 Docket Nos. 50 277 50 & 8 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:

Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of October 1990 fomarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Also included are corrections to the January 1990 report for Unit 2 and Unit 3 and to the March 1990 report for Unit 3.

Sincerely, y]

- p..hd [I ^

N A-7 1%'JG DBM/AAF/JBC/DRM/MJB: cmc Enclosure ec:

R.A. Burricelli, Public Service Electric & Gas i

T.M. Gerusky, Commonwealth of Pennsylvania JJ. Lyash, USNRC Senior Resident Inspector R.

McLean, State of Maryland i

T.T. Martin, Administrator, Region I, USNRC H.C. Schwemm, Atlantic Electric J. Urban, Delmarva Power INPO Records Center CC1090.NRC 1lb y

a

\\

i

1 l

bec:

J.A. Basilio / FDL EJ. Cullen J.M. Madara

.j H. Braun J. W. Durham A.J Marie D.A. Cartwright A.A. Fulvio CJ. McDermott R.N. Charles J.F. Franz -

D.R. Meyers Commitment Coordinator K.R. Graff PBNR (331)

Correspondence Control Desk D.R. Helwig E.F. Sproat J.B. Cotton G.A. Ilunger PJ. Valenti l.

l l

CC1090.NRC l-