Text
_
i L
j i
GPU Nuclear Corporation f
M s a dw w G E a.
one upper eono naae EWMS Parsippany, New Jersey 07054 201-316-7000 TE LEX 136-482 Writers Direct Dial Number i
i December 3, 1993 C000-93-2304 C321-93-2311 l
U. S. Nuclear Regulatory Commission Attention: Document Control Desk l
Washington, DC 20555 Gentlemen:
Subject:
Oyster Creek Nuclear Generating Station (0CNGS) f Docket No. 50-219/ License No. DPR 16 Integrated Schedule - ABC Projects Listing r
Project List Semi-Annual Update j
Pursuant to condition 2.C.(10) of Operating License DPR-16, GPU Nuclear has implemented the Long Range Planning Program for OCNGS. As required by Section V.A of the Plan, the following attachments are submitted to provide the semi-annual project list update.
1.
Attachment A contains a new project list of Category A, B and C projects, annotated by an asterisk (*) to identify new projects.
Completed projects have been removed from the schedule listing. Also noted by a. double asterisk (**) are 1
budget activity numbering changes.
2.
Attachment B contains a summary of Category A, B, and C projects which have been completed, deleted, deferred, thanged in scope.
Category A and B projects which have had schedule changes are provided with explanations, as appropriate.
0900Ti g;
9312130170 931203 PDR ADOCK 05000219 f
i P
PDR GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation
~
December 3, 1993 C000-93-2304 C321-93-2311 Page 2
}
One (1) Category B project has been added to the project schedule, as shown on Attachment A.
In addition, one (1) Category B project schedule change and two 1
(2) activity changes (period identification update) are discussed in
)
Attachment B.
Pursuant to the LRPP for Oyster Creek, it will be assumed that i
you are in agreement with the actual Category B changes above if you do not respond to this submittal within 15 days of receipt.
Sincerely, l
R. L. Long Vice President and Director i
Services & THI-2 Divisions RLL/GMG/ pip cc: Director, Project Directorate I-4 1
Oyster Creek NRC Project Manager Region I, Administrator Senior NRC Resident Inspector, OCNGS 1
a 9
e I
f r
ATTACHMENT A PROJECT LISTING
+
INTEGRATED SCHEDULE SEMIANNUAL UPDATE (DECEMBER 1993) i f
i l
-l l
OYSTER CREER PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.
~ ~ - - - - -
- BA NUMBER CHANGE CATEGORY
'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03DEC93 OBS BA DESCRIPTION CYCIE/
CIASSITICATION NUMBER YEARS 1 315302 SEP MPIC III-1 14 NRR INCORPORATE RESULTS IN AN UPDATE M THE FSAR.
2 402910 C R RECORDERS 14 NRR CR REMOVE AND REPLACE 5 DEFICIENT / OBSOLETE RECORDER GROUPS (7 RECORDERS), AND DELETE 6 RECORDERS. NUREG 0737 SUPP. 1 3 402944 RX BLDG ROOI FRAFIB 14 NRR 119 ADD BRACING TO THE R B ROOF' STRUCTURE M ENSURE ROOF STABILITY UNDER HIGH WIND LOADS..NRC SEP 4 409772 ACCESS CONTROL UPGRADE. CONTROL ROOM 14 NRR s
PROCUREMENT & INSTALLATION OF KEY CARD READER UNITS W/ ALARM FOR CONTROL ROOM j
AND NEW CABLE SPREADING ROOM S 328030 CNTL RM HUMAN FACTORS DESGN REVIEW 14/15 NPR CR REPAINT, REFURBISH & REIABEL CR PANELS 1R THRU 10R,6KR,11XR,12R,12XR 14R,14XR, 16R AND 11F,9KR&11R.NUREG 0737 SUP 1.
I 6 328226 SQUG PROGRAM IMPIEMENTATION 14/15 NRR ESTABLISH SEISMIC QUALIFICATION FOR j
OYSTER CREEK. SCOPE INCLUDES WALKDOWNS IN OUTAGE 15R AND EVALUATIONS I
I l
7 403019 RPV WATER LEVEL INSTRUMENTATION 140/15R NRR MODIFY THE RPV WATER LEVEL INSTRUMENTS M MEET NRC REQ'R BY USING YARWAY COND. CHAMBER WITH UNHEATED REF. LEGS
- i.
1 OYSTER CREEK PROJECT LISTINC LEGEND-NRC INTEGRATED SCHEDULE
'M PROJECTS M NLHBER CHANGE CATECORY
'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03DEC93
' OBS BA DESCRIPTION CYCLE /
CIASSITICATION NbH.BER YEARS i
t 9 328280 RCS STRESS IMPROVEMENT ISR NRR DW RB23 PERFORM STRESS IMPROVEMENT ON16 RECIRC SAFE. ENDS (SUCTEDISCH),13SDC,2 CORE SPRAY 25 ISO COND. WELDS. MSIP TO BE USED.
t 9 328353 RCS AUG. ICSCC INSPECTION-15R 15R NRR DW RB75 RB95 INSPECT 157 PIPING WELDS PER G.L.
88-01 AND NUREG 0313 REV.2 10 402910 C R RECORDERS 15R NRR CR REMOVE AND REPIACE 3 DEF1CIENT/ OBSOLETE RECORDER GROUPS-(6 RECORDERS), AND DELETE 2 RECORDERS. NUREG 0737 SUPP. 1 11 402974 OC RX OVERTILL PROTECTION SYSTEM 15R NRR CR MODIFICATIONS TO FW PUMPS TRIP CIRCUITRY NRC CEN. LETTER 89-19 12 403005 REG GUIDE 1.97 INSTRUMENTATION ISR NRR i
CR RB REPIACE/ INSTALL RX. h20 LEVEL FUEL EONE REC. & PWR SUPPLY & Pt.STR SYS UPGRADE, UPGRADE PWR SUPPLY TO CONT ISOL VLVS 13 32XAME RCS AUG. IGSCC INSPECTION - 16R 16R NRR RB DW l
INSPECT PIPING WELDS PER NUREG 0313 PEV2 14 32XAHE RCS AUG-IGSCC INSPECTION - 17R 17R NRR I
RB DW INSPECT PIPING WELDS PER NUREG 0313 REV2 L
I
_,_._.____..____.__.....m.,_
.m.
OYSTER CREEK. PROJECT LISTING LEGEND NRC INTECRATED SCHEDULE NEW PROJECTS.
....~..-...--.
" BA NUMBER CHANGE CATEGORY
'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STA111S AS OF 03DEC93 OBS BA DESCRIPTION CYCLE /'
CLASSIFICATION NUMBER YEARS 15 326216 RX. VESSEL BELTLINE INSPECTION 17R NRR 119 UT ACCESSIBLE WELD SEAMS IN Ti!E RPV BELTLINE REGION. INSPECTIONS WILL BE DONE R M.Y. ASMS SECT. XI REQUIREMENTS 16 '328205 SQUG SUPPORT & PARTICIPATION - BWROG 87 96 NRR PARTICIPATION IN SEISMIC QUALIFICATION UTILITY GROUP FOR EQUIP SEISMIC QUA-LIFICATION. UNRESOLVED SAFETY ISSUE.
17 328312 MOV PROGRAM 90 94 NRR DESIGN BASIS REVIEW, STRESS ANALYSIS AND TESTING OF MOV'S IDENTIFIED BY Tl!E PROGRAM PER NRC GL 89-10.
2 m+e-+e r eme. -wewe st-w e t-ww-seer 4--rre-F<we +---s--+-wmeem
--&v***+--w-+-*awee---swseme-e r e r w-ore-+
ee m
+-e,wrs-c-e+1-
-,--m--r%e-+-
w-nww-~m--+- e # ew re-s-e-n--
m s.wwww,sssrw a--e
- +-
e-wv---r-+-me.,ees m..ma_--4-_,
m ma w
i-OYSTER CREEK PROJECT L1STINC IEGEND NRC INTECRATED SCHEDULE NEW PROJECTS,
- BA NUMBER CHANGE CATEGORY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03DEC93 06S BA DESCRIPTION CYCLE /
- CLASSIFICATION NUMBER YEARS 18 313624 VALVE MAINTENANCE & OVERHAUL-14 MRC TB DW RB CORRECTIVE & PREDICTIVE MAINTENANCE OF SELECTED VALVES.
19 323704 VALVE RELIABILITY MAINTENANCE 14 MRC RB TB DW CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES 20 402823 GROUNDING & LIGHTNING PROTECTION 14 ISM YARD INSTALL LIGHTNING PROTECTION FOR STACK OC SPENT FUEL STORAGE CAPACITY EKPANSION 14 ORR 21 402880 GAS TANK REIDCATION ON BACKSITE 22.323L48 SPENT TUEL TRANS TO PERMANENT SMRAGE 15 IOE TRANSFER SPENT FUEL FROM FUEL POOL TO DRY STORAGE FACILITY 23 323704 VALVE RELIABILITY MAINTENANCE 15 MRC RB TB DW CORRECTIVE AND PREDICTIVE MAINT ON l
SELECTED VALVES l
24 402880 OC SPENT FUEL STORAGE CAPACITY EXPANSION 15 ORR i
l INSTALL PERIMETER INTRU$10N DETECTION SYSTEM (PIDS)
^
OYSTER. CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.
- BA NUMBER CHANGE CATEGORY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STAMS AS OF 03DEX'93 m
OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 1
25 323695 CONTAINMENT ISOLATION VALVE MAINT ISR NRR RB DW p
PERFORM CORRECTIVE MAINTENANCE ON CONTAINMENT VALVES WHICH DO NCTI PASS LLRT 26 323697 ASBESMS ABATEMENT 15R ORR CB LEVEL OF EFFORT ASBES MS REMOVAL / REPAIR OF EXPOSED FRIABLE ASBESTUS REFUEL FICOR-RK DISASSEMBLY /RFASSEMBLY -
15R MRC 27 323700 TASKS ASSOCIATED WITH REACTOR DISASSEMBLY AND REASSEMBLY AND SUPPORTING ACTIVITIES 28 323704 VALVE RELIABILITY MAINTENANCE 15R MRC RB TB DW CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES 29 323706 CRD HCU REBUILD ISR '
MRC RB INSPECT & REBUILD EQUIVIIANT OF 35 CRD ECUS. REPLACE V-117 & V-118 VALVES i
30 323710 TURBIFE Cuwvat.nr & CENERAMR INSP-15R 15R MRC TB INSPECT LP,GENERAMR, VALVES &
t l -
MOISMRE SEPERAMR/ REHEATER FOR NML REQUIREMENTS AND MANUF. SUGGESTION 31 326105 DRYWELL SCAFFOLDING & INSULATION 15R CWC l
DW INSTALLSCAFFOLD IN D.W. M SUPPORT ALL ACTIVITIES. REMOVE & REINSTALL D.W.
INSULATION. REMOVE SCAFFOLD l-1 I
._-.~.---.-_..._.._.e...,
. ~,. _.. _ -. - - ~ _. _.,.... _ - - -.
......--..-...__~....._-.,..,--.__......_m.
OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.
++ BA NUMBER CHANGE CATEGORY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03DEC93 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 32 326328 OUTAGE ISI.15R 15R NRR
- ALI, INSPECT HANGERS, PIPING WELDS,6 CCPIPONENTS M SATISFY SECTION XI REQUIREMENTS 33 328352 RX V INTERNAL INSPECTION-ISR 15R hWL 119 VISUAL INSPECTION OF SELECPED INTERNAL COMPONENTS AND SURFACES AS REQ'D BY ASME CODES.
34 328357 PIPE WALL THINNING-15R 15R ISM TB RB REMOVE INSULATION, PREP. SURFACE &
PERFORM UT ON SELECTED PIPING SYSTEMS.
POSSIBLE REPLACEMENT OF FITTINGS / PIPING 35 402898 REPL UPPER TB & OLD MACHINE SHOP ROOP ISR MRC YARD REPLACE THE UPPER WRBINE BUILDING ROOF.
36 402901 FEEDWATER SYSTEM IMPROVEMENTS ISR REL CR NCSR I
REPIACE GEMAC SYSTEM WITH A DIGITAL CONTROL SYSTEM.
37 402925 GENERAM R PROTECTION UPGRADE 15R ISM TB ADD RELAYS AND AIARMS W PROTECT THE GEN AS PER PJM m uruu.avATIONS.
38 402929 DIGITAL RECIRC FIOW CONTROL 15R 15R REL CR REPLACE GEMAC HARDWARE WITH DIGITAL SYSTEM. THIS SCOPE HAS BEEN INCLUDED IN B/A 402901B.
- 1 I
b I
. _....., +...
n..-.-...~
, -, ~ - ~. - -.. - - - - - - - - - - - - - -
-,. ~ - -
-- ------v.
m OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.
- - BA NUMBER CHANGE CATEGCRY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STAIUS AS OF 03DEC93 CBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS 39 402939 DRYWELL EXPOSURE REDUCTION MODS.
ISR RAD DW INSTALL IMPROVED EQUIPMENT IN 1-8 SUMP AND HYDROLAZE AND RECOAT l-8 SUMP 40 402961 OC EDG OUTPUT CONTROL MODIFICATION ISR MRC TB REPLACE THE EXISTING GOVERNOR WITH A WOODWARD AUTOMATIC GEN ICADING CONTROL, REPLACE MISC. ELECTRICAL COMPONENTS.
41 402966 RECIRC FLOW SCRAM ELECTRONICS REPLACEM'T ISR ORR RB CR REPLACE EXISTING ELECTRONICS WITH DIGITAL ELECTRONIC EQUIPMENT.
42 403024 SQUG MODS ISR NRR RB TB IMPLEMENT MODS RESULTING FROM SQUG WALKDOWN IN 15R. SCOPE NOT YET DEFINED.
VALVE REPLACEMENT /RETIRDIENT - 15R 15R REL 43 408895 RB TB DW REPLACE SEIECTED VALVES IDENTIFIED AS HAVING MAJOR DEFICIENCIES 64 323L48 SPENT FUEL TRANS TO PERMANENT STORAGE 16 IOE TRANSFER SPENT PUEL FROM FUEL POOL TO DRY STORAGE FACILITY 45 32XAHA PIPE WALL THINNING - 16R 16R ISM RB TB REMOVE INSULATION, PREP SURFACES t.
PERFORM UT ON SELECTED PIPING SYSTEMS, POSSIBLE REPLACEMENT Of FITTINGS / PIPING
..1
OYSTER CREEK PROJECT LISTING i
. IEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.
- BA NUMBER Cf1ANCE CATEGORY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03DEC93 083 BA DESCRIPTION CYCLE /
CLASSIFICATION NUM1 YEARS 46 32XAMD RX. VESSEL INTERNAL INSPECTION.16R 16R hM 119 VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES A$ REQUIRED BY ASME CODES 47 323LO3 MRBINE INSP. 16R.
16R MRC TB INSPECT LPC AND OTHER TURBINE RELATED COFJONENTS FOR hML NML REQUIREMENTS AND MANUF. SUGGESTION 48 323LOS CONTAINMENT ISOLATION VALVE MAltTP 16R NRR PERFORM CORRECTIVE MAINTENANCE ON VALVES WHICH DO NOT PASS THE LLRT 49 323Ll4 ASBESMS ABATEMENT.16R 16R ORR CB RB TB IEVEL OF EFFORT TO REMOVE ASSESMS M SUPPORT OUTAGE WDRE l
50 323L35 VALVE RELIABILITY & MAINTENANCE-16R 16R MRC RB TB' UW PERFORM CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES S1 323L39 CRD tiCU REBUILD. 16R 16R MRC RB REBUILD HYDRAULIC CONTROL UNITS 52 323LS2 REFUEL FLOOR RK DISASSEMBLY / REASSEMBLY 16R MRC 119 TASKS ASSOCIATED WITH REACTOR DISASSEMBLY AND REASSEMBLY AND SUPPORTING ACTIVITIES
. ~. _
4 0YSTER CREEK PROJECT LISTING t
3 MRC INTEGRATED SCHEDULE NEW PROJECTS
- BA NUMBER CIWJGE CATEGORY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OP 03DEC93 OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMEER YEARS 1
1 53 326L15 DRYWELL SCAFFOLDING & INSULATION-16R 16R GWC DW INSTALL SCAFFOLD IN D.W.
TO SUPPORT ALL ACTIVITIES. REMOVE & REINSTALL D.W.
INSULATION. REMOVE SCAFFOLD 54 32696G OUTAGE ISI 16R NRR ALL j
INSPECT KANGERS, PIPING WELD,&
COMPONENTS TO SATISFY SECTION XI REQUIREMEN
i 55 402821 RX RECIRC PUMP & MO'IOR VIBRATION MONITRS 16R MRC DW RB CR INSTALL VIBRATION HONITORING TRANSDUCERS i
AND SUPPORT EQUIP. FOR 4 RECIRC PUMPS 7 TRANS./ PUMP AND 5 FOR 1 PUMP.
56 402948 LP TURB. C LAST STAGE BLADS INSTALLATION 16R REL TB REPLACE LAST STAGE BLADES IN LP IURBINE "C".
BLADE FAILURE CONCERNS.
l l
57 403024 SQUG MODS 16R NRR IMPLEMENT MODS RESULTING FROM SQUG i
WALKDOWN IN 15R. SCOPE NCTF YET DEFINED l
i 58 408L25 VALVE REPLACEMENT / RETIREMENT-16R 16R REL RB TB DW REPIACE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENCIES 59 32XAHA PIPE WALL THINNING - 17R 17R ISM RB TB REMOVE INSULATION, PREP SURFACES &
PERFORM UT ON SELECTED PIPING SYSTEMS.
POSSIBLE REPIACEMENT OF FITTINGS / PIPING
.......~..
...u..
........ ~..
m m
I OYSTER. CREEK P R O J E.C T LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.
- - - - - - -. = =
4
- BA NUMBER CHANGE
[
1 CATEGORY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 03DEC93
.... ~
. OBS BA DESCRIPTION CYCLE /
CLASSIFICATION NUMBER YEARS i
60 32XARD RX. VESSEL INTERNAL INSPECTION -17R 17R NRR 119 VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES 61 323LO3 TURBINE INSP. 17R 17R MRC TB INSPECT MISCELLANEOUS TURBINE RELATED COMPONENTS FOR NML REQUIREMENTS AND MANUF. SUGGESTION 62 '323 LOR CONTAINMENT ISOIATION VALVE MAINT 17R NRR PERFORM CORRECTIVE MAINTENANCE ON VALVES WHICH DO NOT PASS THE LLRT 63 323Ll4 ASBESTOS ABATEMENT-17R 17R ORR CB RB TB LEVEL OF EFFORT TO REMOVE ASBESTOS i
70 SUPPORT OUTAGE WORK 64-323L35 VALVE RELIABILITY & MAINTENANCE-17R 17R MRC RB TB DW PERFORM CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES r
65 323L39 CRD HCU REBUILD. 17R 17R MRC RB REBUILD HYDRAULIC CONTROL UNITS 66 323LS2 REFUEL FLOOR RK DISASSEMBLY / REASSEMBLY 17R NRC 119 i
TASRS ASSOCIATED WITH REACTOR DISASSEMBLY AND REASSEMBLY AND SUPPORTING ACTIVITIES ~
OYSTER CREEK PROJECT' LISTING IEGEh"J NRC INTEGRATED SCHEDULE NEW PROJECTS.
- BA NUMBER CHANGE CATEGORY
'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STAIVS AS OF 03DEC93 085 BA DESCRIPTION CYCLE /
CIASSIFICATION NUMBER YEARS
- 7 326L15 DRYWELL SCAFFOLDING & INSULATION.17R 17R GWC DW INSTALL SCAFFOLD IN D.W. TO SUPPORT ALL
-ACTIVITIES. REMOVE & REINSTALL D.W.
INSUIATION. REMOVE SCAFFOLD 68 32696G OUTAGE ISI 17R hTR ALL INSPECT HANGERS, PIPING WELD,6 CO*tPONENTS to SATISFY SECTION XI REQUIREMENTS 69 408L2$
VALVE REPLACEMENT / RETIREMENT.17R 17R REL RB TB DW REPIACE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENCIES l
70 -328149 0.C. PIANT LIFE ASSURANCE & EXTENSION 92 94 REL DEVEIOP 3. PHASE PLEX PIAN. PHASE 1 k
TO DETERMINE FEASIBILITY AND COST /
ANALYSIS FOR LIFE CYCLE MANAGI: MENT.
71 402982 INDIVIDUAL PLANT EXAM.. EXTERNAL EVEN~rs 92-95 NRR PERFCRM IPE ANALYSIS OF EXTERNAI, EVENTS FOR SEVERE ACCIDENT VULNERABILITIES BY 6/39/95, BUT NO IATER THAN 12/22/95 72 409229 NUMARC PROCUREMENT INITIATIVE 92 96 NRR IMPROVEMENTS 70 PROCUREMENT QA 70 MEET THE REQUIREMENTS OF THE NUMARC PROCURE.
MENT AND NRC GEN LTR.
73 402980 CONFIGURATION MANAGEMENT.DBD 92-98 92 98 ISM DEVEISPMENT OF OC SYSTEM DESIGN BASES PERFORM 4 TO 5 DBD'S PR YEAR OVER 5 YEARS.
OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS.
- ~~--
- BA NUMBER CHANGE CATEGORY
'C' PROJECTS SCRT BY CATEGORY / CYCLE /BA STATUS AS OF 03D'493
. = =.
OBS BA DESCRIPTION CYCIE/
CLASSIFICATION NUMBER YEARS 74 402860 OC SPENT FUEL STORAGE CAPACITY EXPANSION 93-94 ORR LICENSING AND ENGR. IVR MAhWACTURE OF DRY STORAGE CASKS.
3 FOUNDATION 75 409256 REPLICA SIMULATOR MODS 93-94 NRR UPGRADE TEE SIMULAMR M MAKH PLANT NODS AS APPLICABLE 76 402981 ACCIDENT MANAGEMENT GUIDELINES 93 95 NRR DEVELOP ACCIDENT MANAGEMENT GUIDELINES TO COPE WITH DAMAGED CORE EVENTS (PART OF IPE REQUIREMENTS, G.L. 88-20).
77 409L10 REPLICA SIMUIATOR MODS 95 NRR MODIFY THE SIMUIATOR AS NECESSARY W MAINTAIN LIKENESS WITH CONTROL ROOM AS REQUIRED j
78 409958 REPLICA SINULATOR MODS 95 NRR UPGRADE THE SIMUIATOR 10 MATCH PIAVE MODS AS APPLICABLE 1
1 -
... m.
~. -
4.
..--...--..........m.
-,. _ -.. -. _..., ~... - -...... _..,. _ _.. -.... -.. - -. _ _.. _.. _.. -. _..
ABC Classifications I
a) lieet NRC Recuirements (NRR) - Activities that a) must be carried out to f
fulfill specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished would result in an NRC non-compliance even though the specific activity is not required by I
the NRC.
)
b)
Meet Environmental Recuirements (ERR) - Activities that a) are specifically required by environmental regulatory agencies (State and Federal) or b) have been committed to environmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency, t
c)
Meet Other Recuirements (ORR) - Activities not covered by the NRC or l
environmental requirements but that are required by local, state, or federal ordinances, codes, court order or lawsuit settlement, or other guidance to which the Company is committed or if not accomplished would result in a violation of that ordinance, code or guidance, court order, etc.
I d)
Increase Safety Marains (ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety but are neither required for regulatory compliance nor required by safety regulations, codes or guidance.
e)
Decrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required i
for regulatory congliance nor required by environmental regulations, codes or guidance.
f)
Improve Radioloaical Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man-rem exposure i
rates, or radwaste control / reduction but are neither required for
~
regulatory compliance nor required by radiological regulations, codes or guidance.
g)
Maintain Reliability / Capability (MRC) - Activities that, if implemented, I
will maintain power production at existing levels by preventing l
deterioration of plant systems or equipment.
Includes activities in response to national codes and standards, insurance policies, equipment vendor specifications or nuclear industry high unavailability equipment data without which the plant could not operate prudently, h)
Improve Reliability / Capability (REL) - Activities that, if implemented, i
will increase power generation by improving availability or capacity factor to maximize energy output.
1 l
ABC Classifications (continued)
{
)
i)
Improve Operational Effectiveness (10E) - Activities that, if implemented, will improve staff efficiency or provide a direct economic payback in terms of reduced operating / maintenance costs.
t j)
Improve Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities, k)
Provide Continaency/ Blanket (',UI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing reqcirements to procure, replace or repair minor items essential to support routine operations.
1)
Improves Heat Rate Performance (HRP) - Activities, that, if implemented, will increase power production by enhancing the heat rate efficiency.
1 4
I t
k ATTACHMENT B OYSTER CREEK NUCLEAR GENERATING STATION NRC INTEGRATED SCHEDULE l
SEMIANNUAL UPDATE CATEGORY "B" PROJECTS ADDITIONS:
As denoted by
- next to the Project Title in Attachment A.
SCHEDULE CHANGES:
328280 RCS Stress improvement The 16R outage activity to perform stress improvement on four vessel inlet recirc. safe ends will be included in the stress improvement scope for the 15R outage.
OTHER CHANGES:
328030 Control Room Human Factors Desian Review This activity has been combined into one entry (Obs. #5) which includes both Cycle 14 and 15.
Scope remains unchanged.
328205 SOUG Support and Participation - BWROG Change cycle / years from 87-97 to 87-96.
i
[
U
-i
CATEGORY "C" PROJECTS ADDITIONS:
As denoted by
- next to the Project Title in Attachment A.
l DELETIONS:
402736 Dual Valve Indication Removal - Ph.1 402957 IA83 Analog Conversion 40994B Replica Simulator Mods - 94.
However, the scope is included in B/A 409256, Replica Simulator Mods 93-94.
SCOPE CHANGE:
402823 Groundina & Lichtnina Protection - Cycle 14 scope will include lightning protection on the stack i
only.
OTHER CHANGES:
The following B/A Numbers have been changed:
t PREVIOUS NEW OBS #
TITLE B/A B/A 19, 23, 28 Valve Reliability Maintenance 323L34 323704 25 Cont. Isolation Valve Maint.
323LO7 323695 26 Asbestos Abatement 323L13 323697 27 Refuel. Floor - Reactor Disassembly / 323L22 323700 i
Reassembly 29 CRD HCU Rebuild 323L38 323706 30 Turbine Component & Generator 323L47 323710 Inspection - 15R 31 Drywell Scaffolding & Insulation 326L14 326105 32 Outage ISI - 15R 32694J 326328 34 Pipe Wall Thinning - 15R 328AGZ 328357 42, 57 SQUG Mods - 15R, 16R 402ABQ 403024 43 Valve Replacement / Retirement - 15R 408L24 408895 i
The following cycle / years have been changed:
PREVIOUS NEW OBS #
TITLE CYCLE /YR.
CYCLE /YR.
70 OC Plant Life Assurance & Extension 92-95 92-94 73 Configuration Management - DBD 92-96 92-98 74 0C Spent Fuel Storage Capacity 14 93-94 Expansion 75 Replica Simulator Mods 93 93-94 L
i
.