D
/,
e,
UNITED STATES
c
p *'
' , ,
NUCLEAR REGULATORY COMMISSION
{
E
REGION V
_
7
%
/
1450 MARIA LANE
%,
WALNUT CREEK CAUFORNIA 94596-5368
,
HOV121993
'
Docket Numbers 50-361 and 50-362
Southern California Edison Company
Irvine Operations Center
23 Parker Street
Irvine, California 92718
Attention:
Mr. Harold B. Ray
Senior Vice President, Power Systems
SUBJECT:
NRC INSPECTION REPORT NOS. 50-361/93-34 AND 50-362/93-34
This refers to the routine announced in'spection conducted by Mr. F. Gee of
this office during the period of October 25 through October 29, 1993. The
inspection covered activities authorized by NRC License Numbers NPF-10 and
NPF-15. The results were discussed with members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
-
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
No violations or deviations were identified within the scope of this
inspection.
In accordance with 10 CFR Part 2.790(a), a copy of this letter and its
enclosure will be placed in the NRC Pcblic Document Room.
'
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
f
'
F. Miller Jr , Chief
'
Reactor Safety Branch
L
Enclosure:
Inspection Report Nos. 50-361/93-34 and 50-362/93-34
,
93121300so 931112
I
DR
ADDCK 05000361
'1
J
L
- -
.
-
-
.. .
-
l
.-
.-
.
.
.
..
-2-
'
cc w/ enclosure:
Mr. Edwin A. Guiles, Vice President Engineering & Operations, San Diego Gas
and Electric Company (SDG&E)
T. E. Oubre, Esq., Southern California Edison Company (SCE)
i
Chairman, Board of Supervisors, County of San Diego
Mr. Sherwin Harris, Resource Project Manager, Public Utilities Department
Mr. Charles B. Brinkman, Manager, ABB Combustion Engineering Nuclear Power
Mr. R. W. Krieger, Vice President, Nuclear Generation, SCE
Mr. Don J. Womeldorf, Chief, Environmental Management Branch, California
i
Department of Health Services
Mr. Thomas E. Bostrom, Project Manager, Bechtel Power Corporation
Mr. Robert G. Lacy, Manager, Nuclear Department, SDG&E
~
Mr. Steve Hsu, Radiologic Health Branch, State Department of Health Services
Mayor, City of San Clemente
,
b
+
l
i
l
]
i
i
.
-.
1
'
.-
.
,
.
_.
-3-
bcc w/ enclosure:
Docket Fil'e
,
Resident Inspector.
j
Project Inspector
!
G. Cook
B. Faulkenberry
S. Richards
>
'
C. VanDenburgh
r
bcc w/o enclosure.
M. Smith
J. Bianchi
j
i
FGee @ j
,
l(//0/93
.
AEQ ST COPY]
i
YES / NO ]
.
M
l
HWong
Wang
LMiller
-
'
s' /so/93
(t/(0/93
_
a /n /93
._ _
[0EQUEST COPY]
EQUEST COPY] [ REQUEST
FY]
! (ES
N0 ] YES / NO ] [YES /
40 ]
,
G:\\RSB\\ ENGR \\S9334.R0
l
,TTENDTOPDR] SENDg10 DCS ]
[YES)/ N0 )[YESj/
N0 ]
,
l
.
.
100044
I
!
>
~TCo1-
r
!
.-
.
.-.