Text
.
.
.
g^ o\\
71933
?
Q
v
Docket Nos. 50-295; 50-304
Commonwealth Edison Company
ATTN: Mr. R. Tuetken
Site Vice President
Zion Station
101 Shiloh Boulevard
Zion, IL 60099
Dear Mr. Tuetken:
This refers to the routine safety inspection conducted by J. D. Smith,
V. P. Lougheed, and M. J. Miller of this office from October 12 through
November 23, 1993. This inspection included a review of activities authorized
for your Zion Nuclear Generating Station. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed report.
Areas examined during the inspection are identified in the report.
Within these areas, the inspection consisted of selective examinations of
procedures and representative records, interviews with personnel, and
observation of activities in progress.
>
'
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence.
After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
,
necessary to ensure compliance with NRC regulatory requirements.
l
Additionally, during this inspection, certain other of your activities
d
appeared to be in violation of NRC requirements. As described in the enclosed
'
inspection report, you identified the violation, and to encourage and support
licensee initiatives for self-identification and correction of violations, the
violation is not being cited because the criteria specified in Section VII.B.2
of the " General Statement of Policy and Procedure for NRC Enforcement Actions"
j
(Enforcement Policy, 10 CFR Part 2, Appendix C), were satisfied.
The
.;
inspection showed that actions had been taken to correct the identified
j
violation and to prevent recurrence. Our understanding of your corrective
actions is described in section 8.
I
!
100008
f, l
i
1
-
9312130026 931207
gl
ADOCK 05000295 -
y
1
'
0
,
.
Commonwealth Edison Company
2
7 1391
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
Sincerely,
" Original Signed by Irent Clayten"
Brent Clayton, Chief
Reactor Projects Branch 1
Enclosures:
1.
2.
Inspection Report
Nos. 50-295/304-93020(DRP)
cc w/ enclosures:
L. DelGeorge, Vice President, Nuclear
Oversight & Regulatory Services
A. Broccolo, Station Manager
S. Kaplan, Regulatory Assurance
Supervisor
D. Farrar, Nuclear Regulatory Services
Manager
OC/LFDCB
Resident Inspectors, Zion, Braidwood,
Byron
R. Hubbard
J. McCaffrey, Chief, Public Utilities
Division
Mayor, City of Zion
Licensing Project Manager, NRR
R. Newmann, Office of Public Counsel
SLO, Wisconsin Division of Emergency
Government
State Liaison Officer
Chairman, Illinois Commerce Commission
bcc:
PUBLIC - IE01
RIIg
I /
RIII
L
N
tR b
-
>er
,ausNn
Clayton
@i9
lA/7/O