Forwards Insp Repts 50-295/93-20 & 50-304/93-20 on 931012-1123 & Notice of Violation.Due to self-identification & Correction of Violations Other Violations Were Not Being Cited
ML20058H226
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/07/1993
From: Beverly Clayton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Tuetken R
COMMONWEALTH EDISON CO.
Shared Package
ML20058H233 List:
References
NUDOCS 9312130026
Download: ML20058H226 (3)


See also: IR 05000295/1993020

Text

.

.

.

g^ o\\

DEC

71933

?

Q

v

Docket Nos. 50-295; 50-304

License Nos. DPR-39; DPR-48

Commonwealth Edison Company

ATTN: Mr. R. Tuetken

Site Vice President

Zion Station

101 Shiloh Boulevard

Zion, IL 60099

Dear Mr. Tuetken:

This refers to the routine safety inspection conducted by J. D. Smith,

V. P. Lougheed, and M. J. Miller of this office from October 12 through

November 23, 1993. This inspection included a review of activities authorized

for your Zion Nuclear Generating Station. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observation of activities in progress.

>

'

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence.

After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

,

necessary to ensure compliance with NRC regulatory requirements.

l

Additionally, during this inspection, certain other of your activities

d

appeared to be in violation of NRC requirements. As described in the enclosed

'

inspection report, you identified the violation, and to encourage and support

licensee initiatives for self-identification and correction of violations, the

violation is not being cited because the criteria specified in Section VII.B.2

of the " General Statement of Policy and Procedure for NRC Enforcement Actions"

j

(Enforcement Policy, 10 CFR Part 2, Appendix C), were satisfied.

The

.;

inspection showed that actions had been taken to correct the identified

j

violation and to prevent recurrence. Our understanding of your corrective

actions is described in section 8.

I

!

100008

f, l

i

1

-

9312130026 931207

gl

PDR

ADOCK 05000295 -

y

1

'

0

PDR

,

.

Commonwealth Edison Company

2

DEC

7 1391

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

Sincerely,

" Original Signed by Irent Clayten"

Brent Clayton, Chief

Reactor Projects Branch 1

Enclosures:

1.

Notice of Violation

2.

Inspection Report

Nos. 50-295/304-93020(DRP)

cc w/ enclosures:

L. DelGeorge, Vice President, Nuclear

Oversight & Regulatory Services

A. Broccolo, Station Manager

S. Kaplan, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory Services

Manager

OC/LFDCB

Resident Inspectors, Zion, Braidwood,

Byron

R. Hubbard

J. McCaffrey, Chief, Public Utilities

Division

Mayor, City of Zion

Licensing Project Manager, NRR

R. Newmann, Office of Public Counsel

SLO, Wisconsin Division of Emergency

Government

State Liaison Officer

Chairman, Illinois Commerce Commission

bcc:

PUBLIC - IE01

RIIg

I /

RIII

L

N

tR b

-

>er

,ausNn

Clayton

@i9

lA/7/O