3
0FFICIAL RECORD COPY
JUL 04 1982
Docket Nos. 50-338 and 50-339
Virginia Electric and Power Company
ATTN: Mr. R. H. Leasburg, Vice President
Nuclear Operations
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
SUBJECT: EMERGENCY PREPAREDNESS APPRAISAL
To verify that licensees have attained an adequate state of onsite emergency
preparedness, the Office of Inspection and Enforcement is conducting special
appraisals at each power reactor site. These appraisals are being performed in
lieu of certain routine inspections normally conducted in the area of emergency
preparedness. The objectives of the appraisal at each facility are to evaluate
the overall adequacy and effectiveness of emergency preparedness and to identify
areas of weakness that need to be strengthened. We will use the findings from
these appraisals as a basis not orly for requesting individual applicant and
licensee action to correct deficiencies and effect improvements, but also for
effecting improvements in NRC requirements and guidance.
During the period of February 16-26, 1982, the NRC conducted an appraisal of the
emergency preparedness program at the North Anna Power Station Units I and 2.
AAr emiaqd during this appraisal are described in the enclosed report
-
Q10-338/82-0ji) 50-339/82-05). Within these areas, the appraisal team reviewed
selected procedures and representative records, inspected emergency facilities
and equipment, observed work oractices, and interviewed personnel.
Emergency preparedness deficiencies identified during this appraisal, for which
you have made acceptable commitments to resolve, were discussed in our confirma-
tory letter ( Appendix A) dated March 10, 1982. If the deficiencies addressed in
the confirmatory letter are not corrected by the commitment dates, enforcement
-action will be considered.
The findings of this appraisal also indicate that there are other areas that
should be evaluated and considered for improvement in your emergency preparedness
program. These areas are identified in Appendix B, " Preparedness Improvement
Items", and are discussed in the enclosed report.
We recognize that an explicit regulatory requirement pertaining to each item
identified in Appendix B may not currently exist. .Notwithstanding this, you are
requested to submit a written statement within thirty (30) days of the date of
this letter, describing the results of your consideration of each of the items in
Appendix B.
This request is made pursuant to Section 50.54(f) of Part 50,
Title 10, Code of Federal Regulations.
8208030486 820727
PDR ADOCK 05000338
G
_
_
_
_
.JUL 011982
Virginia Electric and Power Combacy
2
In conjunction with the appraisal, the emergency plan for your facility was
reviewed to insure compliance with applicable regulat'ons. The results of this
review, included as Attachment 2 to the enclosed report, indicate that certain
areas of your plan do not contain sufficient information to demonstrate
compliance with the planning standards of 10 CFR 50.47(b).
Changes to the
emergency plan to correct these areas are to be provided to this office and the
Office of Nuclear Reactor Regulation within 30 days of the date of such change in
accordance with 10 CFR 50.54(q).
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
The responses directed by this letter and the enclosures are not subject to the
l
clearance procedures of the Office Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
t
,
Should you have any questions concerning this appraisal, we will be pleased to
discuss them with you.
Sincerely,
&&
n
James P. O'Reilly
Regional Administrator
Enclosures:
1.
Appendix A, Confirmation of
Action Letter, March 10, 1982
2.
Appendix B, Preparedness
Improvement Items
3.
Office of Inspection and Enforcement
Inspection Report Nos. 50-338/82-05
i
and 50-339/S2-05
'
cc w/ encl:
J. H. Ferguson, Executive Vice President
W. R. Cartwright, Station Manager
P. G. Godwin, Director, Nuclear Security
.
. .
.
- _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
_ _
_
-
-
Virginia Electric and Power Company
3
bec w/ encl:
Document Management Branch -
Commonwealth of Virginia
IE:DEP B. Grimes /F Pagano
NRC Resident ,nspector
)O
ay + y
,L
,t
,,,
.,
a
. . . . .
,
. ,
..,.
.,,.
6 9 /82.
68d82
66cj82
}/ j /82
6/ 9<82
3
-
o
'
..
.