ML20058G792

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-416/82-32 on 820503-07 & Notice of Violation
ML20058G792
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/04/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20058G706 List:
References
NUDOCS 8208030423
Download: ML20058G792 (2)


See also: IR 05000416/1982032

Text

f/ew

-

'

3

.

JUN 4 1982

Mississippi Power and Light Company

ATTN:

Mr. N. L. Stampley

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

Subject:

Report No. 50-416/82-32

This refers to the routine safety inspection conducted by Messrs. G. A. Belisle,

R. C. Butcher, and P. R. Bemis of this office on May 3-7, 1982, of activities

authorized by NRC Construction Permit No. CPPR-118 for the Grand Gulf facility.

Our preliminary findings were discussed with Mr. C. K. McCoy, Plant Manager, at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

perscnnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your . license

appear to violate NRC requirements.

These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appen-

dix A.

Elements to be included in your response are delineated in Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this lett er and the enclosurer. will

be placed in the NRC's Public Document Room unless yot notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedura, of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

1

8206030423 ago7pg

gDRADOCK 05000416

PDR

-

'

,

.

.

Mississippi Power and Light Co,c,'any

2

DUN 4 1982

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

0Nx'e-

R. C. Lewis, Director

Division of Pro.iect and

Resident Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-416/82-32

cc w/ encl:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Mississippi

lbb

,

L

f5

)(h

,ChUpright

3RHerdt

J

shinski

RButcher

GABj/82

lisle:ht

5/]v

5f'82

b! \\ /82

. 2]82

6/ $/82

613 /82