ML20058G420

From kanterella
Jump to navigation Jump to search
Fourth Interim Deficiency Rept Re Failure to Implement Design Criteria in Design Drawings.Initially Reported on 810401.Evaluation Continuing.Next Rept Will Be Submitted by 830117
ML20058G420
Person / Time
Site: Bellefonte  
Issue date: 07/27/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8208030319
Download: ML20058G420 (1)


Text

.

4 TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 3 74ot 400 Chestnut Street Towcr II

-~

m

=

. a::

July 27, 1982 SS

(?

1',

'N:

2 5

BLRD-50-438/81-30 BLRD-50-439/81-33 f,"

U.S. Nuclear Regulatory Cc:nmission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

k n

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - OENERIC IMPLICATIONS OF FAILURE TO IMPLEME!U DESIGN CRITERIA IN DESIGN DRAWINGS - BLRD-50-438/81-30, BLRD-50-439/81 FOURTH INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on April 1, 1981, in accordance with 10 CFR 50.55(e) as NCR BLN QAB 8101. This was followed by our interim reports dated May 1 and,0ctober 22, 1981 and January 22, 198r is still in the process of evaluating the subject deficiencies.

T' oceeding with the review of

~

functional control logic diagrams and ish.ng nonconformance reports where discrepancies are identified. We expect to submit our next report by January 17, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

.(-

Very truly yours, TENNESSEE VALLEY AUTHORITY Y

L. M. Mills, Ma ager Nuclear Licensing oc:

Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement, U.S. Nuclear Regulatory Commission Washington, DC 20555' f

ometALcFla-8208030319 820727 PDR ADOCK 05000438

[

~

S PDR l

An Equal Opportunity Employer

.