Forwards IE Insp Repts 50-348/82-15 & 50-364/82-14 on 820607-10.No Noncompliance Noted
ML20058G386
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 07/09/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20058G387 List:
References
NUDOCS 8208030305
Download: ML20058G386 (2)


See also: IR 05000348/1982015

Text

m )

- * *

OFFICIAL RECORD COPY

\ -.

...

t

JUL 0e 799

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

Subject: Report Nos k 48/82 D J nd 50-364/82-14

This refers to the routine safety inspection conducted by Mr. R. R. Marston of

this office on June 7-10, 1982, of activities authorized by NRC License

Nos. NPF-2 and NPF-8 for the Farley Nuclear facility and to the discussion of our

findings held with Mr. W. Hairston, Plant Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

During the inspection, the inspector noted that one of the completion dates

regarding an emergency preparedness improvement item (Item 8) in your December 14,

1981 letter to Region II, had been overlooked. Adequate corrective action to

resolve the item was taken promptly while the inspector was onsite. Based on

this example, you should review your management controls to assure that they

are adequate to preclude recurrence of similar oversights.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be _ consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

H. C. Dance, Chief

Projects Branch 2

Division of Project and

Resident Programs

Enclosures: (See Page 2)

h$k$00$ 0

o

T Eo/ .

. .

JUL Cg myg

. ..

Alabama Power Company 2

Enclosures:

Inspection Report flos. 50-348/82-15

50-364/82-14

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr. , Senior Vice President

H. O. Thrash, General Manager-fluclear Generation

0. D. Kingsley, Jr. , Manager, fluclear Engineering

and Technical Services

J. W. McGowan, Manager-Safety Audit

and Engineering Review

W. G. Ware, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

bcc w/ encl:

f1RC Resident Inspector

Document Management Branch

State of Alabama

RII RII RIj\[ RII

TW)

RRMarston:ejw 1kIb

<6RJenkins

W7

JRogge

\

JPStbhr

H_C D

HCDance

7/f/82 7/7 /82 7/g/82 7/ g/82 7/ /82

-