$3 tlev 6,,
UNITED STATES
[
n NUCLE AR REGULATORY COMMISSION 5
j W A$HING T ON. D. C. 206b6
,/
November 1. 1990 ty e...*
MEMORANDUM FOR:
Lloyd i. Donn lly, LSS Administrator 1
(
CJu- -
FROM:
John.
Ho 4,
hairman, LSS Advisory Review Pane
SUBJECT:
REPORT ON MEETING OF LSS ADVISORY REVIEW PANEL The LSS Advisory Review Panel, which was established by the Commission in December 1989, held its fourth meeting on October 10 and 11, 1990, in Reno, Nevada.
A summary of the meeting activity follows:
1.
Panel Administrative Issues The Panel discussed administrativo matters and approved the minutes of the June 7, 1990, mooting.
2.
Approval of Document Hender Fields The Panel resumed its discussion (from the June 7,
- 1990, meeting) of information which should be required to be in the header fields and concluded that the "copyeo" and "copyee organization" fields are not necessary.
Two additional fields may be proposed for inclusion after further revision by the heador working group.
A vote will be taken at the next meeting.
3.
Abstractinct of LSS Documents The Panel reviewed the information paper on abstracting prepared by your office and agreed that alternative C.3 should be used for abstracting LSS documents.
Alternative C.3 provides (for specific document types) for storing abstracts in headers for those documents which have abstracts available, but not preparing abstracts just for this field and not allowing this field to be searchable.
4.
Topica1 Guidelinen Mr. Stuart Treby, NRC staff, led a discussion of the changes proposed by NRC to the Interim Topical Guidelines for the content of the LSS.
The Panel members, other than NRC, took the position that if substantive revisions are to be made in the Interim Topical Guidelines, such as the proposed
[M011130107 901101 ADVCM NACL 55AR PDC
Lloyd J.
Donn031y November 1. 1990 deletion of environmental and transportation related documents, they should be made in a formal rulemaking.
The i
Panel members agreed that an appropriate letter should be sent to NRC expressing their views on this subject.
I am preparing such a letter at this time.
5.
LSS Develooment The Panel was briefed by Ms. Barbara Cerny, DOE, on the current LSS implementation schedule.
The current schedule calls for the first node of the system to be operational at UNLV in September 1993.
6.
Science Applications International CorporMtion (SAIC) Desian Documentation Mr. David Nippert, Ms. Dona Mennella, and Mr. Edward Timmes, briefed the Panel on SAIC's design documents including the capture system, the search and image system, and the communications system.
Final documents will be submitted to DOE in November 1990.
The Panel members will be provided copies.
7.
Status of Comoliance Evaluation Program and of Priority Document Production Schedule Mr. Francis X. Cameron, LSSA, brought the Panel up to date on what the LSSA's contractors are doing with respect to assisting LSSA in the formulation of a plan to evaluate LSS participants' compliance with the LSS and in the development of a priority document production schedule for initial loading of the system.
He presented a schedule showing the relative times for future activities in LSS development.
8.
llandlina of Non-Documentary Material in the LSS Mr. Rawley Johnson and Mr. Charles Acree of the Center for Nuclear Waste Regulatory Analyses described their work under contract with LSSA to address the handling of non-documentary data in the LSS.
9.
Schedule for Next Meetina The next Panel meeting is tentatively scheduled for June 12 and 13, 1991, in Bethesda, Maryland.
The following agenda items are proposed for discussion at that time:
Final SAIC Design Documentation Priority Loading Issues
I Lloyd J. Donnelly November 1, 1990 Planning for Participants' Access to the LSS Compliance Evaluation Plans Office of LSSA Work Breakdown Structure Project Management for LSS Procurement j
cc:
Chairman Carr Commissioner Rogers commissioner Curtiss Commissioner Remick OGC SECY LSSARP Members LSS Internal Steering Committee 1
l