Text
.
q..,
.)
SOUTH CAROLINA ELECTRIC AND GAS COMPANY VIRGIL C.
SUMMER NUCLEAR STATION NUCLEAR OPERATIONS POWER OPERATION TESTING STATION ELECTRICAL BLACKOUT POT-11
^""
/^'I LNJC,b b_EA b 0? ERA" ONL>s REVISION 1 g
' ' ~ ~ ~ '
MAY 6, 1982
. COPY No....C"d"0.iQ.M.
b d I. b, SAFETY RELATED (X)
Reviewed by:
j C
0 f2-ORIGINATOR (of this r6 vision)
/ Dhte i
1dhdaC5 s/nkt QUtTLIFIED REVIEWER Date Approved:
3 y
I.5, fS TECHNIbAL SUPERVISOR,//
'Date Date Issued. MAY 2 01%2 Form AP-101-2, (1/80) 8208030257 820729 PDR ADOCK 05000395 A
t t
POT-11 PAGE i REVISION 1 O
5/6/82 LIST OF EFFECTIVE PAGES PAGE REVISION i
1 11 1
1 1
2 1
3 1
4 1
5 1
6 1
7 1
O 8
i 9
1 10 1
ATTACHMENTS ATTACHMENT I 1
O
S POT-11 PAGE il 1
REVISION 1 n,
5/6/82
~
s INDEX 1.0 PURPOSE
2.0 REFERENCES
3.0 PREREQUISITES 4.0 SPECIAL TEST EQUIPMENT 5.0 LIMITS AND PRECAUTIONS 6.0 TEST METHOD 7.0 DATA REQUIREMENTS 8.0 ACCEPTANCE CRITERIA ATTACHMENTS ATTACHMENT I - DATA SHEET 1 - PLANT PARAMETERS
SUMMARY
SHEET 3
t l
l l
O
,--.,n..
____m--
j i
POT-11 PAGE 1 REVISION 1 DATE 5/6/82 3
2 i
i 1.0 PURPOSE l
1.1 To demonstrate that the necessary equipment, controls, and indications are available, following the isolation of the l
of f site power distribution system, to remove decay heat frcm the core using only emergency power supplies, l
+
1 l
i l
' O I
N J
t
.i j
' O
~
i i
i
~. -.
~
POT-11 PAGE 2 REVISION 1 O'
DATE 5/6/82 2.0 REFERENCES 2.1 V.C.
Summer FSAR, Table 14.1-78.
2.2 V.C.
Summer FSAR, Section 8.3.
2.3 AP-170G Power Ascension Test Program.
]
l l
0
POT-11 PAGE 3
)
gS REVISION 1
()
DATE 5/6/82
-3.0 PREREQUISITES INITIAL / DATE 3.1 The plant is operating steady-state at greater than or equal to 10% generator output (P-7 energized)
/
3.2 Operation of OCB8902 has been cleared through the dispatcher and a switching order, form OD54SCE, has been filled in for both opening and closing the breaker.
/
3.3 The normal at-power electrical distribution lineup exists.
Both Diesel Generators are operable.
/
1 1,
~
O 8
e d
3 l
i o
- O
9 0
POT-11 PAGE 4 arvtston i O
DATE 5/6/82 4.0 SPECIAL TEST EQUIPMENT INITIAL / DATE NONE O
l l
l b
O
i POT-11 l
PAGE 5 REVISION 1 DATE 5/6/82 5.0 LIMITATIONS AND PRECAUTIONS INITIAL / DATE
+
5.1 Ensure that sealwater. injection flow and component cooling water i
flow to the RCP's are maintained throughout this test.
/
i 5.2 Limit RCS cooldown equal to or less than 50*F for the 3 0 minute duration of the test.
/
e 6
1 i
i 1
t i
e i
l
' O
)
u POT-11 PAGE 6 REVISION 1
(~)S DATE 5/6/82 6.0 TEST METHOD INITIAL / DATE 6.1 Place the Supplemental Instrument Air Compressor in service, supplying the Instrument Ai! System, per SOP-22 0.
/
6.2 Start Diesel Gener,ator B per SOP-306.
/
6.3 Load Diesel Generator B, per SOP-3 06, to carry the load on bus 1DB.
/
6.4 When Diesel Generator B operating parameters stabilize, open bus 1DB normal and alternate feeder breakers.
/
6.5 Push the emergency start pushb utton for Diesel Generator B.
/
6.6 Ensure buses 1A, 1 B and 1C are being fed by their normal feeder breakers per SOP-302.
/
6.7 Ensure the transfer switches for buses 1A, 18 and 1C are in manual.
/
6.8 Notify the System Dispatcher of the impending load transient.
/
6.9 Record the "BEFORE" data on Attachment I.
/
6.10 Announce the impending transient over the plant page.
/
GV l
t
4 POT-11 PAGE 7
'N REVISION 1 DATE 5/6/82 n.
t 6.0 TEST METHOD INITIAL / DATE 6.11 Perform the following actions as close together as possible (within 5 seconds):
6.11.1 Trip the main turb ine.
/
6.11.2 Open the generator output breaker.
/
6.11.3 Open OCB-8902.
/
6.11.4 Cpen bus IDA normal and alternate feeder breakers,
f 6.12 Verify the following :
6.12.1 Reactor trip.
/
'E 6.12.2 Turb ine trip.
/
6.12.3' Reactor Coolant Pumps tripped.
/
6.12.4 Diesel Generator A starts and loads.
/
SIGIV$
j t
(
6.13 Utilize EOP-4 and EOP-13 to stabilize the plant at Hot iHus conditions.
(Some Steps will not be applicable because the B l
Train Load Sequencer was not started and they should be marked N/A).
/
6.14 Secure unnecessary loads on Diesel Generator A
/s 3
as de.d.AsA bg he SM% Syse u t soc.
/
6A311dbtj j
\\
6.15 When the plant has been stabilized at Ho t -Ohu t d wn, note the time and record the "AFTER" data on Attachment I.
(
/
POT-11 PAGE 8 REVISION 1 DATE 5/6/82 6.0 TEST METHOD INITIAL / DATE
' ~
Sh&.br i/
7,/
6.16-Maintain stable Hot Sh" n conditions for 30 minutes.
l 6.17 Record the 'AFTER 30 MINUTES" data on Attachment I.
/
6.18 Restore power to buses TA, 78, ICr~ f DA and 108 per SOP 's 3 02 and 304.
/
?-
9
~
5
~
I l
l l
/ '
e
- e
- e m-e m-ee t
4
f
{,
~
1
~
POT-11~
' PAGE 9
' REVISION 1 O=
Da1e see,e2 3
7.0 DATAREQUIREkENTS INITIAL / DATE, 7.I - The completion of each Step will ~be indicated by initialing and dating in ink in Section 6 and the' attached data sheets.
The
+
signing or initialigg tif a part of procedure signifies that, based i
on peisonal observation or reports from assigned test personnel, the Step has been performed as we,itten and the results are as recorded.
c A.
.7 '.2 The Of ficial Test Copy of the completed test procedure, along with the data collected, will be retained by Document Control as part of the plant historical record.
Y fi s.
.[, '
1
[i
,9 a
s e
[
s m..,,
t 1
l.
i
- 4 g
--J'g.
\\,
%,s N
r
\\
\\
' EWa -
e-L s
s
L 1
I
-POT-11
.t PAGE 10 REVISION 1 A
j. v, DATE 5/6/82 i
8.0 ACCEPTANCE CRITERIA INITIAL / DATE 1
1 i '
LEVEL I j
8.1 The Hot Standby condition is acheived and maintained for at least j
30 minutes, using only emergency on-site power sources.
I
/
1
'I i
i d
4 i
l t
O i
i i
i
{'
I r
i
' O I
i
...., _. -.. -.,. - - -. - -..... -... -. -.. _. -,,.. - _..... -. - -..... - - -. - - - - -. ~. _ - - - _ _ _ _ _ _ _ - - _ _ _ _
t POT-11 ATTACHMENT I DATA SHEET 1 REVISICN 1 PAGE 1 CF 3 i
PLANT PARAMETERS
SUMMARY
SHEET l
I RECORD DATA l
PLANT PARAMETER (Units)
INST. TAG l l
l AFTER l
NO.
I BEFORE l
AFTER I
30 MIN.I l
i l
Pressurizer Pressure -
PR-444 l
l l
l l Control Channel (psig)
Red Pen i
l l
l l
l l
l 1
Pressurizer Level -
LR-459 l
l l
l Control Channel Red Pen l
l l
(%)
l l
l 1
I I
I I
g Turbine First Stage l
PI- %Io l
l l
l Pressure
( ps ig ) 1
+6 l
l l
l l
l l
1 Tavg - Auctioneered TR-408 l
l l
(*F)
Red Pen l
l l
l l
l l
T Loo p " A " (control)
TI-411B l
l l
(%)
MCB l
l l
l l
l T Loop "B" (control)
TI-421B l
l l
(%)
MCB l
l l
l I
i i
l j
T toop "C" (control)
TI-43IB l
l l
l
(%)
MCB l
l l
l
(%)
l l
l l
Nuclear Power Level NR-45 l
l l
l Channel (any PR channel) l l
l l
l l
l l
l Contro'l Bank C Position l
Step l
l l
l l
(steps)
Counter I
l l
l 1
l l
Control Bank D Po s ition Step l
l (steps)
Counter l
l I
i I
l RCS Flow FI-415 l
l l
l Lo J P "A"
(%)
MCB l
l l
l l
l RCS Flow FI-425 l
l Loco "B"
(%) l MCB l
l l
l l
l l
i l
l RCS Flow l FI-435 l
l l
l Loc o "C"
(%) i MCB i
l l
l i
l I
I I
l TI..E Clock l
l l
l l
I l
1 l
O 1
POT-11 ATTACHMENT I DATA SHEET 1 REVISION 1 O
PAGE 2 OF 3 PLANT PARAMETERS
SUMMARY
SHEET I
RECORD DATA I
PLANT PARAMETER (Units)
INST. TAG 1
l AFTER I
NO.
BEFORE AFTER l
30 MIN.l I
I Main Steam Hdr. Pressure PI-464C l
l l
l (ps ig )
l l
FW Pump Duscharge Hdr.
PI-508 l
l l
Pressure (psig) l l
FW Pump A Speed (rpm)
SI-3347 l
l l
1 I
l I
i FW Pump B Speed (rpm)
SI-334R l
l l
1 I
I I
I I
I FW Pump C Speed (rpm)
SI-3349 l
l l
l l
l l
l l
l l
Steam Pressure l PR-475 l
l l
l S/G A (psig)!
Red Pen l
l l
l 0
i i
i i
Steam Pressure PR-475 Q
l l
l S/G B
( ps ig )'
Green Pen l
l l
l l
Steam Pressure PR-475 I
l l
l S/G C (psig)
Blue Pen l
l l
l l
l I
I Generator Load i Turbine l
l l
l (Gross MWe) Panel l
l l
l l
1 Reactor Status MCB l
l l
l l
l I
l l
l l
Reactor Coolant Pump "A" MCB l
l l
Status i
l l
l I
l l
l l
Reactor Coolant Pump "B MCB l
l l
Status l
l 1
I I
Reactor Coolant Pump "C" MCB l
l Status l
l -
1 I
I l Elect.
l l
l l
l Status of Busses Panel l
l l
1A, 1B, and IC (MCB) l l
l l
I I
Time Clock l
l l
i I
I r)i L
yr,.<--r,-,- -. - -,, -
my v-r
I POT-11 ATTACHMENT I O
DATA SHEET 1 REVISION 1 V
PAGE 3 OF 3 PLANT PARAMETERS
SUMMARY
SHEET l
RECORD DATA l
PLANT PARAMETER (Units)
INST. TAG l l
l AFTER l
NO.
l BEFORE AFTER l
3 0 MIN. l 1
1 I
Steam Generator N.R.
LR-478 l
l l
l Level S/G A
(%)
l Red Pen l
I I
I Steam Generator N.R.
LR-488 H
l l
Level S/G B
(%)
l Red Pen l
l l
1 I
I Steam Generator N.R.
, LR-498 h
l l
l Level S/G C
(%)
l Red Pen l
l l
l l
1 1
I I
Auxiliary FW Pumps MCB l
l l
l
- Status l
l l
l I
I Feedwater Flow, S/G A
, FR-478 l
l l
l Channel (MPPH).
Red Pen l
l l
l l
Steam Flow, S/G A FR-478 l
l l
0, Channel (MPPH)
Green Pen l
l l
I i*
i Feedwater Flow,. S/G B FR-488 l
l l
Channel (MPPH)l Red Pen l
l l
l Steam Flow, S/G B FR-488 1
l l
Channel (MPPH)
Green Pen l
l i
Feedwater Flow, S/G C FR-498 l
l l
l Channel (MPPH)
Red Pen l
l l
l Steam Flow, S/G C 1 FR-498 l
l l
l Channel (MPPH)'
Green Penl l
l Elect.
l t
Status of Diesel Panel L
I Generator A MCB l
Elect.
I Status of Diesel Panel l
Generator B MCB L
l 1
I l
Time Clock l
l l
l l
l l
- Auliliary Feedwater Flow in GPM.
O
-