Procedure P0T-11,Revision 1, Power Operation Testing, Station Electrical Blackout
ML20058G287
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/20/1982
From:
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20058G191 List:
References
P0T-11, PT-11, NUDOCS 8208030257
Download: ML20058G287 (16)


Text

.

q..,

.)

SOUTH CAROLINA ELECTRIC AND GAS COMPANY VIRGIL C.

SUMMER NUCLEAR STATION NUCLEAR OPERATIONS POWER OPERATION TESTING STATION ELECTRICAL BLACKOUT POT-11

^""

/^'I LNJC,b b_EA b 0? ERA" ONL>s REVISION 1 g

' ' ~ ~ ~ '

MAY 6, 1982

. COPY No....C"d"0.iQ.M.

b d I. b, SAFETY RELATED (X)

Reviewed by:

j C

0 f2-ORIGINATOR (of this r6 vision)

/ Dhte i

1dhdaC5 s/nkt QUtTLIFIED REVIEWER Date Approved:

3 y

I.5, fS TECHNIbAL SUPERVISOR,//

'Date Date Issued. MAY 2 01%2 Form AP-101-2, (1/80) 8208030257 820729 PDR ADOCK 05000395 A

PDR

t t

POT-11 PAGE i REVISION 1 O

5/6/82 LIST OF EFFECTIVE PAGES PAGE REVISION i

1 11 1

1 1

2 1

3 1

4 1

5 1

6 1

7 1

O 8

i 9

1 10 1

ATTACHMENTS ATTACHMENT I 1

O

S POT-11 PAGE il 1

REVISION 1 n,

5/6/82

~

s INDEX 1.0 PURPOSE

2.0 REFERENCES

3.0 PREREQUISITES 4.0 SPECIAL TEST EQUIPMENT 5.0 LIMITS AND PRECAUTIONS 6.0 TEST METHOD 7.0 DATA REQUIREMENTS 8.0 ACCEPTANCE CRITERIA ATTACHMENTS ATTACHMENT I - DATA SHEET 1 - PLANT PARAMETERS

SUMMARY

SHEET 3

t l

l l

O

,--.,n..

____m--

j i

POT-11 PAGE 1 REVISION 1 DATE 5/6/82 3

2 i

i 1.0 PURPOSE l

1.1 To demonstrate that the necessary equipment, controls, and indications are available, following the isolation of the l

of f site power distribution system, to remove decay heat frcm the core using only emergency power supplies, l

+

1 l

i l

' O I

N J

t

.i j

' O

~

i i

i

~. -.

~

POT-11 PAGE 2 REVISION 1 O'

DATE 5/6/82 2.0 REFERENCES 2.1 V.C.

Summer FSAR, Table 14.1-78.

2.2 V.C.

Summer FSAR, Section 8.3.

2.3 AP-170G Power Ascension Test Program.

]

l l

0

POT-11 PAGE 3

)

gS REVISION 1

()

DATE 5/6/82

-3.0 PREREQUISITES INITIAL / DATE 3.1 The plant is operating steady-state at greater than or equal to 10% generator output (P-7 energized)

/

3.2 Operation of OCB8902 has been cleared through the dispatcher and a switching order, form OD54SCE, has been filled in for both opening and closing the breaker.

/

3.3 The normal at-power electrical distribution lineup exists.

Both Diesel Generators are operable.

/

1 1,

~

O 8

e d

3 l

i o

O

9 0

POT-11 PAGE 4 arvtston i O

DATE 5/6/82 4.0 SPECIAL TEST EQUIPMENT INITIAL / DATE NONE O

l l

l b

O

i POT-11 l

PAGE 5 REVISION 1 DATE 5/6/82 5.0 LIMITATIONS AND PRECAUTIONS INITIAL / DATE

+

5.1 Ensure that sealwater. injection flow and component cooling water i

flow to the RCP's are maintained throughout this test.

/

i 5.2 Limit RCS cooldown equal to or less than 50*F for the 3 0 minute duration of the test.

/

e 6

1 i

i 1

t i

e i

l

' O

)

u POT-11 PAGE 6 REVISION 1

(~)S DATE 5/6/82 6.0 TEST METHOD INITIAL / DATE 6.1 Place the Supplemental Instrument Air Compressor in service, supplying the Instrument Ai! System, per SOP-22 0.

/

6.2 Start Diesel Gener,ator B per SOP-306.

/

6.3 Load Diesel Generator B, per SOP-3 06, to carry the load on bus 1DB.

/

6.4 When Diesel Generator B operating parameters stabilize, open bus 1DB normal and alternate feeder breakers.

/

6.5 Push the emergency start pushb utton for Diesel Generator B.

/

6.6 Ensure buses 1A, 1 B and 1C are being fed by their normal feeder breakers per SOP-302.

/

6.7 Ensure the transfer switches for buses 1A, 18 and 1C are in manual.

/

6.8 Notify the System Dispatcher of the impending load transient.

/

6.9 Record the "BEFORE" data on Attachment I.

/

6.10 Announce the impending transient over the plant page.

/

GV l

t

4 POT-11 PAGE 7

'N REVISION 1 DATE 5/6/82 n.

t 6.0 TEST METHOD INITIAL / DATE 6.11 Perform the following actions as close together as possible (within 5 seconds):

6.11.1 Trip the main turb ine.

/

6.11.2 Open the generator output breaker.

/

6.11.3 Open OCB-8902.

/

6.11.4 Cpen bus IDA normal and alternate feeder breakers,

f 6.12 Verify the following :

6.12.1 Reactor trip.

/

'E 6.12.2 Turb ine trip.

/

6.12.3' Reactor Coolant Pumps tripped.

/

6.12.4 Diesel Generator A starts and loads.

/

SIGIV$

j t

(

6.13 Utilize EOP-4 and EOP-13 to stabilize the plant at Hot iHus conditions.

(Some Steps will not be applicable because the B l

Train Load Sequencer was not started and they should be marked N/A).

/

6.14 Secure unnecessary loads on Diesel Generator A

/s 3

as de.d.AsA bg he SM% Syse u t soc.

/

6A311dbtj j

\\

6.15 When the plant has been stabilized at Ho t -Ohu t d wn, note the time and record the "AFTER" data on Attachment I.

(

/

POT-11 PAGE 8 REVISION 1 DATE 5/6/82 6.0 TEST METHOD INITIAL / DATE

' ~

Sh&.br i/

7,/

6.16-Maintain stable Hot Sh" n conditions for 30 minutes.

l 6.17 Record the 'AFTER 30 MINUTES" data on Attachment I.

/

6.18 Restore power to buses TA, 78, ICr~ f DA and 108 per SOP 's 3 02 and 304.

/

?-

9

~

5

~

I l

l l

/ '

e

    • e
  • e m-e m-ee t

4

f

{,

~

1

~

POT-11~

' PAGE 9

' REVISION 1 O=

Da1e see,e2 3

7.0 DATAREQUIREkENTS INITIAL / DATE, 7.I - The completion of each Step will ~be indicated by initialing and dating in ink in Section 6 and the' attached data sheets.

The

+

signing or initialigg tif a part of procedure signifies that, based i

on peisonal observation or reports from assigned test personnel, the Step has been performed as we,itten and the results are as recorded.

c A.

.7 '.2 The Of ficial Test Copy of the completed test procedure, along with the data collected, will be retained by Document Control as part of the plant historical record.

Y fi s.

.[, '

1

[i

,9 a

s e

[

s m..,,

t 1

l.

i

  • 4 g

--J'g.

\\,

%,s N

r

\\

\\

' EWa -

e-L s

s

L 1

I

-POT-11

.t PAGE 10 REVISION 1 A

j. v, DATE 5/6/82 i

8.0 ACCEPTANCE CRITERIA INITIAL / DATE 1

1 i '

LEVEL I j

8.1 The Hot Standby condition is acheived and maintained for at least j

30 minutes, using only emergency on-site power sources.

I

/

1

'I i

i d

4 i

l t

O i

i i

i

{'

I r

i

' O I

i

...., _. -.. -.,. - - -. - -..... -... -. -.. _. -,,.. - _..... -. - -..... - - -. - - - - -. ~. _ - - - _ _ _ _ _ _ _ - - _ _ _ _

t POT-11 ATTACHMENT I DATA SHEET 1 REVISICN 1 PAGE 1 CF 3 i

PLANT PARAMETERS

SUMMARY

SHEET l

I RECORD DATA l

PLANT PARAMETER (Units)

INST. TAG l l

l AFTER l

NO.

I BEFORE l

AFTER I

30 MIN.I l

i l

Pressurizer Pressure -

PR-444 l

l l

l l Control Channel (psig)

Red Pen i

l l

l l

l l

l 1

Pressurizer Level -

LR-459 l

l l

l Control Channel Red Pen l

l l

(%)

l l

l 1

I I

I I

g Turbine First Stage l

PI- %Io l

l l

l Pressure

( ps ig ) 1

+6 l

l l

l l

l l

1 Tavg - Auctioneered TR-408 l

l l

(*F)

Red Pen l

l l

l l

l l

T Loo p " A " (control)

TI-411B l

l l

(%)

MCB l

l l

l l

l T Loop "B" (control)

TI-421B l

l l

(%)

MCB l

l l

l I

i i

l j

T toop "C" (control)

TI-43IB l

l l

l

(%)

MCB l

l l

l

(%)

l l

l l

Nuclear Power Level NR-45 l

l l

l Channel (any PR channel) l l

l l

l l

l l

l Contro'l Bank C Position l

Step l

l l

l l

(steps)

Counter I

l l

l 1

l l

Control Bank D Po s ition Step l

l (steps)

Counter l

l I

i I

l RCS Flow FI-415 l

l l

l Lo J P "A"

(%)

MCB l

l l

l l

l RCS Flow FI-425 l

l Loco "B"

(%) l MCB l

l l

l l

l l

i l

l RCS Flow l FI-435 l

l l

l Loc o "C"

(%) i MCB i

l l

l i

l I

I I

l TI..E Clock l

l l

l l

I l

1 l

O 1

POT-11 ATTACHMENT I DATA SHEET 1 REVISION 1 O

PAGE 2 OF 3 PLANT PARAMETERS

SUMMARY

SHEET I

RECORD DATA I

PLANT PARAMETER (Units)

INST. TAG 1

l AFTER I

NO.

BEFORE AFTER l

30 MIN.l I

I Main Steam Hdr. Pressure PI-464C l

l l

l (ps ig )

l l

FW Pump Duscharge Hdr.

PI-508 l

l l

Pressure (psig) l l

FW Pump A Speed (rpm)

SI-3347 l

l l

1 I

l I

i FW Pump B Speed (rpm)

SI-334R l

l l

1 I

I I

I I

I FW Pump C Speed (rpm)

SI-3349 l

l l

l l

l l

l l

l l

Steam Pressure l PR-475 l

l l

l S/G A (psig)!

Red Pen l

l l

l 0

i i

i i

Steam Pressure PR-475 Q

l l

l S/G B

( ps ig )'

Green Pen l

l l

l l

Steam Pressure PR-475 I

l l

l S/G C (psig)

Blue Pen l

l l

l l

l I

I Generator Load i Turbine l

l l

l (Gross MWe) Panel l

l l

l l

1 Reactor Status MCB l

l l

l l

l I

l l

l l

Reactor Coolant Pump "A" MCB l

l l

Status i

l l

l I

l l

l l

Reactor Coolant Pump "B MCB l

l l

Status l

l 1

I I

Reactor Coolant Pump "C" MCB l

l Status l

l -

1 I

I l Elect.

l l

l l

l Status of Busses Panel l

l l

1A, 1B, and IC (MCB) l l

l l

I I

Time Clock l

l l

i I

I r)i L

yr,.<--r,-,- -. - -,, -

my v-r

I POT-11 ATTACHMENT I O

DATA SHEET 1 REVISION 1 V

PAGE 3 OF 3 PLANT PARAMETERS

SUMMARY

SHEET l

RECORD DATA l

PLANT PARAMETER (Units)

INST. TAG l l

l AFTER l

NO.

l BEFORE AFTER l

3 0 MIN. l 1

1 I

Steam Generator N.R.

LR-478 l

l l

l Level S/G A

(%)

l Red Pen l

I I

I Steam Generator N.R.

LR-488 H

l l

Level S/G B

(%)

l Red Pen l

l l

1 I

I Steam Generator N.R.

, LR-498 h

l l

l Level S/G C

(%)

l Red Pen l

l l

l l

1 1

I I

Auxiliary FW Pumps MCB l

l l

l

- Status l

l l

l I

I Feedwater Flow, S/G A

, FR-478 l

l l

l Channel (MPPH).

Red Pen l

l l

l l

Steam Flow, S/G A FR-478 l

l l

0, Channel (MPPH)

Green Pen l

l l

I i*

i Feedwater Flow,. S/G B FR-488 l

l l

Channel (MPPH)l Red Pen l

l l

l Steam Flow, S/G B FR-488 1

l l

Channel (MPPH)

Green Pen l

l i

Feedwater Flow, S/G C FR-498 l

l l

l Channel (MPPH)

Red Pen l

l l

l Steam Flow, S/G C 1 FR-498 l

l l

l Channel (MPPH)'

Green Penl l

l Elect.

l t

Status of Diesel Panel L

I Generator A MCB l

Elect.

I Status of Diesel Panel l

Generator B MCB L

l 1

I l

Time Clock l

l l

l l

l l

- Auliliary Feedwater Flow in GPM.

O

-