ML20058G276

From kanterella
Jump to navigation Jump to search
Procedure ZPT-9.2,Revision 0, Zero Power Testing,Core Cooling W/Simulated Loss of Onsite & Offsite AC Power
ML20058G276
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/01/1982
From:
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20058G191 List:
References
ZPT-9.2, NUDOCS 8208030251
Download: ML20058G276 (17)


Text

~

SOUTH CAROLINA ELECTRIC AND GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION NUCLEAR OPERATIONS,.

f,

~

,fy(?;r,9.,.'

'd ZERO POWER TESTING CORE COOLING WITH A SIMULATED LOSS OF ONSITE AND OFFSITE AC POWER ZPT-9.2 REVISION 0 JUNE 6, 1982 x

SAFETY RELATED (X)

Reviewed by:

/ [p

\\ z

~~ ORIGINATOR (of th sidW)-

/ Date o

m fk,,/,o b 7 l'f s

l QUALIFIED REVIEWER Date Approved:

l l.

'I r

j

  • %Q L I'-

/4 1-Q

. I 7 /:, '

TECHNICAL SUPPORT SUPERVISOR Date Date Issued: JUL 1 E

eorm AP-101-2, (1/80)

REVIETNED BY PSRC s

b.3: I"f _ __ $f)'

[E8"AB8ER'olS85Ni l

.=... _,

_ = _ _ _ - -.

A 1

4 ZPT-9.2

)

PAGE i REV. NO. 0 O-6/6/82 l

LIST OF EFFECTIVE PAGES i

REVISION PAGE i

0 11 0

1 0

2 0

3 0

4 0

5 0

6 0

7 0

0 8

9 0

10 0

11 0

12 0

4 I

ATTACHMENTS O

ATTACHMENT I i

I 1

'l l

l i

O

~

ZPT-9.2 PAGE 11 RSV. NO. O DATE 6/6/82 INDEX 1.0 PURPOSE

2.0 REFERENCES

3.0 PREREQUISITES 4.0 SPECIAL TEST EQUIPMENT 5.0 LIMITS AND PRECAUTIONS 6.0 TEST METHOD 7.0 DATA REQUIREMENTS 8.0 ACCEPTANCE CRITERIA ATTACHMENTS PROCESS COMPUTER TREND BLOCKS A AND B ATTACHMENT I O

l l

ZPT-9.2 PAGE 1 REV. NO. 0 DATE 6/6/82 O

1.0 PURPOSE 1.1 7b demonstrate plant performance capabilities in removing decay heat utilizing manual control of the Turbine DriYen' Emergency Feedwater Pump and simulated loss of all onsite and offsite AC power.

lO O

ZPT-9.2 PAGE 2 REV. NO. 0 DATE 6/6/82 O

1 2.0 REFER'ENCES 2.1 V. C. Summer Nuclear Station FSAR, Chapter 14, Table 14.1-65.

2.2 Precautions, Limitations, and Setpoints Document for Westinghouse NSSS.

2.3 SAP-420, Power Ascension Test Program,

~

t O

I O

l

ZPT-9.2 PAGE 3 REV. NO. O DATE 6/6/82 3.0 PREREQUISITES INITIAL / DATE 3.1 Tave is approximately 557'F.

The Steam Dump is operating (or available) to maintain Tave in the Steam Pressure Mode.

/

3.2 Pressurizer pressure is being maihtained at approximately 2235 psig a

by automatic operation of the Pressurizer Pressure Control System.

/

3.3 Pressurizer level is being maintained at approximately 25% by automatic operation of the Pressurizer Level Control System.

l =-

3.4 The S/Gs are being maintained at approximately 24%.

The Main

'S Feedwater or EFW System is operating (or available) to maintain S/G levels.

/

3.5 All three RCP 's are running.

/

3.6 The CVCS is in a normal at-power lineup.

/

3.7 Excess Letdown is available for operation.

/

3.8 The reactor is shutdown with all rods inserted.

There is l

sufficient shutdown margin for a 100% cooldown.

/

3.9 The Computer Trend Printer is set up to monitor at one minute intervals the parameters specified in Attachment I of this procedure.

/

3.10 S/G Chemistry is in a condition such that blowdown may be isolated for the duration of this test.

/

1

ZPT-9.2 PAGE 4 REV. NO. O DATE 6/6/82 O

INITIAL / DATE 3.11 Communications have been established between the Control Room, the Emergency Feedwater valve gallery mezzanine, I.B. 424 ' and the TDEFP op'rator.

e

/

3.12 Direct contact thermocouples have been mounted on the TDEFP pump inboard and outboard bearings and~ the TDEFP turbine inboard and outboard bearings with remote reading to a four pen brush recorder located outside the TDEFP room.

The recorder scale is to be 0* F to 3 00* F.

/

3.13 The Shif t Supervisor / Shift Foreman have been notified of the impending performance of this test.

/

O i

5 O

e4 ZPT-9.2 PAGE 5 REV. NO. O 4

DATE 6/6/82 4.0 SPECIAL TEST EQUIPMENT ~

INITIAL / DATE 4.1 Four direct contact thermocouples.

/

4.2 Gould Model 2400 Brush Recorder or equivalent.

/

i l

-l

O i

f l

l O

l P

--.,,,,,,,..-----,,,--v.

,,n.

.-,,.-n.-----

n.,..n..., -

._,n,.,,_

v-n r,,

--.c.---

--r+-----,-,-

,ce-,

e ZPT-9.2 PAGE 6 REV. NO. 0 DATE 6/6/82

()

5.0 LIMITS AND PRECUATIONS 5.1 During the conduct of this test the Test Supervisor will make determinations relating to the amount of data being recorded (i.e. speed of recorders, collecting of data, etc.).

/

5.2 Avoid rapid or sudden changes in hteam pressure or feedwater flow.

/

5.3 Maintain less than 97 psid pressure between any two steam lines and greater than 675 psig in each Steam Generator.

/

5.4 During the conduct of this test the Shift Supervisor will make determinations relating to the safety of the plant and terminate the test when plant safety or equipment is jepordized.

/

O

ZPT-9.2 PAGE 7 REV. NO. O DATE 6/6/82 6.0 TEST METHOD 6.1 verify that Source Range Channels 31 and 32 are selected on NR-45.

__]

6.2 Place Pressurizer spray valv'es PCV-444C and PCV-444D in MANUAL and close the valves.

/

6.3 Verify RCP seal injection is between 6 and 12 gpm per pump and to tal flow is less than 33 gpm.

/

6.4 Place Pressurizer Level Control in MANUAL and match the charging plus seal injection flows to the letdown and ' seal return flows.

/

()

NOTE:

Pressurizer level will now vary with the RCS heatup/cooldown.

6.5 Tb simulate the loss of onsite and of fsite AC power perform the following:

6.5.1 Turn the two steam dump interlock switches to the OFF RESET position and release.

/

6.5.2 Place the three SD/PWR relief switches to the PWR RLF position.

/

i I

6.5.3 Place the three PWR RELIEF SETPT controls in MANUAL and adjust the setpoints to maintain a steam pressure of approximately 1092 psig.

/

O

~

ZPT-9.2 PAGE 8 REV. NO. O

("

DATE 6/6/82 6.5.4 Place the steam dump CNTRL in MANUAL and reduce the signal output to zero.

/

NOTE:

Control of steam pressure is now via the PORVs.

6.5.5 Place all pressurizer heater groups in OFF.

/

6.5.6 Start the TDEFW pump as per SOP-211.

/

6.5.7 Verify S/G Blowdown is secure.

/

6.5.9 Place the two MDEFP switches in the pull-to-lock position.

6.5.9 At the HVAC panel stop XFN-83 A-VL and XFN-83 B-VL by placing switches EFP CLG FAN A and EFP CLG FAN B to OFF.

/

6.5.10 Monitor the Turbine Driven Emergency Feedwater Pump for increasing temperature and vibration throughout the duration of this test with no HVAC available.

/

6.5.11 Place the TDEFP to S/G A, B, C switches in MANUAL and fully open TDEFP to S/G A, B,

C controllers IFV-3536, IFV-3546, IFV-3556.

/

l O

ZPT-9.2 PAGE 9 REV. NO. O O

DATE 6/6/82 i

6.5.12 Using the FCV-3536, FCV-3546 and FCV-3556 handwheels throttle emergency feed flow go maintain generator levels first on orders from the Control Room and secondly by monitoring local wide range steam generator level indicators ILT-477A, ILT-487A and ILT-497A.

/

6.5.13 Continue to control steam pressure with the steam line PORVs from the Control Room.

/

6.6 When directed by the Test Supervisor (af ter approximately 30 minutes of steady state conditions), perform the following:

6.6.1

'At the HVAC panel start XFN-83 A-VL and XFN-83 B-VL by placing switches EFP ClG FAN A and EFP CLG FAN B to AUTO.

/

l 6. 6.2 Throttle TDEFP to S/G A, B, C controllers IFV-3536, l

IFV-3546 and IFV-3556 until the controllers override the I

handwheel limits.

l

/

6.6.3 Turn FCV-3536, FCV-3546 and FCV-3556 handwheels to the full open position.

/

i 6.6.4 Per SOP-211 start the Motor Driven Emergency Feedwater Pumps and shut down the Turbine Driven Emergency Feedwater Pump.

/

6.6.5 Place all pressurizer heater groups in AUTOMATIC.

/

/

6.6.6 Establish S/G Blowdown.

6.6.7 Place the Steam. Dump CNTRL to AUTO and adjust the setpoint to maintain a steam pressure of 1092 psig.

O

~

ZPT-9.2 PAGE 10 REV. NO. O DATE 6/6/82 O.

6.6.8 Place the three SD/PWR Relief Switches to the AUTO pos ition.

/

6.6.9 Place the pressurizer level control in AUTO.

/

6.6.10 Place PZR SPRAY PCV-444C ahd PCV-444D in AUTO.

/

the 6.7 Stop the Computer Trend Blocks of Attachment I and collect data.

/

6.8 Stop the brush recorder monitoring TDEFP temperature and collect the data.

/

O

.9 6

Notify the Shift Supervisor that the test is completed.

8 O

i-ZPT-9.2 PAGE 11 REV. No. 0 f

DATE 6/6/82 l

L 7.0 DATA REQUIREMENTS 7.1 All Computer Trend Blocks are collected and attached.

t

/

i i

p e

G I

P 4

l i

I

'l l

i r

l l

f l

l e

,m

,,,-~,.n__,,,r.no em,,w,,.,,,-.,

e,

,_m


n,,

ZPT-9.2 PAGE 12 REV. NO. O DATE 6/6/82 8.0 ACCEPTANCE CRITERIA LEVEL I NONE LEVEL II 8.1 Core Cobling can be maintained "while maintaining S/G levels with the Turbine Driven Emergency Feedwater Pump (simulated loss of on-site and off-site power).

/

LEVEL III 1

NONE i

O 4

0 O

ZPT-9.2 ATTACHMENT I PAGE 1 of 2 REVISION O

(

PROCESS COMPUTER TREND BLOCK A COLUMN ADDRESS PARAMETER UNITS 1

T0406A RCL A TCOLD

  • F 2

T0426A RCL B TCOLD

  • F 3

T0446A RCL C TCOLD

  • F 4

T0419A RCL A THOT

  • F 5

T0439A RCL B THOT

  • F
  • F 6

T0459A RCL C THOT 7

CONTROL TAVG LOOP B

  • F 8

T0126A CHARGING TEMPERATURE

()

9 T0127A LETDOWN TEMPERATURE 10 N0031A SOURCE RANGE COUNTS CPS 11 N0032A SOURCE RANGE COUNTS CPS 12 F0128A CHARGING FLOW GFM 13 F0134A LETDOWN FLOW GPM 14 LO480A PRESSURIZER LEVEL 15 LO 112 A VCT LEVEL e

O

ZPT-9.2 ATTACHMENT I PAGE 2 of 2 REVISION O

()

PROCESS COMPUTER TREND BLOCK B COLUMN ADDRESS PARAMETER

, UNITS 1

LO400A S/G A LEVEL 2

LO420A S/G B LEVEL 3

LO440A S/G C LEVEL 4

PO400A S/G A PRESS PSIG S

PO420A S/G B PRESS PSIG 6

P0440A S/G C PRESS PSIG 7

PO483A PRESSURIZER PRESS PSIG 8

P0499A RC SYSTEM PRESS PSIG

()

9 P0142A CHARGING PRESS PSIG l

10 U0482 AVG PZR PRESS PSIG 11 UO483 AVG PZR LEVEL 12 U1170 AVG T/C TEMP

  • F l

13 AS REQUIRED HOTTEST T/C (QUADRANT 1)

  • F i

14 AS REQUIRED HOTTEST T/C (QUADRANT 2)

  • F 15 AS REQUIRED HOTTEST T/C (QUADRANT 3)
  • F 16 AS REQUIRED HOTTEST T/C (QUADRANT 4)
  • F O

-