Forwards IE Insp Repts 50-280/82-13 & 50-281/82-13 on 820601-02.No Noncompliance Noted
ML20058G149
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/07/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20058G155 List:
References
NUDOCS 8208030218
Download: ML20058G149 (2)


See also: IR 05000280/1982013

Text

__

_

._.-- _ _- _ _ _ _ _ _ _ . _ _ ._ _

. _ . . . . _ - . - . . - _ _ - . _

. _ _ . _

._

'

'

OFFICIAL RECORD COPY

JUL 0 71982

'

.

L

j

!

'

Virginia Electric and Power Company

2

ATTN: Mr. R. H. Leasburg, Vice President

Nuclear Operations

P. O. Box 26666

j

Richmond, VA 23261

Gentiemen:

,

Subject: Report Nosh 280[8

and 50-281/82-13

This refers to the routine safety inspection conducted by Mr. P. A. Taylor of

,

l

this office on June 1-2, 1982, of activities authorized by NRC Operating License

i

Nos. DPR-32 and GPR-47 for the Surry facility and to the discussion of our

i

findings held with Mr. R. Saunders, Assistant Station Manager, at the conclusion

!

of the inspection.

!

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

.,

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

,

i

)

Within the scope of this inspection, no violations or deviations were disclosed.

t

i

[

'

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

l

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

'

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

I

Should you have any questions concerning this letter, we will be glad to discuss

j

them with you.

'

Sincerely,

!

i

H. C. Dance, Chief

Reactor Project Branch 2

Division of Project and

Resident Programs

Enclosure: (See Page 2)

l

<

i

l

8208030218 820707

PDR ADOCK 05000280

,

G

PDR

l

TEct

-

,

.

-

>

Virginia Electric & Power Company

2

Enclosure:

Inspection Report Ncs. 50-280/82-13

and 50-281/82-13

cc w/ enc 1:

J. H. Ferguson, Executive

Vice President-Power

'

J. L. Wilson, Station Manager

P. G. Godwin, Director, Nuclear Security

bcc w/ encl:

Document Management Branch

Commonwealth of Virginia

RI

RII

RI

)

RII,

$

~d

'f

PTaylor:ej

enkins

Klandis

HCDance

fr/ 7 /82

/////82

q 671 /82

6/

/82

7

q