ML20058G018

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/82-36 on 820616.No Noncompliance Noted
ML20058G018
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 07/19/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20058G020 List:
References
NUDOCS 8208030173
Download: ML20058G018 (2)


See also: IR 05000373/1982036

Text

.

JUL 1 9 $823

Docket No. 50-373

Commonwealth Edison Company

ATIN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. R. B. Landsman

of this office on June 16, 1982, of activities at La Salle County Nuclear

Station, authorized by NRC Construction Permit No. CPPR-99 and to the dis-

cussion of our findings with Mr. Shamblim at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

excmination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you

(or your contractors) believe .to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

~

within ten (10) days from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five _ (25) days from

the date of this letter a written application to this office to withhold

such information.

If your receipt of this letter has been delayed such

that less than seven (7) days are available for your review, please notify

this office promptly so that a new due'date may be established. Consistent

with Section 2.790(b)(1), any such application must be accompanied by an

affidavit executed by the owner of the information which identifies the

document or part sought to be withheld, and which contains a full statement

of the reasons which are the bases for the claim that the information

should be withhold from public disclosure. This section further requires

8208030173 820719

h

"

PDR ADOCK 05000373

G

PDR

'

--

--

.

.

-

_

..

.-.

.

_

.

.

JUL 19 $82,'

i

Commonwealth Edison Company

L

the statement to address with specificity the considerations listed in

i

10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as'possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods

,

noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

In/]mlu.}&tdv

W. S. Little, Chief

Engineering Inspection Branch

Enclosure:

Inspection

Report No. 50-373/82-36(DETP)

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing-

R. Cosaro, Site Construction

,

'

Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. II. llolyoak, Station

Superintendent

.B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Office of

Assistant Attorney General

Dan Bement, FEMA, RV

4

i

l-

.

1

Rg

RII

RI

R

'

.

sT

-

N

h

A

Lapd s - /jp

W

Lit le

ore

its

j

>

7/3/B2

L

i

I

.

-

-.

-

.

_.

.

.