Text
.
to,
~
DISTRIBttTION-(NRC-PDR~h Docket Fi JUL 131982 Local PDR ACRS GMcCorkle, NMSS ORB #1 R/F R
~
fparr Docket Hos:
50-348 h
and 50-364 NSIC IE JGibson TConway Mr. F. L. Clayton, Jr.
Senior Vice President Alabama Power Company P.O. Box 2641 Birmingham, Alabama 35291
Dear Mr. Clayton:
This is to acknowledge receipt of your letter dated April 12, 1982, which transmitted changes to the Joseph M. Farley Nuclear Plant Security Plan Revision 3, and the Joseph M. Farley Nuclear Plant Security Personnel Training and Qualification Plan Revision 2, under the provisions of 10 CFR 50.54(p).
With three exceptions the changes are consistent with the provisions of 10 CFR 50.54(p) and are, therefore, acceptable. Our comments on the 4
exceptions are contained in the enclosure to this letter.
It is requested that you provide your response to these comments within 30 days from receipt of this letter.
Should you have any questions concerning this matter, please contact the reviewer, Dale A. Kers at (301) 427-4010.
Sincerely, Is' Steven A. Varga Chief Operating Reactors Branch No.1 Division of Licensing Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: 'See attached list 8208020059 820713 PDR ADOCK 05000348 F
PDR ornce>
suame >
.....Sgg,,,P,RE,y,1,QUS,,,Q,Q,(1,C,y,R,R.E N CE.,~,,,,,,,,,
,,,,,,,,,,,,,,i om>
NAC FORM 318 (10-80) NRCM 024o OFFICIAL RECORD COPY usa m mi_ m
k aOr a
1 DISTRIBUTION w/ encl:
Docket File J. Gibson 5
^
JW 2 91982 g
N1:
foca Docket Nos: 50-348/364 PDR ACRS G. McCorkle, NMSS~
ORB #1 R/F Mr. F. L. Clayton, Jr.
. Reeves Senior Vice President C Parrish Alabama Power Company P.O. Box 2641
\\
'3 Birmingham, Alabama 35'291
- fConway, SPB
Dear Mr. Clayton:
This is to acknowledge receipt of your letter dat April 14,1982, hich transmitted changes to the Joseph M. Farley Nucl Plant Security Plan Revision 3, and the Joseph M. Fa'eley Nuclear Pip t Security Personnel straining and Qualifications-Plan Re 1sion 2, der the provisions of s 10 CFR 50.54(p).
With three exceptions the changes are co,nsistent with the provisions of -
s 10 CeR 50.54(p) and are acceptable. Opr homments on the exceptions are contained in the enclosure to this 1 tter. \\It is requested that you pro-vide your response to these commen within days from receipt of this letter.
A licensing fee for this revi is being determi d and you will be billed accordingly.
Should you have any ques); ons concerning this matter, please contact the reviewer, Dale A. Kers 't(301)427-4010 Sincerely,
/
Steven A. Yarga. - Chief Operating Reactors Cranch 1
/
1 Division of Licensing Office of Nuclear Reactor Re\\
lation
/
Enclosur,e:
As stated cc:/w/oenclosure:
s See attached list x
,)
ni
+
\\f,,,fSk,kl,,,,,,,
,,,,Qg,q,,y,1.,,q,R,,,,Qgg g,,,,,,, '
h
........ S S.P B.g)3, y,,,,,,,,,,,,,,,
-nc,,
,,J,[Be rh a rd,,,,
,,,,CQ r 1,,s,,h,[,,,,E R,,,,,,,e,,,,,,,,
. g.a.,,,
JG1bson 1
.un-, >
'6 [$....82
,,... 6/...l./.8 2........ 6./1p....2..
~8. 2....
,,M-/,82~
- 0..
6 om, nac ronu ate oo.ea nacu on{ ~
OFFiClAL RECORD COPY usom inwaem
,4 COMMENTS ON THE JOSEPH M. FARLEY SECURITY AND SECURITY PERSONNEL TRAINING AND QUALIFICATION PLANS Security Plan - Revision 3 Section Pege Comment 1.3.1.3 6
Include a more detailed description of those screening measures that are completed for each employee prior to being granted " interim un-escorted access" to the protected area.
The basis upon which " interim unescorted access" to the protected area _is granted, as explained by Mr. Jerry Sims of your staff, would be sufficient to meet ANSI N18.17 for employee screening.
Security Personnel Training and Qualifications Plan - Revision 2 Section Page Comment 1.3 8
10 CFR Part 73, Appendix B specifically states
- that a medical examination must be conducted within the preceeding 30 days of an individual demonstrating physical fitness for the assigned security job duties. The extension, + 15 days, included in this section is contrary to the regulatory requirements.
Please delete.
i 1.5 9
There is no clear commitment as to how frequently the armed security personnel and CAS/SAS operators must successfully pass a medical examination.
This section should be revised to clearly' commit to an annual (once every 12 months) medical examination for these individuals.