ML20058F557
| ML20058F557 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/15/1982 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20058F533 | List: |
| References | |
| TAC-48126, NUDOCS 8207300561 | |
| Download: ML20058F557 (3) | |
Text
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-302 FLORIDA POWER CORPORATION, ET AL NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comission (the Comission) has issued Amendment No. 55 to Facility Operating License No. DPR-72, issued to the Florida Power Corporation, City of Alachua, City of Bushnell, City of Gainesville, City of Kissimee, City of Leesburg, City of New Smyrna Beach and Utilities Comission, City of New Sntyrna Beach, City of Ocala, Orlando utilities Comission and City of Orlando, Sebring Utilities Comission, Seminole Electric Cooperative, Inc., and the City of Tallahassee (the licensees) which revised the Technical Specifications (TSs) for operation for the Crystal River Unit No. 3 Nuclear Generating Plant f the facility) located in Citrus County, Florida.
Portions of the amendment were authorized by telephone on March 3,1982, March 9,1982, April 1,1982 and April 6,1982. The administrative addition to the amendment is effective on the date of issuance.
The amendment (1) revises the respcnse time of the Reactor Coolant l
Pump Power Monitors (RCPPMs), (2) allows operation o'f the facility at a power level no greater than 2300 lWt (90.4% of full power) with the RCPPMs bypassed and (3) administratively adds limiting conditiens for operation and surveillance requirements for the power operated relief valves which had inadvertently been omitted from a previous amendment.
Portions of the amendment were authorized on an expedited basis to allow plant startup and rperation at steady state while problems associated with the RCPPMs 8207300561 820715 are being resolved.
PDR ADOCK 05000302 P
~
. 7590-01 The applications for the amendment comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.
The Conmission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.
Prior public notice of this amendnent was not required since the amendrent does not involve a significant hazards consideration.
The Commission has determined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.
For further details with respect to this action, see (1) the applica-tions for amendment dated March 4, ~1982, and April 1,1982, as supplemented by letters dated March 9,1982, April 6,1982, and April 30,1982, (2) the Commission's letters to Florida Power Corporation dated March 12, 1982, April 2,1982, and April 16, 1982, (3) Amendment No. 55 to License No.
DPR-72, and (4) the Cummission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, NW, Washington, D.C., and at the Crystal River Public Library, 658 N.W. First Avenue, Crystal River, Florida. A copy of items (2), (3) and (.4) may be obtained upon request
, 7590-01 addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention:
Director, Division of Licensing.
Dated at Bethesda, Maryland, this 15th day of July 1982.
FOR THE NUCLEAR REGULATORY COMMISSION
- f fA 6/cu \\
' Ac John'7. Stolz, Chief i Operating Reactors Branch #4 W sion of Licensing e
u
_ _ _. _ _. _ _.. _ _