ML20058F503
| ML20058F503 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 07/16/1982 |
| From: | Miner S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20058F494 | List: |
| References | |
| TAC-48471, NUDOCS 8207300536 | |
| Download: ML20058F503 (2) | |
Text
_ _ _ _ _ _ _ _ - _ _
7590-01 UNITED STATES NUCLEAR REGULATORY COPHISSION DOCKET NO. 50-302 FLORIDA POWER CORPORATION, ET AL NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has issued AmenMent No. 56 to Facility Operating License No. DPR-72, issued to Florida Power Corporation, City of Alachua, City of Bushnell, City of Gainesville, City of Kissimmee, City of Leesburg, City of New Smyi na Beach and Utilities Commission, City of New Smyrna Beach, City of Ocala, Orlando Utilities Commission and City of Orlando, Sebring Utilities Commission, Seminole Electric Cooperative, Inc., and the City of Tallahassee (the licensees) which revised the Technical Specifications (TSs) for operation for the Crystal River Unit No. 3 Nuclear Generating Plant,(the facility) located in Citrus County, Florida. The amendment -is effective as of the date of issuance.
t f
The amendment allows operation of the facility at a power level no greater than 2475 MWt with the Reactor Coolant Pump Power Monitors bypassed provided there are four reactor coolant pumps in operation.
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amenhent. Prior public notice of this amenhent was not required since 8207300536 820716 PDR ADOCK 05000302 P
,e O
7590-01 the amendment does not involve a significant hazards consideration.
The Commission has detennined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.
For further details with respect to this action, see (1) the application for amendment dated May 28, 1982, (2) Amendment No. 56 to License No. DPR-72, and (3) the Commission's related Safety Evaluation.
All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, NW, Washington, D.C., and at the Crystal River Public Library, 668 N.W. First Avenue, Crystal River, Fl orida. A copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, Washington, D.C.
20555, Attention:
Director, Division of Licensing.
Dated at Bethesda, Maryland, this 16th day of July 1982.
FOR THE NUCLEAR REGULATORY COMMISSION d "7 4M Sydney Miner, Acting Chief Operating Reactors Branch #4 Division of Licensing
_