Monthly Operating Rept for Oct 1990 for Cooper Nuclear Station
ML20058F310
Person / Time
Site: Cooper 
Issue date: 10/31/1990
From: Meacham J, Jacqueline Thompson
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CNSS908406, NUDOCS 9011080203
Download: ML20058F310 (5)


Text

_

i

. s.z.

t COOPLR NUCLEAR $T ATaoN Nebraska Public Power District

" " * "6"c"3"J7M;%i,^il^"'"

a-cNSS908406 l

November 1, 1990 Document Control Desk U. S. Nuclear Regulatory Commission r-Washington D.C.

20555

[.

Subject:

. Monthly Operating Status Report for October 1990, Docket No.

t50-298.

. Gentlemen:

L

-Enclosed'for your information and use is the Cooper Nuclear Station Monthly

~

Operating Status Report for-October 1990.

The report includes Operating Status, Average Daily Unit Power Level, Unit Shutt.own Data and a Narrative Stunmary of Operating Experience.

. Should you have'any' comments,.or require additional information regarding this report, please contact me.

Sincerely,

.M.

Meachem Division Manager of

' Nuclear Operations-JMM:JTS:kdg

Enclosures-

.cc:

G. D; Watson w/ enclosures R. D' Martin w/ enclosures i

p

-s l

l

/

9011080203 901031 i

PDR ADOCK 05000298 R

PDC l

,.~.

+

rt L

1 4

i OPERATING DATA REPORT DOCKET NO. __050 0298' UNIT CNS DATE Nov.

2. 1990 OPERATING STATUS TELEPHONE (402) 825-5291 L

(1.'

Unit Name:

COODer Nuclear Station Notes I

2.

Reporting Period:

October 1990

3..

Uoensed Thermal Power (MWt).

2381

. 4.

Nameplate Rating (Gross MWe):

836

5. !

Design Electrical Rating (Not MWe): 778 f.

6.

Maximum Dependable Capacity (Gross MWe): 787 i 7. i Maximum Dependable Capacity (Not MWe):

764

' 8.

If Changes Occur in Capacity Ratings (ttems Number 3 Through 7) Since Last Report, Give Reasons:

o jf g.

Power Level To Which Natricted, if Any (Not MWe):

10. -

. Reasons For Restriction,if Any:

This Month Yr..to Date Cumulative j

11.

' Hours in Reporting Period 7450 7.296.0 143.209.0 112.-

Number of Hours Reactor Was Critical '

447.3 5.489.3 108.137.5 13J Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14,

. Hours Generator On Une 432.6 5.445.3 106.477.0

.i 15.

Unit Reserve Shutdown Hours -

0.0 0.0 0.0 16.1 Gross Thermal Energy Generated (MWH) 965.592.0 12.467.920.0 215.150.980.0 17.

Gross Electrio Energy Generated (MWH) -

323.310.0 4.118.819.0 69.454.692.0 1

.18.

Not Electric Energy Generated (MWH)-

314.867.0 3.993.952A, 67.009.147.0 Igc Unit Service Factor -

58.1-

-74.6 74.4 L

20. -

- Unit Availability Factor 58.1 74.6 74.4

- 211 Unit Capacity Factor (Using MDC Net) 55.3 71.7 61.2 22,

' Unit Caracity Factor (Using DER Net) 54.3 70.4 ~

60.1

~ 23J '

Unit Forced Outage Rate -

41.9 54' 4.8 i

l 24c

, Shutdown Scheduled Over Next 6 Months (Type Date, and Duration of Each):

4 None-1 25,$

If Shut Down At End of Report Period, Estimated Date of Startup:

N/A 26.

Units in Test Status (Prior to Commercial Operation):

Forecast

' Achieved INITLAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I

~

+-

AVERA' E bAILY UNIT - POWER LEVEL DOCKET NO.-

050-0298 UNIT CNS DATE November 2.

1990 TELEPHONE (402) 825-5291 MONTH-October 1990 DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NWe-Net)

(MWe-Net)

'769' 17 446 1

2 771 18 0

.3.

-770 19 0

4 766 20 0

5 771 21 0

I 6

770 22 0

r 7

768 23 0

i

'8 772 24 0

9; 773 25 0

-10:

773 26 0

lli 762-27 0

-12

-731 28 0

~13' 774 29 0

14' 769 30 60

' ~15 -

773 31 328 16 774 INSTRUCTIONS On.this" format, list the average daily unit' power level in MWe-Net for each day..'in the reporting month.

Compute to the nearest whole megawatt.-

~

m.

~

UNITSHUTDOWNS AND POWER REDUCTIONS DOCIET NO.-

0504R298 UNITNAME Cooper NuclearStaussi

~

DATE November 2.1990

~

COMPLETED BY J.E.Thomanor, TELEPHONE (4021825-529

REPORTMONTH October 1990 Method Of Ucensee Cause& Coneceve 5

Duraten

. Shuthng Event ^

System

  • Component Actonto 2

3 No.

Date Tyoe'

- (Hours)

Reason Down Reactor Report Code Code Prevent Reanrence 90-05 10-17-90 F.

312.4

-H 3

YES Maintenance equipment blew across 345 KV rnein transmissionsne, shoreng out une and trippng piant. -

1 4

1 F: Forced 2

Reasort 3 Method-

-4 Ext *1 G - Instruchonsfor S: Scheduled A-Ecypment Failure (Explain) 1 - Manual Preparabon of Data Entry B - Maintenanceor Test 2-ManuelScram Sheets for IJcensae Event C Requeling 3-AutomaticScram Report (LER) fee (NUREG0161)

D-RegulatoryRestriction 4 a Continued E - OperatorTrenng & Ucense Exammahon 5 - Reduced Load 5 Exhibit I-Same Source F - Administrative 6 - Other G-OperabonalError(Explain)

H - Other (Explain) -

-n.n

-,..n.,

,,..J..

~ ~. - ~

w..c

.n

Vil 1

ao L;.io.

t

-lk~

OPERATIONS NARRATIVE

' COOPER NUCLEAR STATION OCTOBER.1990 i

' NORMAL POWER OPERATION WAS EXPERIENCED DURING THE MONTH OF OCTOBER, WITH ONE PLANT SHUT DOWN DUE TO A.

MAINTENANCE-ELEVATOR POWER LINE SHORTING ACROSS THE 34SKV TRANSMISSION LINES.- THE TURBINE TRIPPED OFF LINE WHICH RESULTED IN A SCRAM.-

WHILE CNS WAS DOWN RHR-MOV-M027B VALVE WAS REBUILT. l0N OCTOBER 29, 1990 CNS'WENT i

BACK:0N LINE AND IS EXPECTED TO BE AT FULL POWER ON

. NOVEMBER 5,u1990.