Forwards IE Insp Rept 50-331/82-09 on 820623.No Noncompliance Noted
ML20058E987
Person / Time
Site: Duane Arnold 
Issue date: 07/16/1982
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Arnold D
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20058F001 List:
References
NUDOCS 8207300268
Download: ML20058E987 (2)


See also: IR 05000331/1982009

Text

. .

.

.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

m ok'8

.

.

July 16, 1982

Docket No. 50-331

Iowa Electric Light and Power

Company

A'ITN :

Mr. Duane Arnold

President

IE Towers

P. O. Box 351

Cedar Rapids, IA 52406

Gentlemen:

This refers to the special follow-up inspection conducted by

Mr. J. P. Patterson of this office on June 23, 1982, of the prompt

public notification / warning system for the Duane Arnold Energy Center,

and to the discussion of our findings with Mr. Bobby York, Assistant

Plant Superintendent, and others of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and tha enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

' delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

8207300268 820716

PDR ADOCK 05000331

G

PDR

jg ; gg

.

.

..

.

.

Iowa Electric Light and Power

2

July 16, 1982

Company

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

,

the specified periods noted above, a copy of this letter and the enclosed

'

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

hM

a

C. 3. Saperi llo, Chief

Emergency Preparedness and

Program Support Branch

.

Enclosure:

Inspection Report

No. 50-331/82-09(DEPOS)

cc w/ enc 1:

D. Mineck, Chief Engineer

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

l

l

l

RIII

RIII

RIII

RII

k#a

Patt son /sv

A

o

es

7/9/82

i

,--