l.
.
.
gur 141982
Docket No. 50-409
Dairyland Power Ccoperative
ATTN:
Mr. F. W. Linder
General Manager
2615 East Avenue - South
La Crosse, WI 54601
Gentlemen:
This refers to the routine safety inspection conducted by M. W. Branch of
this office on April 1 through May 31, 1982, of activities at Lacrosse
Boiling Water Reactor authorized by NRC Operating License No. DPR-45 and
to the discussion of our findings with Mr. Shimshak at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you
(or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone
within ten (10) days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the claim
that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the
considerations listed in 10 CFR 2.790(b)(4). The information sought to
be withheld shall be incorporated as far as possible into a separate part
of the affidavit.
If we do not hear from you in this regard within the
8207300263 820714
PDR ADOCK 05000409
0
gg
-
-
. . .
- .
--.
.
.'
.
Dairyland Power Cooperative
2
-
specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
- We will gladly discuss any questions you have concerning this inspection.
,
i
Sincerely,
Original signed by L. A. Reyes (for)
,
J. F..Streeter, Chief
Projects Branch 2
Enclosure:
Inspection Report
,
!
No. 50-409/82-05(DPRP)
cc w/ encl:
,
R. E. Shimshak, Plant
!
Superintendent
i
'
DMB/ Document Control Desk (RIDS)
.
- Resident Inspector, RIII
'l
. John J. Duffy, Chief
.
Boiler Section
)
Stanley York, Chairman
Public Service Commission
+
,
!
i
'
1
.
. .
RIIp
RII
hhV
-
i
Reyes/jp
reeter
'
7/
82-
g
1
-
-.
- . . -
..
.
-
-
,
,