Forwards IE Insp Rept 50-409/82-05 on 820401-0531.No Noncompliance Noted
ML20058E958
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 07/14/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20058E962 List:
References
NUDOCS 8207300263
Download: ML20058E958 (2)


See also: IR 05000409/1982005

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _

l.

.

.

gur 141982

Docket No. 50-409

Dairyland Power Ccoperative

ATTN:

Mr. F. W. Linder

General Manager

2615 East Avenue - South

La Crosse, WI 54601

Gentlemen:

This refers to the routine safety inspection conducted by M. W. Branch of

this office on April 1 through May 31, 1982, of activities at Lacrosse

Boiling Water Reactor authorized by NRC Operating License No. DPR-45 and

to the discussion of our findings with Mr. Shimshak at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you

(or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within ten (10) days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the claim

that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the

considerations listed in 10 CFR 2.790(b)(4). The information sought to

be withheld shall be incorporated as far as possible into a separate part

of the affidavit.

If we do not hear from you in this regard within the

8207300263 820714

PDR ADOCK 05000409

0

PDR

gg

-

-

. . .

- .

--.

.

.'

.

Dairyland Power Cooperative

2

-

specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

- We will gladly discuss any questions you have concerning this inspection.

,

i

Sincerely,

Original signed by L. A. Reyes (for)

,

J. F..Streeter, Chief

Projects Branch 2

Enclosure:

Inspection Report

,

!

No. 50-409/82-05(DPRP)

cc w/ encl:

,

R. E. Shimshak, Plant

!

Superintendent

i

'

DMB/ Document Control Desk (RIDS)

.

- Resident Inspector, RIII

'l

. John J. Duffy, Chief

.

Boiler Section

)

Stanley York, Chairman

Public Service Commission

+

,

!

i

'

1

.

. .

RIIp

RII

hhV

-

i

Reyes/jp

reeter

'

7/

82-

g

1

-

-.

- . . -

..

.

-

-

,

,