CPIP-1 Page 1-1 4-15-82 4

CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE #1 i

CORPORATE RESPONSE MANAGER CALL OUT/ ACTIVATION Purpose The procedure provides the necessary steps to call the members of the Corporate Emergency Response Team and/or their alternates and have them report to the Corporate Emergency Response Center (CERC) or to the affected Station.

Activation The Station Emergency Director has informed the General Office Building Security Supervisor of a Station Alert, Site Emergency or General Emergency.

The Security Supervisor has the Corporate Emergency Response Team call out initiated. Team members upon receiving this call then proceed to call out key members of their group to report to the near-site Emergency Operations Facility or the Corporate Emergency Response Center.

1.0 Immediate Assessment and Corrective Action 1.1 The Corporate Response Manager shall perform the following actions when notified of an alert or emergency condition:

a.

Check the applicable box below b.

Note the time and date c.

Initial the appropriate action. (Only one)

Initials Date Time Classification Alert Site Emergency General Emergency 2.0 Call Out The Station Emergency Director shall instruct General Office Security to call the Corporate Emergency Response Team with the following message:

This is Security Officer / Shift Supervisor General Office Security. An emergency has been declared at (Surry) (North Anna) Power Station.

Please report to your designated place of duty.

For Emergency Use Only The telephone number of General Office Security is,

7 x.

8207300212 820719 PDR ADOCK 05000280 F

PDR

CPIP-1 Page 1-2 4-15-82 2.1 Call Out List (Call principles first)

Corporate Response Manager Time Date Individual Home Phone Business Phone Prin.

J. H. Ferguson Alt.

J. I. Oa tts i

Recovery Manager Prin.

R. H. Leasburg Alt.

W. L. Stewart Public News Center Director Prin.

E. A. Baum Alt.

P. G. Edwards Medical Director Prin.

- W. S. Dingledine Alt.

C. Tatum Admin. Service Manager Prin.

R. L. Baldwin Alt.

C. Edward Kube, Jr.

Scheduling Planning Manager Prin.

R. W. Calder Alt.

G. Wroniewicz Advisory Support Manager Prin.

S. C. Brown Alt.

W. N. Thomas 2nd Alt.

R. A. Miller Tech. Support Manager

. Prin.

F. M. Alligood, Jr.

Alt.

E. R. Smith, Jr.

Design Construction Support Manager Prin.

W. C. Spencer Alt.

J. W. Waddill ALL RICHMOND AREA CODE (804) Unless Otherwise Noted.

2.2 Temporary Assignments 2.2.1 If the principle or alternate cannot be reached for any assigned position on the CERT an alternate for another member of the team may be assigned as the principle for the unfilled position on a temporary basis.

All phone numbers shown as dialed from Richmond

CPIP-2 Page 2-1 4-15-82 CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 2 PUBLIC NEWS CENTER DIRECTOR CALL-OUT/ ACTIVATION Purpose This procedure provides the necessary steps to notify the Corporate Response Coordinator who will notify members of the Public News Center Staff and/or their alternates.

Activation The General Office Building Security has notified the Corporate Emergency Response Team of an Alert, Site Emergency or General Emer-gency. The Public News Center Director or his alternate must report to the Near Site Emergency Operation Facility.

1.0 Immediate Action 1.1 The Public News Center Director shall note the time and date of the call from the General Office Building Security and the level of the Alert or Emergency that has been declared. He will then call Corporate Response Coordinator or his alternate of the call-out, and then proceed to the near-site Emergency Operations Facility.

2.0 Call-out 2.1 The Public News Center Director shall call the Corporate Response Coordinator with the following message:

"This is An emergency has been declared at the (Surry) (North Anna) Power Station. Start to make your calls according to your CERP procedures to provide for staffing of the Public News Center.

Then, proceed immediately to the Corporate Emergency Response Center (C ERC)."

2.2 Call-out ".ist:

Corporate Response Coordinator:

Time Date Individual Home Phone Business Phone Prin.

Everard Munsey Alt.

A. L. Geddy 2nd Alt.

J. Austin s

3.0 Call-out Additional Personnel

~

3.1 The Corporate Response Coordinator shall call the Public News Center Staff with the following message:

"This is An emergency has been declared at the (Surry) (North Anna) Power Station.

In acecrdance with the Public Affairs group emergency communications plan, report immediately to the 20th floor of One James River Plaza and begin preparations to staff the Public News Center.

e

'CPIP-2 Page 2-3 4-15-82 1

CORPORATE EMERGENCY RESPONSE PLAN-f IMPLEMENTING PROCEDURE 2.1 MEDIA COORDINATOR MEDIA CALL-OUT/ ACTIVATION Purpose This procedure provides the necessary steps to notify the media that an alert or emergency has been declared at one of the company's nuclear-power stations.

Activation The Corporate Response Coordinator 'will begin notification of the media after concurrence from the Public News Center,- Director of a statement prepared by the Public News Center Staff. Part of the staff will be assembled at the 20th Floor, One James River Plaza, for preparation of the initial statement and notifications, after which the Public News Center will be put into operation.

1.0 Call-out 1.1 The Public News Center Director will review official press statements and the Corporate Response Coordinator shall call the news media with the statement prepared by the Public News Center Staff. He also will give instructions as to when the Public News Center will be staffed, its telephone number and location.

1.2 Call-out List:

Time Date Telephone Media Associated Press United Press International 9

Non-Media NRC Public Information Atlanta, G A

. p I

]

.4 e

CPIP-3 8,

Page 3-1

/

7; 4-15-82 js m

f' 4

r CORPORATE EMERGENCY RESPONSE PLAN 2.

IMPLEMENTING PROCEDURE 3.0 e

,s ADMINISTRATION / SERVICES MANAGER

  1. % i Purpose This procedure provides the Administration / Services Manager (ASM) with a sequence of events to serve as a guide in orgarizing his team and marshalling the required resources to perform assigned tasks.

Activation This procedure will be activated on the notification of the ASM or.his alternate of a Station Alert, Site Emergency or General Emergency.

1.0 Immediate Function s

1.1 Notification. The ASM shall immediately notify the members the Adminis-trative Services Group (ASG) using the following message:

"This is An emergency has been declared at Surry/ North Anna Power Station.

Report immediately to the CERC on the 5th floor of the General Office i

Building / Emergency Operations Facility at the site.

/

4 Note: It shall be up to the discretion of the ASM as to whether to caWout' s__

alternates as well as principals, whether to call team members' immediately or delay until the situation develops, and whethe: to r

direct EOF team members to report to EOF or CERC to await furthir direction. These decisions shall be based on current disposition.of teTm members and the known and projected situation at the affected site.

1.2 Phone List (Telephone numbers are listed as dialed from OJRP)

Time Date Individual Home Phone.

Susiness Phone l

Administration / Services Manager (CERC):

-l Prin.

R. L. Baldwin

~

Alt.

C. E. Kube f

Office Services Supervisor (CERC):

~

f Prin.

M. L. Carter Alt.

S.Vaughan g

Personnel Services Supervisor (CERC):

Prin.

D. A. Pickett Alt.

C. Hutcherson Communication Advisor (CERC):

(.-

W ',

Prin.

K. G. Higgins r

Alt.

C. F. Nebiett 4

(h I

N y, d e

\\

4q i

. ~.

k, 1.

C PIP-3 Page 3-4 2

i 4-15-82

'y

[

Campsite Caterers (food, trash) 1

[',

USRY, Inc.

's (office trailers) g sl 4\\

{

} Accounting (account numbers)

(

?'

y/

'8' c

i j

P. D. Brooks Co.

., (pot tab'le toilets traffic control i.

s' devices, office f

~f trailers) f

'4i f

r i

9 American Nuclear Insurers l

f

'~

t Af ter liours

. >i sc J

For aftei hours numbers for VEPCO Support Services see the attache'd

[/

VEPCO Emergency Directory.

,j '

r

)

3.0 EOF Function u>

/

WI

. The portion of the group that responds to the site EOF shall establish contact

' immedia,tely with CERC.on all avsitable channels.

4 a

7

/ / Contact information made bkC,EIEC in stecordarice with paragraph 2 above will be 1

i passed to EOF - Site Services Coordin~ajor so that appropriate preparations can be made to receive the services. j

?-?/

c-l p.- -

3.1 A separate phone ~6ir6uit hr_s bpn sterblish6d.for routing CERC-EOF logistics i

infor. nation. This number will be M~

and is located in the cubicle adjacent j.

to the CERC.

/./#~ f i*

/

..A

/

/

y i

\\' _

1,j*

i h

i

.j r

(

e i'/

ll j I

/

ly I

a

'r %.

4 a

I t

P en f A[

. /,,

E

[/

1 ri f. t ',

l

> ~.

j

?)

f 5

e e

~yp' 1 sa o

c, a

?

=

/

l

~*e

  • s o

! q, 1 a

,~ i s

Y 6+ "+ 3

. a..

'k.

~

4, w,

i

\\ :+ },

. -}

,a s

^s

<r.,,,,,

r

,, Y

C PIP-3.1 Page 3-5 4-15-82 CORPORATE EMERGENCY RESPONSE PLAN O

IMPLEMENTING PROCEDURE #3.1 COLLECT CALL NUMBERS

Purpose:

This procedure provides information for setting up the Rumor Control Center and guidelines for handling for four collect call phone lines.

Activation:This procedure will be activated on the notification of the Administration / Services Manager or his alternate of a Station Alert, Site Emergency or General Emergency. The Public News Center will.

publish these numbers.

1.0 Immediate Function 1.1 Report to Administration Services Office.

1.2 Go to designated file and get Rumor Control packet which contains l

Information necessary to set up and run Rumor Control.

j 1.3 Four persons (per shift) should be assigned to Rumor Control Center.

i 1.3.0 These persons should be previously briefed as to the procedures i

and function of the Rumor Control Center.

1.3.1 One of these 4 persons will act as a 'llaison' during operations.

An example of the ' liaison' duties include:

1.3.1.0 Keeping a prompt and current Public News Release in the Rumor Control Center for RCC staff.

1.3.1.1 Investigating relevant questions for RCC staff.

I 1.3.1.2 Keeping the status board updated.

1.3.1.3 Assisting RCC staff.

j 1.3.2 This position may be rotated at intervals with other staff members.

This will allow RCC staff to provide complete coverage of all telephone calls.

t l

lO l

l

~

C PIP-3.2 Page 3-6 4-15-82 4

CORPORATE EMERGENCY RESPONSE PLAN j

IMPLEMENTING PROCEDURES #3.2 IMMEDIATE ACTION ITEMS

Purpose:

This procedure provides a sequence of events to be followed for setting up the Corporate Emergency Response Center with resources 4

to perform assigned tasks.

Activation:

This procedure will be activated by the Administration Services Manager or his alternate upon notification of a Station Alert, Site Emergency or General Emergency.

I 1.0 Immediate Action i

1.1 The following immediate action items should be carried out in the order listed. Location of this item is also noted.

1.1.1 Insure Security Officers are on floor Phone 1.1.2 Turn on lights - flip all switches Cary St. side f,

elevator core i

1.1.3 Retrieve arm bands - put one on, rest on CERC File-2 Admin. Sves. Table.

j 1.1.4 Retrieve badges - give to Security officer CERC File-2

.I 1

1.1.5 Turn on copy machine -Insure toner paper Copy Room supply are adequate 1.1.6 Set up tape player on red phone.

Bob Nicholls desk to CERC A or B 1.1.7 Insure communication channels are open to Red Phone affected site if not call Communications (CERC)

  1. 771-4191 or EOF # N.A. 67-2919 Surry 62-353 f

1.1.8 Insure aperture card reader / printer is opera-Tech.

tional, e.g., toner, paper, etc.

Library i

i 1.1.9 Insure video tape deck on floor.

Get key for 14th floor camera room from Security.

1 1.1.10 Post Functional Communication Diagram.

CERC - 1 1.1.11 Insure head set is plugged in D and F or G CERC File-2 (blue pouch) 1.1.12 Find easels CERC - 3 l

,_,,_y.

w..,,

,y_.-.

+

,s-

CPIP-3.2 Page 3-7 4-15-82

)

1.1.13 Put two status boards on casels CERC - 3 to CERC - H 1.1.14 Post Sign In Sheet and Locator Board in easels

. CERC - 3 to Reception 1.1.15 Verify Admin. Services call out list (CPIP-3),

CERC - 4 has been initiated if not, tell someone to start.

1.1.16 Insure tables and chairs are arranged according CERC to attached diagt am 1.1.17 Put overhead projector on Table J, plug it in CERC - 3 I

and place package of acetate near it.

f 1.1.18 Arrange two sets of signs at the team tables CERC - 1 and work area (See attached diagram and backs f

of team signs).

l 1.1.19 Check emergency lighting CERC-area E i-1.1.20 Place CPIP's at appropriate tables (2 cc each)

CERC - 2 i

1.1.21 Place telephone books on table in CERC (at Iva's office phone E)

(binder bin) 1.1.22 Put out pads of paper, pencils, message CERC File-2 forms, message logs, ash trays - put extras on Admin. Sves. Table.

~.1.23 Put affected station map on easel at K Map in L i

1 or M 1.1.24 North Anna and Surry Location Maps CERC File-2 1.1.25 Retrieve smaller office pot and make coffee, Roger's first smaller pot then larger pot. Place credenza and cups, sugar and cream near coffee pot.

Coffee locker (out-side CERC) 1.1.26 Prepare to translate messages from CERC status boards on a continuing basis for distribution to CERT members and team work areas, a

O O

O

.e CERC SET-UP DIACRAM t

~

'\\

h ]

pite_

c

)..

!: h

'S i

CERC Drawer g

- h-CERC File Cabinet CERC Signs / Status Boards da 4 l

'~

CERC Bookcase J

D l

k CERC Storage Cabinet r.._,

I h

Ta c.n I

J 2 EWE #dL 5tW I

hWd66EM

[ U

./

sc

- yh.

g:-

s

=,., _. _ _ _...

affected plant RED phone and speaker on Response Manager's Table A - Surry EOF Ringdown w/ speaker B - N.A. EOF Ringdown w/ speaker C - System Operator PBX (x393) which do not ring) Jack on back of phone on selected line. y yyn D - 771-3199 (also has 4741, 4442, 1 $ $7 3 E - 649-1476 y *

"8 F - N.A. EOF Jack

  • yyy C - Surry EOF Jack
  • * 'o H

Status Board 1

" Rover" Board J - Table for overhead pro.jector K,- Affected station map L & M - North Anna and Surry maps

CPIP-3.3 Page 3-9 4-15-82 N

i CORPORATE EMERGENCY RESPONSE PLAN DIPLEMENTING PROCEDURE #3.3 MESSAGE HANDLING Purpose This procedure provides each individual in the Emergency Operations Facility and all individuals in each team work area with all information which is received from the station by the Recovery Operations Planning Coordinator during an emergency.

Activation This procedure will be activated upon the notification of a station alert, site emergency or general emergency.

1.0 The message handler shall report to the Office Services Supervisor upon notification of an emergency.

2.0 All message handlers shall be instructed of all duties by the Office Services Supervisor.

3.0 Upon receipt of a message, the Recovery Operations Planning Coordinator will give the message handler the message he takes down on a transparency sheet. This transparency sheet will be taken to the Kodak room when nineteen (19) copies will be made and distributed immediately to the following persons and also to the designated team work areas for each group listed below.

Corporate Response Manager C

Public News Center Liaison Scheduling Planning Manager Technical Support Manager Administrative Services Manager Advisory Support Manager Design Construction Support Manager 3.1 All messages will be logged on the message log sheeets and retained in the CERC File.

l 3.1.1 The Office Services Supervisor shall be responsible for the proper distribution, logging and filing of all messages received.

4.0 All messages shall be logged, copied and distributed immediately.

Copies of all transparencies will be retained in the CERC Files for future reference.

C PIP-4.1 Page 4-1 4-15-82 CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 4.1 SCIIEDULING/ PLANNING MANAGER CALL OUT/ ACTIVATION Purpose This procedure provides the necessary steps to call the member of the Scheduling / Planning Staff and/or their alternates and have them report to the Corporate Emergency Response Center (CERC) or, when required, to the affected station.

1.0 Immediate Assessment 1.1 The Scheduling / Planning Manager shall report to the Corporate Emergency Response Center (CERC) upon notification by the General Office Building Security.

1.2 Before leaving for the CERC, the Scheduling / Planning Manager call the two Planning Coordinators with instructions to report to the CERC for immediate planning duties.

1.3 The Scheduling / Planning Manager shall assess the situation with the Corporate Response Manager and the other members of the Corporate Emergency Response Team (CERT), and determine if any additional personnel are required for planning activities and to what location (CERC or affected station) they sinuld report.

2.0 Call Out 2.1 The Scheduling / Planning Manager shall notify the approp. iate members of the Scheduling / Planning Staff with the following message:

"This is the Scheduling / Planning Manager. An Emergency has been declared at Surry, North Anna Power Station.

Report immediately to the 5th floor of the General Office Building, Surry Power Station, North Anna Power Station."

i 2.2 Call Out List (Call principal first).

Position Time Date Individual Home Phone Business Phone f

Recovery Operations Prin.

J. W. Ogren Planning Coordinator Alt.

Pat Lambert (SPS)

J. L. Downs (NAPS)

Technical Support Prin.

Vernon L. Colbert-Planning Coordinator Alt.

John P.Maciejewsk

~~

a 4

CPIP-6 Page 6-1 4-15-82

-/^

CORPORATE EMERGENCY RESPONSE PLAN

(

IMPLEMENTING PROCEDURE #6 TECliNICAL SUPPORT M ANAGER CALL OUT/ ACTIVATION Puroose This procedure provides the necessary steps to call the members of the Technical Support Staff and/or their alternates and have them report to the Corporate Emergency Response Center (CERC) or, when required, to the affected station.

1.0 Immediate Assessment 1.1 The Technical Support Manager shall report to Corporate Emergency Response Center (CERC) upon notification by the General Office Building Security.

1.2 The Technical Support Manager shall assess situation with the Corporate Emergency Response Team (CERT), and determine which members of the Technical Support staff should be called out and to what location (CERC or to affected station) they should report.

2.0 Call Out 2.1 The Technical Support Manager shall himself or have Staff Support personnel notify the appropriate members of the Technical Support Staff

(.. )

with the following message:

"This is An Emergency has been declared at Surry, North Anna Power Station.

Report immediately to the 5th floor of the (General Office Building),

(Surry Power Station), (North Anna Power Station)."

2.2 Call Out List (Call principal first).

Time Date Individual Home Phone Business Phone Radiological Control and Waste Management Prin.

F.L. Thomasson,Jr.

Alt.

D. S. Wagner Systems Analysis Prin.

J. O. Eastwood Alt.

M. L. Smith Reactor Analysis Prin.

R. M. Berryman Alt.

R. W. Cross, III T,

e

.~

C PIP-6 Page 6-2 4-15-82 I i Instrumentation and Control Prin.

W. L. Thompson 4

Alt.

G. L. Pannell Operations Support Prin.

D. W. Speidell, Jr.

Alt.

F. B. Curling Licensing Prin.

J. E. East Alt.

G. S. Shukla Staff Suoport Prin.

D. W. Lippard Alt.

R. M. Taylor Meterological Coordinator Prin.

F. B. Martin Alt.

R. S. Greer, Jr.

North Anna Power Station

/

i Surry Power Station -

i 2.3 Any given event may not require full staffing in a specific area. The Technical Support Manager shall make this assessment and have individuals called out accordingly.

2.4 If appropriate, the Technical Support Manager may himself or have Staff Support personnel brief members of the Technical Support Staff on the situation during call out (prior to having them report to the CERC or the affected station), and direct them to activitate ' appropriate additional support in their area of responsibility.

9 1

CPIP-7 Page 7-1 4-15-82 m

I CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE #7 DESIGN AND CONSTRUCTION SUPPORT MANAGER CALL OUT/ ACTIVATION Purpose The procedure provides the necessary steps to call the members of the Design and Construction Support Team and/or, their alternates and have them report to the Corporate Emergency Response Center (CERC) or where required to the affected Station.

Activation The Station Emergency Director has informed the General Office Building Security Supervisor of a Station Alert, Site Emergency or General Emergency.

The Security Supervisor has the Corporate Emergency Response Team call out initiated. Team members upon receiving this call then proceed to call out key members of their group to report to the near-site Emergency Operations Facility or the Corporate Emergency Response Center.

1.0 Immediate Assessment and Corrective Action 8

1.1 The Design and Construction Support Manager shall perform the following actions when notified of an alert or emergency condition:

a.

Check the applicable box below

[3j b.

Note the time and date v

c.

Initial the appropriate action (one only)

Initials Date Time Classification Alert Site Emergency General Emergency 2.0 Call Out l

The Design and Construction Support Manager shall call the Design Construction 2

Support Team with the following message:

l l

This is the (Design and C%struction Support Manager) or (Alternate). An Emergency has been declared at Surry, North Anna, Power Station. Report immediately to the CERC on the 5th floor of the General Office Building, OJRP, Richmond, Virginia.

l l

'The Design and Construction Support Manager (DCSM) may elect to start call out of the Design Construction Support Team (DCST) before he reports to the CERC.

The DCSM may also designate a member of the DCST he contacts to continue O

with the responsibility of calling the other DCST members. This will free the (V

DCSM to spend his time in assessing and supporting the events coming into the CERC.

e

~'

4

-~

CPIP-7 Page 7-2 4-15-82 2.1 Call Out List (Call principles first)

Time Date Individual Home Phone Business Phone Design and Cons'truction Suoport Manager Prin.

W. C. Spencer Alt.

J. W. Waddill Power Station Construction Director Prin.

A. L. Parrish, III 1 Alt.

J. L. Perkins Consultant and Equioment Support Director Prin.

M. L. Bowling Alt.

E. G. Lifrage Power Station Engineering Director Prin.

H. J. Fortune, Jr.

Alt.

C. M. Robinson, Jr.,

ALL RICHMOND AREA CbbE (804) Unless Otherwise Noted.

2.2 Temporary Assignments If both the Principle or Alternate cannot be reached for any assigned position on the DCST an alternate for another member of the team may be assigned as the principle for the unfilled position on a temporary basis. This will be done by the Design and Construction Support Manager or his Alternate.

HOME PHONE BUSINESS PHONE F. C. Prince J. C. Harris W. B. Rodill M. G. Deacon J. C. Danylo 2.3 Reporting Locations The DCST principle and alternate shall report to the main CERC room. The remainder of the DCST will report to the designated area outside the main CERC room on the 5th floor.

9

CPIP-3 Page E-1 4-15-82 CORPORATE EMERGENCI RESPONSE PLAN IMPLEMENTING PROCEDURE 8 RECOVERY MANAGER ACTIVITY / CALL OUT Purpose This procedure provides the necessary steps to call personnel who will be manning the Emergency Operations Facility at the affected station.

Activation The Corporate Response Manager has initiated the Corporate 'Emer-gency Response Plan due to a Station Alert, Site Emergency, or General Emergency at an affected station. The Vice President - Nuclear Operations or his alternate, the Manager - Nuclear Operations and Maintenance is designated as Recovery Manager.

1.0 Call Out The Recovery Manager will call the personnel who will report to the Emergency Operaticas Facility at the affected station.

"There has been a (Station Alert / Site Area Emergency / General Emergency) declared at (Surry/ North Anna) Power Station, j

Report. immediately to the affected station's Emergency l

Operations Facility.

The Emergency Operations Facility is i.'

located at the (Surry Training Center / North Anna Visitors Center)."

(

i i

2.0 Phone List i

Time Date Individual Home Phone Business Phone Radiological Assessment Coordinator e

i Prin.

W. W. Cameron l

Alt.

S. P. Sarver A. H. Stafford Operations Support I

Prin.

H. L. Miller I

Alt.

L. A. Johnson I

i Emergency Plan Advisor t

Prin.

J. W. Martin l

l Alt.

E. M. Topping R. E. Beckwith

\\

l l

L

Page1 CPT 04-15-82 O

CORPORATE EMERGENCY PLAN TELEPHONE DIRECTORY CORPOATE EMERGENCY RESPONSE CENTER (CERC)

Location Richmond System Operator's PBX STH FLOOR OJRP OFFICE NUMBERS Office Location R. L. Baldwin Richmond R. H. Leasburg Richmond W. L. Stewart Richmond F. M. Alligood Richmond H. L. Miller Richmond * -

  • (Also rings in CERC)

'~'

METEROLOGICAL OPERATIONS EMERGENCY OPERATIONS FACILITY (EOF)

North Anna Location Louisa County

'y Via Richmond s

s' From OJRP s

Surry Location Surry County (804)

From OJRr -

TECHNICAL SUPPORT CENTER North Anna Location Louisa County Extentions for: Emergency Director Health Physics Operations Technical Services j

Maintenance f

e-Via Richmond

+

Surry

Location, Surry County w.

PUBLIC INFORMATION CENTER North Anna Location Mineral, VA Fire Department

,-e#

9 e

,n,

Page 3 CPT 10-05-81 j

i ANI NUCLEAR INSURANCE Location Connecticut NRC - BETHESD A i

Location l

Maryland NRC - REGION II Location j

Atlanta, Georgia l

NRC IE RESIDENT INSPECTORS l

North Anna M. B. Shymlock Business Home Surry Don Burke Business Home M. J. Davis Business f

Home STONE & WEBSTER Location Boston, Mass.

Gordon Burroughs Business Home s

(North Anna)

W. B. Dodson Business Home (Surry)

A. K. Banerjee Business Home 1

1 i

s i

i r

A l

,+

.c

,v

---n--

-e--,.-m,,

-w

--w,-

v

Page 4 CPT 09-08-81 t

FIELD SERVICE - SOUTHERN AREA Please inform ONE. Westinghouse contact. using this list in the order shown, to ensure early notification to Westinghouse of an emergency occurring at your plant. Please be prepared to discuss as many facts as are, available at the time of the call and identify s cognizant individual in your organization to provide continuing communications and updates to Westinghouse.

Emergency Communication Network Title Name Office Home HHL*

1.

Operating Plant John Miller

^

Service Manager 2.

First Alternate Dave Richards 3.

Second Alternate Bob Meyer 1

4.

Service Response Joe Leblang Manager 5.

First Alternate Frank Noon 6.

Second Alternate John Miller 7.

Emergency Response Hank Ruppel Director 8.

Emergency Response Ron Lehr Deputy Director 9.

Emergency News Mike Mangan i

Communications The Emergency (HHL) telephones are dedicated lines and are NOT equipped with recording and automatic forwarding features.

Note:

Unless indicated otherwise, all telephone numbers are area coE,

/ When an area code other than is shown, it applies to the office, home and HHL numbers.

Page5 CPT 02-03-82 VEPCO TELECOPIER NUMBERS

~

North Anna Admin. Building Warehouse Surry General Office 5th Floor lith Floor 9th Floor u

C&P Telechone Comoany (North Anna Power Station)

Primary Shell R. Lesh Business Home

\\

Alternate J. R. Werner Business g

Home Emergency Center Continental Telephone Company (Surry Power Station Primary Dan Stainback Business Home Alternate Hal Willson Business Home For Pay Telephone Trailers i

Primary John Pullin Business Home i

ist Alternate George Bruner Business Home i

2nd Alternate Zack Lindsy Business Home D

I i

s 6

Page 6 CPT 04-15-82 e

CERP TELEPHONE DIRECTORY Name CPIP Home Office Alligood, F. M. Jr.

1 Arritt, C. E.

3 Austin, J.

2 Baldwin, R. L.

1/3 Baum, E. A.

1/2 Beauchamp, M. S.

3 Beck, R. L.

2 Beckwith, R. E.

8 Berryman, R. M.

6 Bowling, M. L.

7 l

Brown, S. C.

1/5 Calder, R. W.

1 Cameron, W. W.

8 Carmichael, F. C.

2 Carter, M. L.

3 Cartwright, W. R.

1 Cochran, D. F.

2 Colbert, V. L.

4 Cross, R. W.

6 Curling, F. B.

6 i

Danylo, J.C.

7 l

Deacon, M. G.

7 i

DeWandel, E. P.

3 Dingledine, W. S.

1 Downs, J. L.

4 Driscoll, R. F.

2 East, J. E.

6 Eastwood, J. O.

6 Edwards, P. G.

1/2 Ferguson, J. H.

1 Ferguson, P. G.

3 Fortune, H. J., Jr.

7 Geddy, A. L.

2 Greer, R. S., Jr.

6 Grier, A. M.

2 Harrell, E. W.

Harris, J. C.

7 Hedgepeth, D. W.

2 Hendrix, B. H.

3 Higgins, K. G.

3

-~

Hogg, A. L.

2 Hogwood, H. P.

Note:

All numbers shown as they would be dialed from Richmond.

Surry P.S. Extensions can be reached from OJRP with,._ extension.

NAPS Extensions can be reached from OJRP with

/ extension.

__ _ = _ - _

Page 7 4

CPT 04-15-82 4

CERP TELEPl!ONE DIRECTORY (Conti.)

Name CPIP llo m e Office liudgins, D. F.

3 Ilutcherson, C.

3 Johnson, D. L.

2 Johnson, L. A.

8 Johnson, R. T.

2 Kahnhauser, II. F.

8 Kube, C. E. Jr.

1/3 Lambert, P.

4 Leasburg, R. II.

1 LeFevre, K. R.

8 Lifrage, E. G.

7 Lippard, D. W.

6 Maciejewski, J. P.

3 Martin, F. B.

6 Martin, J. W. Jr.

8 Miller, II. L.

8 Miller, R. A.

1 Munsey, E.

2 Nebiett, C. F.

3 Nicholls, R. E.

3 Oatts, J. I.

1 2

Ogren, J. W.

4 Pannell, G. L.

6 Parrish, A. L., III 7

Paxton, G. J.

3 Perkins, J. L.

7 Pickett, D. A.

3 Prince, F. C.

7 i

f Rentz, F. L.

2 i

Robinson, C. M., Jr.

7 Rodill, W. B.

7 Runner, W. R.

3 Sarver, S. P.

8 Shukla, G. S.

6-Silman, L. O.

2 Smith, E. R., Jr.

1/6 Smith, M. L.

6 Smith, R. A.

2 Speidell, D. W., Jr.

6 Spencer, W. C.

1/7 Stafford, A. II.

8 Starkey, P. L.

2 Stewart, W. L.

1/8

_--r,

Pagea CPT 04-15-82 CERP TELEPIIONE DIRECTORY (Conti.)

Name CPIP Home Office Tatum, C.

1 Taylor, R. M.

6 Thomas, W. N.

1/5 Thomasson, F. L., Jr.

6 Thompson, W. L.

7 Tilley, B. G.

3 Topping, E.

8 Tracey, E. T.

3 Vandyke, II.

3 Vaughan, S. M.

3 Waddill, J. W.

1/7 Wagner, D. S.

6 Wilson, J. L.

1 Wroniewicz, G.

1 Young, W. C.

3 m

4 f

__