ML20058C847

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/82-16 & 50-366/82-16 on 820601-04 & 14.No Noncompliance Noted
ML20058C847
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/28/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20058C850 List:
References
NUDOCS 8207260458
Download: ML20058C847 (2)


See also: IR 05000321/1982016

Text

J)! b.o1

'

,

dw #0 %2

~

i.

-

Georgia Power Company

(

ATTN: hr

R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

.

Subject: Report Nos. Sy2-16, 50-366/82-16

This refers to the routine safety inspection conducted by Mr. G. A. Belisle of

this office on June 1-4, 1982, of activities authorized by NRC Operating License

No. DPR-57 and Operating License No. NPF-5 for the Hatch facility and to the

d'scussion of our findings held with Mr. H. C.

Nix, Plant Manager, at the

conclusion of the inspection.

Areas axamined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

,

'Within the scope of this inspection, no violations or deviations were disclosed.

'

We have examined actions you have taken with regard to previously identified

'- ,

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report..

Should you have any que tions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

A= /

l

H. C. Dance, Chief

Reactor Projects Branch 2

i

l

Division of Project and

'

Resident Programs

i

Enclosure (See Page 2)

l

t

!

[N

O

G

I(Of

_ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ . _ _ _ ._____ _

.'

Jutt

Georgia Power Company

2

-

IOM

-

Enclosure:

Inspection Report Nos. 50-321/82-16,

50-366/82-16

cc w/ encl:

J. T. Beckham, Vice President and

General Manager-Nuclear Generation

H. C. Nix, Plant Manager

C. E. Belflower, Site QA Supervisor

bcc w/ encl:

Document Management Branch

State of Georgia

NRC Resident Inspector

Hugh S. Jordan, Executive Secretary

s

,

'

,

hw

GAB isle:es

CMUpright

ARHe t

JFRogge

HCD nce

9

g782

6/ (/82

6/A /82

6/ f/82

6/p/82

2

3J

_

_. . _ _ _ .

_

_

j