ML20058C554

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-305/82-11 on 820617.No Noncompliance Noted
ML20058C554
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/09/1982
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Matthews E
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20058C558 List:
References
NUDOCS 8207260380
Download: ML20058C554 (2)


See also: IR 05000305/1982011

Text

.

_ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ .

W?2

..

.

July 9, 1982

Docket No. 50-305

Wisconsin Public Service

Corporation

ATTN:

Mr. E. R. Mathews

Senior Vice President

Power Supply and

Engineering

Post Office Box 1200

Green Bay, WI 54305

Gentlemen:

This refers to a special followup inspection conducted by Mr. J. P. Patterson

of this office on June 17, 1982, of the prompt public notification / warning

system for the Kewaunee Nuclear Power Plant, and to the discussion of our

findings with Mr. R. W. Lange, Maintenance Superintendent, and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

!

course of this inspection.

}

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

8207260380 820709

PDR ADOCK 05000305

G

PDR

g gg

--

- - _ _ - _ - _ - _ _ _ _ - _ _ - - _ _ _ - - - - _ _ _ - _ _ _ - _ _ _ - _ - - _ _

__

- _ _ - - - _ _ .

-

.

Wisconsin Public Service

2

July 9, 1982

Corporation

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorpor:ated as far as possible into a separate

part of the affidavit.

I f we da not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

Room.

inspection report will be placed in the Public Document

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

V

, .

,

C.

. Pape iello, Chief

Emergency Preparedness and

Program Support Branch

Enclosure:

Inspection Report

No. 50-304/82-11(DEPOS)

cc w/ enc 1:

D. C. Hintz, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Stanley York, Chairman

Public Service Commission

Dan Bement, FEMA, RV

I

RII

RIII

/

RIII

RII

'

/

)

-

'i

.

l

/

fY

P

riello

'

K

Patte on/sv

Axe

n

7g g4

7/7/82

p

'\\

- _ - - - _ _ _ _ _ _ _ _ _ - _ _ _

_

_