Forwards IE Insp Repts 50-259/82-17,50-260/82-17 & 50-296/82-17 on 820524-28.No Noncompliance Noted
ML20058B629
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/28/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20058B631 List:
References
RTR-NUREG-0803, RTR-NUREG-803 NUDOCS 8207260086
Download: ML20058B629 (2)


See also: IR 05000259/1982017

Text

.

_

-

-

__

4.J6 s

-

.

.

JUN 2 8 1982

. Tennessee Valley Authority

ATTN:

Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Report Nosh-259/8hj50-260/82-17 and 50-296/82-17

Subject:

.

This refers to the routine safety inspection conducted by Mr. E. H. Girard of

this office on May 24-28, 1982, of activities authorized by NRC Operating License

Nos. DPR-33, DPR-52, and DPR-68 for the Browns Ferry facility and to the discus-

sion of our findings held with Mr. J. R. Bynum, Assistant Plant Superintendent,

at the conclusion of the inspection at the Browns Ferry site and with

Mr. D. A. Howard, Baseline and Inservice Inspection Group Supervisor at the

conclusion of the inspection at licensee offices in Chattanooga, Tennessee.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

N

F. J. Long, Acting Chief

Reactor Projects Branch 1

Division of Project and

Resident Programs

Enclosure:

See Page 2

8207260086 820628

PDR ADOCK 05000259

_ _

-

I($

G

PDR

~,

.

Tennessee Valley Authority

2

M48 WU2

Enclosure:

Inspection Report Nos. 50-259/82-17,

50-260/82-17 and 50-296/82-17

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. T. Jones, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief Nuclear Safety

Review Staff

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of Tennessee

'

RII

RI

7

RII

RI

CV

(

'

r

M

6p.,og/82

EHGirard:ht

NEconomos

ARH r t

R utcher

FJl

6py/82

6/t}/82

6/p/82

6/P/82

f

I

_