ML20058B423

From kanterella
Jump to navigation Jump to search

Notice of Issuance & Availability of Amend 54 to License DPR-72
ML20058B423
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/14/1982
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20058B416 List:
References
TAC-11945, NUDOCS 8207260009
Download: ML20058B423 (2)


Text

-

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-302 FLORIDA POWER CORPORATION, ET AL NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE I The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 54 to facility Operating License No. DPR-72, issued to the Florida Power Corporation, City of Alachua, City of Bushnell, City of Gainesville, City of Kissimmee, City of Leesburg, City of New Smyrna Beach and Utilities Commission, City of New Smyrna Beach, City of Ocala, Orlando Utilities Commission and City of Orlando, Sebring Utilities Commission, Seminole Electric Cooperative, Inc., and the City of Tallahassee (the licensees) which revised the Technical Specifications (TSs) for operation of the Crystal River Unit No. 3 Nuclear Generating Plant (the facility) located in Citrus County, Florida.

The amendment is effective as of the date of issuance.

This amendment revises the TS requirements for overpower trip setpoints.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations.

The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior l

l 8207260009 820714 DR ADOCK 05000302 PDR

. 7590-01 public notice of this amendnent was.not required since the amendrent does not involve a significant hazards consideration.

The Commission has determined that the issuance of this acendment will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative i

declaration and environmental impact appraisal need not be prepared in connection with issuance of this amendment.

For further details with respect to this action, see (1) the application for amendment dated March 21, 1979, as supplemented November 27, 1979, and February 15, 1980, (2) Amendment No. 54 to License No. DPR-72, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N. W., Washington, D. C. 20555, and at the Crystal River Public Library, 668 N. W. First Avenue, Crystal River, Florida. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Com-mission, Washington, D. C. 20555, Attention: Director, Division of Licensing.

Dated at Bethesda, Maryland, this 14th day of July 1982.

FOR THE NUCLEAR REGULATORY COMMISSION

.m

\\

r

?

a

/

Opdrating Reactors Branc)h #4 Joh 'F. Stolz, Chief.

vision of Licensing

-n w