Proposed TS Pages Providing Addl Clarification on Ultimate Heat Sink Operation
ML20058A940
Person / Time
Site: Hope Creek 
Issue date: 11/10/1993
From:
Public Service Enterprise Group
To:
Shared Package
ML20058A059 List:
References
NUDOCS 9312010322
Download: ML20058A940 (3)


Text

__

-O I

ATTACHMENT 2 LICENSE AMENDMENT APPLICATION, LCR 93-05, NLR-N93169 ULTIMATE HEAT SINK TEMPERATURE CHANGES REVISED TECHNICAL SPECIFICATION PAGE i

FACILITY OPERATING LICENSE NPF-57 i

HOPE CREEK GENERATING STATION DOCKET NO. 50-354 REVISED TECHNICAL SPECIFICATION PAGE WITH PEN AND INK CHANGES The following Technical Specifications for Facility Operating License No. NPF-57 are affected by this RAI:

Technical Specification Paaes I

3.7.1.3 3/4 7-5 9

i

.L I

L 4

Y i

i I

t'

?

'I l

l l

9312010322 931110 PDR ADOCK 05000354 P

PDR i

\\

.a PLANT SYSTEMS ULTIMATE HEAT SINK LIMITING CONDITION FOR OPERATION I

3.7.1.3 The ultimate heat sink (Delaware River) shall be OPERABLE with:

a.

A minimum river water level at or above elevation -13'O Mean j

Sea Level, USGS datum (76'O PSE&G datum), and a

ggj p l

b.

An average river water temperature of less than or equal toPJ0W.j 1

APPLICABILITY:

OPERATIONAL CONDITIONS 1, 2, 3, 4, 5 and *.

ACTION:

e 145ce v kron w%c. bel

(*ge-m p

lWth AfiejegyJ(emgts,4f tad' abpve sp6cjlicapi'on p6t sat'isfiedVl a.

In OPERATIONAL CONDITIONS 1, 2 or 3, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

In OPERATIONAL CONDITIONS 4 or 5, declare the SACS system and the

{

station service water system inoperable and take the ACTION required by Specification 3.7.1.1 and 3.7.1.2.

c.

In Operational Condition *, declare the plant service water system inoperable and take the ACTION required by Specification 3.7.1.2.

The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS

4. 7.1. 3 The ultimate heat sink shall be determined OPERABLE:

a.

By verifying the river water level to be greater than or equal to the minimum limit at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

By verifying river water temperature to be within its limit:

i 1-) at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the river water temperature is less tnan or equal to 85'F.

2) at least once pe when the river water temperature is greater than 85'F.

"When handling irradiated fuel in the secondary containment.

HOPE CREEK 3/4 7-5

)

~__

r l'

t i

i INSERT FOR PAGE 3/4 7-5 With the river water temperature in excess of 88.6*F, but at or below 89.9'F, continued plant operation is permitted for 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided that both loops of SACS /SSWS are verified to be OPERABLE; otherwise, with the requirements of the above specification not satisfied:

f i

l l

t l

i i

i i

l i

w I

I f

I.

t l

l i

i I

l J

i i

  • -'*-r-

, - +. -, -.

,y

.y..__

y,_

_