A

.[

J.

s.

yi.

d CU Nuclear

=="

~

GPU Nuclear Corporation Forked River, New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:

October 16, 1990 i

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Dear Sir Subjects Oyster Creek Nuclear Generating Station Docket No. 50-219 Special Report No. 90-04 Enclosed is Special Report No. 90-04 which is submitted in accordance with Technical Specification 3.12.E.

If there are any questions, please contact Mr. Michael Heller, OC Licensing Engineer at (609)971-4680.

Very truly yours, w

E. E. Fit patrick vice President & Director Oyster Creek EEF/MH/jc 1

Attachment (MH Spectrpt4 5) cci Administrator

$()

U.S. Nuclear Regulatory Commission

<j{

475.Allendale Road

' o.o King of Prussia,..PA 19406

-=o

=

o 10

' 40 Mr. Alex W. Dromerick-wM U.S. Nuclear Regulatory Commission MO Mail Station Pl-137-

~y Washington, DC-20555

,N 0

3-g NRC Resident Inspectors

..,g,

]{g

Oyster Creek Nuclear Generating Station

.: V 4 GPU Nuclear Corporation is a subsidiary of General Pubhc Utihties Corporation

[bb

  • /I

l.

6-.

1~

SPECIAL REPORT 90-04 Report Date:

October 10, 1990 occurrence Date:

September. 21, 1990 Identification of Occurrence:

A non-functional fire barrier door was not repaired within seven (7) days as required by Technical Specification 3.12.E.

Descriotion of Occurrence 1

During a routine weekly surveillance of the fire barrier doors, the door between fire zones TB-FZ-11C and TB-FA-26 was identified as not meeting the acceptance criteria. The door was declared non-functional due to it not being i

able to latch under its own power.

' Analysis of occurrence:

Upon discovery of the non-functional fire barrier door, a work request was submitted to repair the fire barrier door within.seven (7) days.

Due to constraints imposed by increased maintenance activities of a higher priority, it was not possible to accomplish this repair within seven (7) days as specified. Since the required fire watches had been established, the safety significance of this event is minimal.

Corrective Action Upon discovering the non-functional fire barrier door, within one hour a fire watch was. established in accordance with the technical specification.

The-

-degraded fire barrier door was repaired and declared functional on j

October 2, 1990.

i (MH Spectrpt:4 5)