VIHOINIA ELECTHIC AND POWEH COMPANY Hirnwoxo,Vinoix4 unuoi October 15,1990
/-
U. S. Nuclear Regulatory Commission Serial No.
90 628 Attention: Docus Control Desk NL&P/JMJ:jmj Washington, D.s n45 Docket Nos.
50 338 50 339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of September 1990. Also enclosed is the corrected page (revised unit shutdowns and power reductions for Unit 2) to the August 1990 report.
Very truly yours, O
kL\\h, W. L. Stewart Senior Vice President - Nuclear Enclosures cc:
U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. M. S. Lesser NRC Senior Resident inspector North Anna Power Station u..iCiGEs
$ Gd 38AoS88m 888888=e O
R PNU t
i, j
t l
VIRGINIA POWER CONPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT NONTH Scotember YEARt 1990 h
Approved:
gStation Manager i
'}
l OPERA 11NG DATA REPORT t
-[
DOCKtt NO.:
50 338 DATE:
October 4, 90 COMPLETED BY:
T. Phillips PHONE: (703) 894 2537 i
i i
OPERAtlNG STATUS 1.
Uni t W ane s................................ N or t h Anna 1 2.
R epor t i ng Pe r i od t......................... sept ember 1990 3.
L i censed Therne t Power (MWt ).............
2,893 4 Nameplate Rating (Gross MWe):.............
947
- 3. Design Electrical Rating (Net MWe):.......
907 6.
Meninun Dependable capac ty (Gross MWe)t..
959 t
7.
Maatsan Dependable Capacity (Net MWe):....
911 8.
If changes occur in Capacity Ratings (Items No. 3 thru 7) since test report, give reasons:
N/A F
9.
Power levet to which rr'stricted, if any (Net MWe) _ N/A
- 10. Reasons for restrictions, if any N/A l
ihls Month TtD CLmulative
[
- 11. Hours i n R epor t i ng Per i od................................
720.0 6,551.0 107.603.0
- 12. W6mter of Hours Reactor was cr i t icat...
- 4................
720.0 6,539.4 77,781.9
- 13. Reac t or R eserve shutdown Hours...........................
0.0 0.0 6,603.6
- 14. Hour s Gene r a t or 0n L i ne..................................
720.0 6,517.0 75,011.0
- 15. Unit Reserve shutdown Hours..............................
0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH)..................... 2,063,789.8 18,770,261.7 200,661,039.7
- 17. Gross E l ec t r ical E nergy Generat ed (MWH)..................
681,135.0 6,224,101.0 65,930,923.0
- 18. Net E lect rical Energy Generated (MWH)....................
646,610.0 5,917,832.0 62,413,045.0 -
- 19. Unit service factor......................................
100.0%
99.5%
69.7%
- 20. Unit Availability Factor.................................
100.0%
99.5%
69.7%
'21. Unit Capacity Factor (using MDC Net).....................
98.6%
99.0%
64.9%
- 22. Unit capacity Factor (using DER Net).....................
99.0%
99.6%
64.0%
23. F o r c ed Out a ge R a t e.......................................
0.0 0.5%
12.8%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
,,,, 60 day Refueling Outage scheduled 1/4/91-
- 25. If shutdown at end of Report Period, estimated time of startup: _N/A j.
- 26. Units in Test Status (Prior to Cormerelat Operation):
I i
Forecast Achieved l
INITjAL CRITICALITY INITIAL ELECTRICITT l
COMMERCIAL OPERAT10N 1
l i..
i.
I
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-338 Unitt NA-1 Dates
. October 4.
'90 completed by:
T.
Phillies Phonet 1703) 894-2537 I
I NONTNt SeDtember 1990 s
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL (NWe-Net)
LEVEL (MWe-Net) 1 887 16 906 2
905 17 908 3
904 18 908 4
4 905 19 907 5
906 20 907 6
905 21 907 7
905 22 908 8
905 23 908
=9 906 24 890 i
10 905 25 891 11 904 26 888 12 904 27 867 13 14 905 28 866 906 29 863 15 906 30-860 Instructions:
On this. forsaat, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest-whole megawatt.
L
Page 1
of __1 s
UNIT SHUTDOWN AND POWER REDUCTIONS i
Explanation Sheet Docket No.
50-338
)
Report Month Spotember Unit Name NA-1 Yeart 1990 Date October 4.
'90 completed by:
Todd Phillios l
i i
- No entry this month l
l 1
a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-338 UNIT NAME:
NA-1 DATE:
October 4, 1990 REPORT MONTH: September 1990 COMPLETED BY:
T.
Phillips PHONE:
(703) 894-2537 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs)
Shutting Event Ccde Code Action to Down Reactor Report #
Prevent Recurrence
- No entry this month 1: Type 2: Reason 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G-Operational Error 5:
H=Other (explain)
Exhibit H - Same Source
{
I t
NORTH ANNA POWER STATION UNIT NO.
1 l
MONTH:
September i
SUMMARY
..OF. OPERATING..H RIENCE Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Tint Data September 01, 1990 0000 Began month with Unit at 92%, 882MW, in Chemistry hold following 1-PT-34.3, TVTT.
0520 Commenced ramp-up to 100% power.
0623 Unit stabilized at 100%, 955MW.
September 23, 1990 0000 Unit RCS Boron concentration <1 ppm, commenced coastdown for refueling outage.
September 30, 1990 2400 Ended month with unit at 95%, 911MW.
]
p 1.
f
C..
~*
i OPERAllNG DATA REPORT DOCKET NO.
50-339 DATE:
October 4, 90 COMPLETED BY:
T. Phlttips PHONE: (703) 894 2774 OPERATING STATUS
- 1. Un i t N ame s................................ h or t h Ama 2 2.
Reporting Periods........................ 5eptember 1990 3.
Licensed Thermal Power ( Wt).............
2893 4.
Nameplate Rat ing (Gross We).............
947 5.
Design Electrical Rating (Net We).......
907 6.
Maulana Dependable capacity (Gross We):..
957
- 7. ! Maxima Dependable Capacity (Net We)....
909 8.
If changes occur in Capacity Ratings (Iteme No. 3 thru 7) since last report, glve reasons:
N/A 9.
Power level to which restricted, if any (Net W e): _ N/A
- 10. Reasons for restrictions, if any:
N/A This Month Tat D Cunulative
- 11. Hours i n R epor t i ng Per i od................................
720.0' 6,551.0 85,871.0
- 12. Nuder of Hours Reactor was Celticat.....................
0.0 5,570.3 69,692.4
- 13. Reactor Reserve shutdown Hours...........................
0.0 36.9 5,891.8
- 14. Hour a Gener a t or 0n L i ne..................................
0.0 5,570.2 68,822.1
- 15. Unit Reserve shutdown Hours..............................
0.0 0.0 0.0
- 16. Grocs therne t Energy Generated (WH).....................
0.0 15,267,117.4 183,413,464.4
- 17. Gross E l ect r i c al Energy Generat ed (WH)..................
0.0 5,027,524.0 60,033,041.0
- 18. Net E l ect r ical Ener gy Generat ed (WH)....................
0.0 4,769,708.0 57,608,540.0
- 19. Unit Service Factor......................................
0.0%
B5.0%
80.1%
- 20. Unit Availability Factor.................................
0.0%
85.0%
80.1%
- 21. Unit Capacity Factor (using MDC Net).....................
0.0%
79.9%
74.7%'
- 22. Uni t Capac i t y f ac tor (us ing DE R Ne t ).....................
0.0%
80.3%
74.0%
i 23, forced Outage Rate.......................................
0.0%
0.4%
6.5%
- 24. Shutdowns Scheduled Over Next 6,anths (Type, Date, and Duration of Each):
j 75 day Refueling /10 year ISI outage started 8/D /90
- 25. If Shutdown at end of Report Period, estimated time of Startup:
11/5/90
- 26. Units in Test Status (Prior to Connercist Operation):
x Forecast Achieved INITIAL CRlilCAlliY INITIAL ELECTRICITY COMMERCIAL OPERAtl0N l
'g a
r.;,
AVERAGE DAILY UNIT POWER LEVEL Docket No.:
50-339 Unitt NA-2 Date:
October 4.
'1Q l
completed by:
T.
Phillins Phones (703) 894-2537 j
MONTH:
September 1990 DAY AVERAGE DAILY POWEk DAY AVERAGE DAILY LEVEL LEVEL (NWe-Net)
LEVEL (NWe-Met) a 1
0 16 0
2 0
17 0
.i 3
0 18 0
4 0
19 0
5 0
20 0
6 0
21 0
i 7
0 22 0
8 0
23 0
9 0
24 0
10 0
25 0
11 0
26-0 12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
j
)
i Instructions:
On this format, list the average daily' unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest i
whole megawatt.
t k
e
~
v
Page 1
of __1 UNIT 8HUTDOWN AND POWER REDUCTIONd Explanation Sheet Docket No.:
50-339 Report Month Seotember Unit Name:
NA-2 Year 1990 Date:
October 4.
90 Completed by:
Todd Phillins 1
- 90-2 August 21, 1990 Main Generator taken off-line at 0310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br />.
Unit entered mode 3 at 0323 hours0.00374 days <br />0.0897 hours <br />5.340608e-4 weeks <br />1.229015e-4 months <br />.
Unit entered mode 4 at 1933' hours.
August 22, 1990
. Unit entered mode 5 at 1612 hours0.0187 days <br />0.448 hours <br />0.00267 weeks <br />6.13366e-4 months <br /> for 10 year ISI/
Refueling outage.
September 04, 1990 Unit entered mode 6 at 0801 hours0.00927 days <br />0.223 hours <br />0.00132 weeks <br />3.047805e-4 months <br />.
UNIT SHUTDOWNS.AND POWER REDUC 7 IONS DOCKET NO.:
50-339 UNIT NAME:
NA-2 DATE:
Octcber 4, 1990 REPORT MONTH:
September 1990 COMPLETED BY:
T.
Phillips PHONE:
(703) 894-2S37 1
2 3
4 5
No.
Date Type Duration Reason Method of Licensee System Component Cause &, Corrective (hrs)
Shutting Event Code Code Action to Down Reactor Report #
Prevent Recurrence 90-2 900821 S
720.0 C
4 N/A MS RM S/G Maintenance planned i
i 1: Type 2: Reason 3: Method 4:
l Fi= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions l
S:= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee l
D= Regulatory Restriction 4= Continuations Event Report (LER) File l
E= Operator Training & License Examination 5= Load Reduction (NUREG-0161) i l
F= Administrative 9=Other j
G= Operational Error 5:
H=Other (explain)
Exhibit H - Same Source l
r,/
f, NORTH ANNA POWER STATION UNIT NO.
2 MONTH Seoterber
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence is a
summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Date Time Data September 01, 1990 0000 Began month with Unit in mode 5, 0%.
September 04, 1990 1432 Unit entered mode 6 at 0801 hours0.00927 days <br />0.223 hours <br />0.00132 weeks <br />3.047805e-4 months <br />.
September 13, 1990 0322 Core off-load complete, unit defueled.
September 30, 1990 1916 Core on-load started, unit re-entered mode 6.
2400 Ended month with unit in mode 6, 0%.
f d
- y 2+
~
x.
+
~
~
' UNIT SHUTDOWNS AND POWER REDUCTIONS.
DOCKET NO.-
50-339
-UNIT NAME:
NA DATE:-
October.4, 1990 REPORT MONTH: : August 1990 COMPLETED BY:
T. Phillips PHONE:
(703)-894-2537-1 2
3 4
5
~ No.
Date Type Duration Reason Method of Licensee System Component Cause & Corrective-(hrs)
Shutting Event Code Code Action to Down Reactor-Report /
Prevent Recurrence-70-1 900813 F-0.0 F
.5 N/A
~MS RM S/G Maintenance schedulwl-during upcoming outage
' 90-2 900821 F
O.O F
5 N/A MS RM
.S/G Maintenance scheduled.
during upcoming outage-F.
260.8 F
-1 N/A MS RM S/G Maintenance scoeduled during upcoming outage 1: Type
'2: Reason 3: Method 4:
F= Forced.
A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions-S= Scheduled B= Maintenance or Test
-2= Manual Scram' for prepration of Data C= Refueling ~
3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other 5:
G= Operational-Error Exhibit H - Same Source H=Other.(explain)
. =,
- -... _ -..