Forwards IE Inspec Repts 50-329/78-09 & 50-330/78-09 on 780829-31 & Notice of Violation
ML20058A186
Person / Time
Site: Midland
Issue date: 09/21/1978
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20058A189 List:
References
NUDOCS 7811130340
Download: ML20058A186 (2)


See also: IR 05000329/1978009

Text

Ie

I

%,

UNITED STATES

f

4

,

/k.

/'

NUCLEAR R EGU LATOR Y ' COMMISSION

j

,.I W}go,

REGloN ill

  • '

'

g

799 ROOSEVELT ROAD

i

g

ts

GLEN E LLYN, f LLINOls 60137

....*

SEP fi 1W

Docket No. 50-329

Docket No. 50-330

~

Consumers Power Company

ATTN:

Mr. Stephen H. Howell

Vice President

1945 West Parnall Road

Jackson, MI 49201

Gentlemen:

(

This refers to the inspection conducted by Mr. E. W. K. Lee of

this office on August 29-31, 1978, of activities at the Midland

Nuclear Power Plant constuction site authorized by NRC Construction

Permits No. CPPR-81 and No. CPPR-82 and to the discussion of our

findings with Mr. J. L. Corley, others of your staff, and others of the

Midland site staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appeared

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code

of Federal Regulations. Section 2.201 requires you to submit to

this office within thirty days of your receipt of this notice a

written statement or explanation in reply, including for each

item of noncompliance: (1) corrective action taken and the results

achieved; (2) corrective action to be taken to avoid further non-

compliance; and (3) the date when full compliance will be achieved.

1811130 %

Q

,

.

..

.

Consumers Power Company

-2-

ggp g

jg7g

in accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room, except as follows. If

the enclosures contain information that you or your contractors

believe to be proprietary, you must apply in writing to this office,

within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a

full statement of the reasons for which the information is considered

proprietary, ar* should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

e

---AL_m/

an

- - ,

- -- -

R. F. Heishman, Chief

Reactor Construction and

Engineering Support branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-329/78-09 and

No. 50-330/78-09

cc w/encls:

(

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

.

Dr. Wayne E. North

Myron M. Cherry, Chicago

'l

1

l

'

__