OPERATING DATA REPORT DOCKET NO. 050-0298 UNIT CNS DATE October 8. 1993 OPERATING STATUS TELEPHONE (402) 825-5487

1. Unit Name: CooDer Nuclear Station Notes EL Reporting Period: Aucust 1993
3. Ucensed Thermal Power (MWt): 2381
4. Nameplate Rating (Gross MWe): 836
5. Design Electrical Rating (Not MWe): 778
6. Maximum DopeT.able Capacity (Gross MWe): 787
7. Maximum Dependable Capacity (Net MWe): 764
8. N Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, if Any (Net MWe):
10. Reasons For Restriction, N Any:

This Month Yr.-to-Date Cumulative

11. Hours in Reporting Period 744.0 5.831.0 168.048 0
12. Number of Hours Reactor Was Critical 744.0 2.358.0 127.325.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On-Une 740.0 2.266 0 125.474 9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermat Energy Generated (MWH) 1.612.152.0 5.017.704.0 257.861.668.0
17. Gross Electric Energy Generated (MWH) 523.132.0 1.657.266.0 83.648.248 0
18. Net Electric Energy Generated (MWH) 506.931.0 1.603.722.0 80.762.038.0
19. Unit Service Factor 99.5 38.9 74.7
20. Unit Availability Factor 99.5 38.9 74.7
21. Unit Capacity Factor (Using MDC Net) 89.2 36 0 62.9
22. Unit Capacity Factor (Using DER Net) 87.6 35.4 61.8
23. Unit Forced Outage Rate 0.0 0.0 4.2
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. N Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICAUTY INITIAL ELECTRICITY COMMERCIAL OPERATION 9310130204 931008 PDR 7

ALOCK 05000298 R PDR y%