l l..,

OPERATING DATA REPORT DOCKET NO.

050-0298 UNIT CNS DATE October 8. 1993 t'

OPERATING STATUS TELEPHONE

(^02) 825-5487 1.

Unit Name:

COODer Nuclear Station Notes I

2.

Reporting Period:

SeDtember 1993 3.

Ucensed Thermal Power (MWt):

2381 4.

Nameplate Rating (Gross MWe):

836 3.

Design Bectrical Rating (Not MWe):

778 6.

Maximum Dependable Capacity (Gross MWe):

787 7.

Maximum Dependable Capacity (Net MWe):

764 8.

N Changes Occur in Capacity Ratings (ltems Number 3 Through 7) Since Last Report, Give Reasons:

i l

l 8.

Power Level To Which Restricted, N Any (Net MWe):

l 10.

Reasons For Restriction, N Any:

I l

This Month Yr.-to-Date Cumulative 11.

Hours in Reporting Period 720.0 6.551.0 168.768.0 12.

Number of Hours Reactor Was Critical 720 0 3.078 O_

128.045.0 13.

Reactor Reserve Snutdown Hours 0.0 0.0 00 10.

Hours Generator On-Une 720.0 2.986.0 126.194.9 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 13.

Gross Thermal Energy Generated (MWH) 1.706.064.0 6.723.768.0 259.567.732.0 17.

Gross Bectric Energy Generated (MWH) 568.984.0 2.226,250.0 84.217.232.0 18.

Net Sectric Energy Generated (MWH) 552.435.0 2.156.157.0 81.314.473.0 19.

Unit Service Factor 100.0 45.6 74.8 20.

Unit Availability Factor 100.0 45 6 74.8 Unit Capac'ty Factor (Using MDC Net) 100.4 43.1 63.1 31.

r 2*L Unit Capacity Factor (Using DER Net) 98.6 42.3 61.9 l

23.

Unit Forced Outage Rate 00 0.0 4.2 24.

Shutdown Scheduled Over Next 6 Months (Type. Date, and Duration of Eac. ):

h 25.

H Shut Down At End of Report Period, Estimated Date of Startup:

i as.

Units in Test Status (Prior to Commercial Operation):

Forecast Achieved

)

INITIAL CRITICAUTY iNmAL ELECTRICITY COMMERCIAL OPERATION 9310130200 931008 E

PDR ADOCK 05000298 R

PDR d

t je %

l

'l l

AVERAGE DAILY UNIT POWER LEVEL' j

f DOCKET NO.

050-0298 UNIT CNS DATE October 8, 1993 TTLEPHONE '(402) 825-5487 MONTH September 1993 l

i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWa-Net) l l

l 1

764 17 772

+

2 765 18 773 3

766 19 768 l

4 766 20 772 5

759 21

-771 I

6 767 22 771 l

7 767 23 770 i

i 8

770 24 771 I

j 9

769 25 771 j

I 10 770 26 762 11 761 27 773 12 721 28 773 l

l 13 771 29 770 I

i 14 772 30 773 j

15 771 16 771 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for snah day in the reporting month.. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS

].

DOCKET NO.

.050-0298 UNIT NAME Cooper Nuclear Stelloq, DATE October 8.1993 COMPLETED BY S. C. Wheeler TELEPHONE

_(402) 825-5487 REPORT MONTH SeDtember 1993 Method Of Ucensee Cause & Corrective Duration Shutting Event System

  • Component' Action to

' No.

Date Type' (Hours)

Reason

  • Down Fhaetor' Report Code Code Prevent Recurrence None.

i J

i 1

F: Forced 2

fhason:

3 Method:

4 E2Nhit G Instructions for j

S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets for Ucensee Event C Refueling 3-Automatic Scram Report (LER) File (NUREG4161)

D Regulatory Restriction 4 - Continued E - Operator Training & Ucense Examination 5 - Reduced LnN 5 Exhibit I-Same Source F Administrative 6 - Other G - Operational Enor (Explain)

H - Other (Explain) l

..._m.,

........I

-l I

l l

l i

OPERATIONS NARRATIVE t

COOPER NUCLEAR STATION September 1993 1

L t

Cooper Station operated at 100 percent power for the entire month of September, with the exception of planned power reductions for controi rod operabirdy testing on September 5,12,19 and 26, and turbine testing 1

on September 11 and.12.

A unit capacity factor of 100.4 percent (MDC Net) was attained for the month of September.

l

.