ML20057E271
| ML20057E271 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/27/1993 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20057E272 | List: |
| References | |
| NUDOCS 9310080230 | |
| Download: ML20057E271 (3) | |
See also: IR 05000277/1993018
Text
.- -
-
-
--
l.
!
~hbb
-
.
'
.
!
SEP 2 71933
f
!
!
Docket Nos. 50-277
50-278
Mr. D. M. Smith
i
Senior Vice President-Nuclear
Philadelphia Electric Company
Nuclear Group Headquarters
l
Correspondence Control Desk
,
P. O. Box 195
i
Wayne, Pennsylvania 19087-0195
i
Dear Mr. Smith:
,
SUBIECT: INSPECTION REPORT NOS. 50-277/93-18 AND 50-278/93-18
i
f
This letter refers to an announced safety inspection of the engineering and technical support
4
activities related to Peach Bottom Atomic Power Station Units 2 and 3 conducted by .
Mr. A. Lohmeier of this office during the period ~ August 2-6,1993, at Delta, Pennsylvania.
i
A discussion of his findings was held with Mr. Miller and his staff at the conclusion of the
inspection.
'
Areas examined during the inspection described in the NRC Region 1 Inspection Report
'
enclosed with this letter include an assessment of changes in the engineering and technical
support organization through implementation of the NEEDS reorganization program. Also
examined during the inspection was the retention 'of the operational cycle data for
j
components designed to sustain limited numbers of cycles over the lifetime of the plant in
!
l
accordance with the administrative requirements of the technical specification. Continuing
l
evaluation of the effect _of these cycles on the operating equipment is essential to the safe
operation of the plant and protection of the public health and safety.
i
!
j
In review of your monitoring of the effect of operational cycles on equipment designed for
limited numbers of cycles, primarily the reactor coolant system, it was found that the data
_ ;
L
with which to compare actual cycles to design cycles was not kept current. However, the.
.{
inspector noted that a program _is under-way to retrieve such data.~ PBAPS is past mid-life,
l
and it becomes necessary to monitor closely the critical component parts for the possibility of
j
exhaustion of fatigue life of the material, thereby protecting the public health.and safety.
I
i
I
l
-
Q.
>
l_
060049
OFFICIAL RECORD COPY
A:PB931818. INS
1
'
~
93100B0230 930927
j
ADOCK-05000277
G_
PDR '.
_
_
_
_
_
_ _ _ _ _ _ _
_ _ _ _ _ _ _ _
__-____
.
SEP 2 7192
-
.
.
Mr. D. M. Smith
2
.
Your staff has agreed to provide NRC, within 60 days, a schedule of your upgrading of the
operational cycle monitoring program as described in Section 3.1 of this report. Completion
l
of this program will allow resolution of a longstanding unresolved item, UNR 90-14-02.
As a result of this inspection, no deviations or violations were noted.
Sincerely,
Jacques P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosure: NRC Region I Combined Inspection Report Nos. 50-277/93-18 and
50-278/93-18
cc w/ encl:
J. Doering, Chairman, Nuclear Review Board
D. B. Miller, Vice President, Peach Bottom Atomic Power Station
G. Rainey, Vice President, Nuclear Services Department
G. Cranston, General Manager, Nuclear Engineering Division
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
G. Edwards, Plant Manager, Peach Bottom Atomic Power Station
)
A. J. Wasong, Manager, Experience Assessment
G. A. Hunger, Jr., Manager, Licensing Section
J. W. Durham, Sr., Senior Vice President and General Counsel
J. A. Isabella, Director, Generation Projects Department,
Atlantic Electric
l
B. W. Gorman, Manager, External Affairs
R. Mclan, Power Plant Siting, Nuclear Evaluations
D. Poulsen, Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
l
Public Document Room (PDR)
local Public Document Room (LPDR)
)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
'
NRC Resident Inspector
Commonwealth of Pennsylvania
TMI - Alert (TMIA)
i
OFFICIAL RECORD COPY
A:PB931818. INS
.
l
,
.
SEP 2 715M
'
.
Mr. D. M. Smith
3
bec w/ encl.
Region I Docket Room (with concurrences)
bec w/ encl: (Via E-Mail)
i
V. McCree, OEDO
j
Joseph Shea, NRR
M. Boyle, Acting PDI-2, NRR
I
i
<
i
,
\\
i
RI:DRS
RI:DRS
RI:DRS
,ier/dmg
Gray
09/07 3
/t /93
09//f3
OFFICIAL RECORD COPY
A:PB931818. INS
4