Forwards Insp Rept 50-461/93-14 on 930712 & 0902-03 of Licensed Operator Requalification Program.No Violations Noted
ML20057D677
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/29/1993
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20057D678 List:
References
NUDOCS 9310050170
Download: ML20057D677 (2)


See also: IR 05000461/1993014

Text

p

,

'

..

..

R

,

.

September 29, 1993

,

1

Docket No. 50-461

Illinois Power Company

ATTN:

J. S. Perry

Senior Vice President

,

Clinton Power Station

Mail Code V-275

t

P. O. Box 678

Clinton, IL 61727

Dear Mr. Perry:

The enclosed report refers to the inspection conducted by Mr. M. Bielby and

others of this office the week of July 12, and September 2 - 3, 1993. The

inspection evaluated activities at the Clinton Power Station authorized by NRC

'

Operating License No. NPF-62. We discussed our inspection findings with you

j

and members of your staff at the exit meeting conducted on September 3, 1993.

l

The purpose of the inspection was to assess the licensed operator

requalification program. The inspection consisted of re' views of training

'

administrative procedures, representative records, requalification training

materials, interviews with members of the operations and training staffs, and

i

observation of . licensed operators during requalification operating examination

'

administration.

Additionally, a limited number of licensed operator medical

records were randomly selected and reviewed to verify the duration between

i

medical examinations was in accordance with NRC requirements.

Overall, the inspectors concluded that the licensed operator requalification

training program was being implemented in accordance with 10 CFR Part 55

requirements and that operations and training management involvement with the

process was considered a strength.

However, two open items regarding training administration were identified.

One of these open items identifies a concern with the training of operators on

plant control manipulations specified in 10 CFR 55.59.

In lieu of actual

performance operators receive credit for these tasks by just being on the crew

1

when the tasks are performed. We request that you respond within 30 days of

the date of this letter to this open item.

Your response should include the

1

actions taken by your requalification program to ensure licensed operators can

i

actually perform, or direct as appropriate, plant control manipulations'.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations,-'a copy of

this letter and the enclosed report will be placed in the NRC Public Document

Room.

i

1

l

n.nnen

y

9310o5o17o 93o929

P

l

'$DR

ADOCK 05000461

%

i

PDR

k

0

_

7

--

/*

.

,

Illinois Power Company

2

September 29, 1993

>

.

We will gladly discuss any questions you may have concerning this inspection.

.

Sincerely,

Original signed by Mark A.

Ring

'

Mark A. Ring, Chief

Operations Branch

'

Enclosure: Inspection Report

'

No. 50-461/93014(DRS)

cc w/ enclosure:

J. Cook, Vice President, Manager

'

Clinton Power Station

-

R. Phares, Director - Licensing

OC/LFDCB

Resident Inspector, RIII

A. T. Gody, Jr. , LPM, NRR

J. McCaffrey, Chief, Public

Utilities Division

S. Zabel, Esquire, Schiff, Hardin,

& Waite

K. K. Berry, Licensing Services Manager

,

General Electric Company

Chairman, DeWitt County Board

Illinois Department of

'

Nuclear Safety

Robert Newmann, Office of Public

Counsel, State of Illinois Center

.

Perry SRI

'

State Liaison Officer

Chairman, Illinois Commerce

Commission

D. V. Pickett, LPM, NRR

R. Gallo, NRR

D. Thompson, Training Manager

'

cc w/ enclosure: PUBLIC - I

,

RIII

RII

RIII

RIII n

RI

RIII

Y

qfQf

g

wdYi,

JffFA

Bielby/cg]yG5NcNil

Doofnbos

Jorc an

y fgue

Ring

'

09/pt/93

09/)4/93

09/21/93

09/21/93

09f4/93

09/q/93

,

r

9

.

-a