Forwards Insp Rept 50-302/93-18 on 930628-0730 & Notice of Violation.Insp Assessed Capacity of Electrical Distribution Sys to Perform Intended Function
ML20057B418
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/10/1993
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Beard P
FLORIDA POWER CORP.
Shared Package
ML20057B419 List:
References
NUDOCS 9309220001
Download: ML20057B418 (5)


See also: IR 05000302/1993018

Text

{{#Wiki_filter:, ~ b. , v . - . SEP l 01993 Docket No. 50-302 License No. DPR-72 Florida Power Corporation Mr. P. M. Beard, Jr. Sr. VP, Nuclear Operations ATTN: Mgr., Nuclear Licensing P. O. Box 219-NA-21 Crystal River, FL 34423-0219 Gentlemen: SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT N0. 50-302/93-18) This refers to the Electrical Distribution System Functional Inspection led by E. Girard of this office on June 28 through July 30, 1993. The inspection included a review of activities authorized for your Crystal River facility. At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed report. The inspection assessed the capacity of the Electrical Distribution System to perform its intended functions. This was accomplished through a selective review of design calculations, relevant procedures, representative records, and installed equipment; and interviews with engineering and technical support staff. It was concluded that the Electrical Distribution System had the capacity to perform its intended safety functions. However, the reliability of the "B" train safety-related 4160-480 V transformer was questionable. During 1989 and 1990, three of eight similar dry-type 4160-480 V transformers failed at Crystal River. One of the failures was the safety-related "A" train transformer. In 1990 you completed an engineering evaluation that attributed these failures to aging and proposed replacement of the remaining five transformers. Since that time three refueling or midcycle outages have passed and the safety-related "B" train transformer has not been replaced. Please include your schedule for replacement of this transformer in your response to this inspection. Violations of requirements and other findings were identified which require evaluation and resolution. The violations are described in the enclosed Notice of Violation. These and the other findings are described in the executive summary to the enclosed report, with additional details provided in the text. ' 210096 I 93o9220001 930910 b PDR ADOCK 05000302 f) ll G PDR LJ

_ . _ - _ - - _ _ _ - < ., , ' . SEP l 01993 ' . Florida Power Corporation 2 You are required to respond to the Notice of Violation enclosed with this letter and should follow the instructions specified in the Notice when preparing your response. In your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence. 1 After reviewing your response to the Notice, including your proposed corrective actions and the results of future inspections, the NRC will s determine whether further NRC enforcement action is necessary to ensure ' compliance with NRC regulatory requirements. We are requesting that you also respond in writing within 60 days to inspector followup items identified by the inspection, indicating any planned corrective , ' actions and their schedule. The executive summary of the enclosed inspection report describes these items. Should you have any questions concerning this letter, please contact us.

Sincerely, Original signed by A. F. Gibson i Albert F. Gibson, Director Division of Reactor Safety . Enclosures: 1. Notice of Violation 2. NRC Inspection Report , , cc w/encls: Gary L. Boldt ' Vice President, Nuclear Production Florida Power Corporation P. O. Box 219-SA-2C Crystal River, FL 34423-0219 1 B. J. Hickle, Director Nuclear Plant Operations Florida Power Corporation . P. O. Box 219-NA-2C Crystal River, FL 34423-0219 (cc w/encls cont'd - See page 3)

< i : , 1 = Florida Power Corporation 3 SEP l 01993 i j (cc w/encls cont'd) R. C. Widell, Director Nuclear Operations Site Support Florida Power Corporation P. O. Box 219-NA-21 Crystal River, FL 34423-0219 Gerald A. Williams Corporate Counsel Florida Power Corporation MAC - ASA l P. O. Box 14042 ' l St. Petersburg, FL 33733 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Bill Passetti . Office of Radiation Control i i Department of Health and ' i Rehabilitative Services l 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Administrator Department of Environmental Regulation Power Plant Siting Section ' State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 j (cc w/encls cont'd - See page 4) i i

_ _ . . _ _ _ _ - _ _ - _ _ . . ' 'l . , 0m Florida Power Corporation 4 i (cc w/encls cont'd) l l Joe Myers, Director Division of Emergency Preparedness , l Department of Community Affairs l 2740 Centerview Drive Tallahassee, FL 32399-2100 ' Chairman Board of County Commissioner Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Robert B. Borsum B&W Nuclear Technolo es 1700 Rockville Pike Suite 525 Rockville, MD 208 -1631 bec w/encls: K. Landis, RII E. Weiss, NRR 1 N

  1. [-

a o RII y o . ' M. Sinkule, II Y' H g H. Mille , RIII L. Call n[ nan,V RI - < 9 R. Zimrper RV Q 09 A

  1. N'

M#

M. Shy /nlock, RII / H. Si ver, NRR Docu .ent Control Desk p - L M NR Resident Inspector s . U. . Nuclear Regulatory Commission ' 6 45 N. Tallahassee Road hdp' ' ystal River, FL 34428 r y,1p/[c g

  • FOR PREVIOUS CONCURRENCE SEE ATT

y ET y Ip S:\\DRS\\EB\\ CRY 93-18.EHG[[1-hn' FILE: Ab gg ,J s l RII:DRS RII:DRSb5 RII:QR RI RII:DRP Cl{t)b rl [//,%.S- t AuH PFillion MMiller EGirard CJuli n MSinkule 09/ /93 09//o/93 09/ 7 /93 09/ /93 09/f/93 1 ,

. .. , . Florida Power Corporation 4 SEP l 01993 (cc w/encls cont'd) Joe Myers, Director . Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive ' Tallahassee, FL 32399-2100 Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue , Inverness, FL 36250 Robert B. Borsum B&W Nuclear Technologies ) 1700 Rockville Pike, Suite 525 Rockville, MD 20852-1631 ' bec w/encls: K. Landis, RII E. Weiss, NRR J. Jaudon, RII G. Hallstrom, RII M. Sinkule, RII S. Vias, RII - E. Imbro, NRR M. Hodges, RI H. Miller, RIII L. Callan, RIV R. Zimmerman, RV M. Shymlock, RII H. Silver, NRR Document Control Desk NRC Resident Inspector 4 , U.S. Nuclear Regulatory Commission i 6745 N. Tallahassee Road Crystal River, FL 34428 . FILE: S:\\DRS\\EB\\ CRY 93-18.EHG / / RII:DRS RII:DRS RII:DRS. in R RII:DRP 8. A%r)/ lH t) V EW72 M)5 PFillion MMiller EGirard C u ian MSinkule 08/.tr/93 08/A 6 /93 08/ g /93 08/g/93 08/ff/93 }}