- 1. CON ( f( AC I 40 COOL PAGL Of-e ihs I
1
{ 6 AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT
- 4. H LWViht 1 (Or4/PURCr4A50 stLQ. NO.
S. PROJ Lc's No, pf, ppg OA1L 3.LFf4/GTIV
. Aute:OMLf11/MOOf f IC.AT 60H NO.
$/// k9 ADM RFPA No.92-141
- 7. ADMIN (510HLO OY (f(other then licm 6/
Nine (9)
L 455ULO O V E'
l.S. fluclear Regulatory Commission livision of Contracts 8 Property Management fashington, DC 20555 g
SA. AMENOMLNT OF bot.8C(TATtON NO, s.NAMC At40 AOORLs5 0+: CONT RACTOst (No, street. county.Edais en4 ZIPCode)
Ogden Government Services m Om LO ou nu ses 2200 Wilson Boulevard - Suite 600 Arlington, Virginia 22201 loa.gD+ CAuGN OF CONmAcisOROLR X
Principal Investigator /Tecimical f4RC-10-92-141
- ontact:
Mr. William Kenworthy 100.o^rw ganu ess Iclephone No.
( 703) 52S-6032 10/7/91 lFACiUTY CODE 11.THIS ITEM ONLY APPLIESTO AMENDMENTS OF SOLICITATIONS coOE Oiseatend.d. O is oot e The abow numberuf eGeltatkm is emended.es set iorth in item 14. The hour med date.c.edne:f fo"r tw Off. ors msst ecknow4 edge receipt of ttds amendment prior to the tiour and
.mded.
(s) Dy completing itema 8 and 16.ord returnino _
E SPECIFIED MAY RESU1.T submittsd; or (c) By seperste letter or selegram wMch loctudes a reference to the soGeltation and amendment num MENTTO DE RECEfVED ATTHE Pt. ACE DCSIGNATED FOR THE RECEfFTOF OF be made ty telegram or IN REJECTION OF YOUR OFFER. If by virtue of this amendmerit you desire sachange e 8etterd e,.ded each telvr
- u. ACCOUNTING At40 Af+ROPRIAt GON OATA #f argehed)
$ 61. 813. 32 RO1753 eor 7570 AppN Mn vla /a 340-20-010-100 FIN No.
B&R No.
- 13. THiS (TEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTR$CpORDER NO. AS DESCRIBED IN ITEM 14.
ECOMs N, A. TN#5 CHANGE ORDER 85 855ULO PURSUANT TOs Apettffewunorityf TNL CNANGES SLT FOR1H T RACT OROCR NO. IN 4 TEM toA.
h d
dns of/lce, 3.THC ABOvC PfUMBCRCO CONTR ACT/OROCR 85 MOOtrtCO TO REFLECT TNC AOMINtsTRATtv0 appropriedese dear,escJ SCT FORTH IN ITLM 14. PURSUANT TO THC At/THORITY OF F AR 43.103(a).
C. T Nt5 5UPPt LMLitT AL AGRLE.MLNT * ~NTERED $N10 PUR$UANT TO AU1NORITY Of s
~
'd 52.222-43 Mutual Anrenmnne nr the Partion X
FAR Clauses 52.222--
w;
,o O.OwLR 4preuy tupe et mosaw.acn o 2
O,1, inis oocumeRt.no retu,,
CO,le,,,,se i,soin, o,,3ce.
E.IMPORTANT: Contractor O is001 8 is,equirea : 2 dMr.J j e. OECRsP ION OF AMLNOMENT/MOOlt ICADON (Orgentred dry UcFecct.pn headhss,includhg Mcit See following.pages.
D 9309170209 930811 PDR CONTR NRC-10-92-141 PDR
,1
\\
d femains unchang d and in futt (Ofce f
h eg(es proveoed tweein. 88 terrns and cond9&ons c' stw docun.ent seferenced in tem 9A or C.
15A. NAML AND 181 LL Of 54GNLR (Type orprint)
Joyce A. Fields, Contractino Officer 16C.OATE s4GNED 15C. ATL btGNED RB, UNt I E D ST AT LS 0 AMEftlCA
. 6f&
IE 0 91993 R dOfVOf f f ite4 1 b u. CON
<un.t.v. otan.on.unorua ao sans_
fgQ
- , sun.eur, ot cor,ar.cana Orr,ars av c
/
/
mnO Anolewi so tRCv. so-e r r
s.
Contract No. NRC-10-92-141 Modification No. 9 Page 2 of 6 As a result of the Contractor's Collective Bargaining Agreement Nos.
052-1233 and 052-1234 dated July 21, 1992, between Ogden Allied Eastern States Maintenance Corporation and Local 99, International Union of Operating Engineers, AFL-CIO, this Modification No. 9 is issued and accomplishes the following:
I.
Revises the unit prices and total firm fixed price for Option Year 1 Basic Contract Services.
II.
Revises the unit prices for reimbursable contract efforts.
III. Revises the reimbursable labor rates for Option Year 1.
IV.
Revises the contract ceiling accordingly.
V.
Revises the total funds obligated under the contract.
VI.
Incorporates the new wage determination No. 86-1259(Rev. 13) dated 5/28/92 and No. 93-0004 dated 1/8/93.
The revisions associated with the contractor's Collective Bargaining Agreement Nos. 052-1233 and 052d1234 dated July 21, 1992, as set forth in this Modification No. 9, are effective for the Option Year 1 period of the contract which commence November 7, 1992.
Therefore, the following changes are hereby made:
I.
Section B. 4 PRICES FOR BASIC CONTRACT SERVICES and the TOTAL FIRM FIXED PRICE for Option Year 1 as reflected on page 5(c) of the contract, is hereby revised to read as follows:
" OPTION YEAR ONE:
Qty Unit
- Unit Price Total Price 1)
Facility Management and Quality Control 12 MONTH
$16,089.65
$193,075.80 2)
Architectural and Structural Maintenance and Repair 12 MONTH
$ 6,821.93
$ 81,863.16 3)
Custodial 12 MONTH
$39,761.94
$477,143.28 4)
Operations and Maintenance and Repairs 12 MONTH
$26,186.12
$314,233.44
4 Contract No. NRC-10-92-141 Modification No. 9 Page 3 of 6 OPTION YEAR ONE:
Oty Unit
- Unit Price Total Price 5)
Elevator Maintenance 12 MONTH
$10,178.33
$122,139.96 6)
Water Treatment 12 MONTH 491.75 5,900.97 TOTAL FIRM FIXED PRICE FOR OPTION YEAR ONE:
$1,194,356.61
- Note that the 12th month's price may need to be adjusted to assure that total price specified above is not exceeded."
Section B.4 is further revised by changing the summary of the total amount for each year of basic services on page 5(e) of the contract to read as follows:
"The following summarizes the total amount for each year of basic contract services:
$1,186,959.34 The total amount for Base Year:
The total amount for Option Year 1: $1,196,751.62 The total amount for Option Year 2: $1,139,619.56 The total amount for Option Year 3: $1,148,004.'69 The total amount for Option Year 4: $1,153,092.20 GRAND TOTAL FOR BASIC CONTRACT SERVICES:
$5,824,427.41
- Base Year Total amount includes Orientation Period and Optional Task (Phase-In Inspection task)."
II.
The Unit Prices identified for Year 2 (which is Option Year 1 of the contract) under Section B.5.B. UNIT PRICES FOR REIMBURSABLE FACILITIES ALTERATIONS CONTRACT SERVICES, found on pages 5(f) through 5(v) of the contract are revised as set forth in ATTACHMENT I to this Contract Modification No. 9.
III. The Labor Rates identified for OPTION YEAR ONE under Section B.S.C. RATES FOR REIMBURSABLE CONTRACT SERVICES, paragraph 1.
OVERTIME HOURLY RATES and paragraph 2. REGULAR HOURLY RATES, found on pages.5(w) and 5(aa) of the contract are revised as set forth in ATTACHMENT II (OVERTIME HOURLY RATES) and ATTACHMENT III (REGULAR HOURLY RATES) to this contract Modification No. 9.
4 Contract No. NRC-10-92-141 Modification No. 9 Page 4 of 6 IV.
Section B.6
SUMMARY
OF PRICES, paragraph B.
OPTION YEAR ONE is revised to read as follows:
"B.
FOR OPTION YEAR ONE:
For the Basic Contract Services:
$1,196,751.62 For the Reimbursable Contract Services:
700,000.00 Total Price for Option Year One:
$ 1,89 6,7 51. 6 2'-
Section B.6
SUMMARY
OF PRICES is further revised by changing the last paragraph of this section to read as follows:
"The Grand Total Price as known below represents the Total Price for all efforts under this contract:
Total Price for the Base Contract Year:
$1,889,417.88 Total Price for Option Year One:
$1,896,751.62 Total Price for Option Year Two:
$1,839,619.56 Total Price for Option Year Three:
$1,848,004.69 Total Price for Option Year Four:
$1,853,092.20 GRAND TOTAL PRICE:
$ 9,32 6,'8 8 5. 9 5 "
V.
Section B.9 TOTAL CONTRACT OBLIGATION AND CONSIDERATION is revised to read as follows:
"Section B.9 TOTAL CONTRACT OBLIGATION AND CONSIDERATION
- a. The total ceiling amount of this contract in full performance of all efforts for the Base Year and Option Year 1, inclusive of -
the firm fixed price for Section B.3 and B.4, is $3,786,169.50.
b.
The amount presently obligated for the Orientation Period Effort under FIN No. RO1252 is $17,276.00.
The amount presently obligated for payments to be made in c.
accordance with the Phase-In Inspection' Task under FIN No.
RO1252 is $2,212.00.
d.
The amount presently obligated for payments to be made in accordance with the " Price for Basic Services" schedule under FIN No. RO1252 is $1,091,731.00 and FIN No. RO1253 is $61,813.32; totalling $1,153,544.32.
The amount presently obligated for payments to be made in e.accordance with the " Price for Basic Services" schedule under FIN No. SO1252 is $25,000.00.
1
'g_'
Contract No. NRC-10-92-141 Modification No. 9 Page 5 of 6 f.
The amount presently obligated for payments to be made in accordance with the " Price for Basic Services" schedule under FIN No. D2360 is $2,395.01.
g.
The amount presently obligated for performance of all Reimbursable Contract Services in accordance with Section C.3.9 of the Contract is $728,200.00 (FY'92) and $700,000.00 (FY'93);
totalling $1,428,200.00.
The following is a breakdown of this~
amount by FIN No.:
FIN No.
Amount R01252 (GSA)
$600,000.00 SO1252 (GSA/R&A)
.50,000.00 D2316-2 (Alterations) 25,000.00 D2315-2 (Maintenance Repair) 25,000.00 D2314-2 (Overtime HVAC) 28,200.00 SUBTOTAL 728,200.00 RO1253 (GSA)
$600,000.00 SO1253 (GSA/R&A) 50,000.00 D2316-3 (Alterations) 50,000.00 SUBTOTAL 700,000.00 TOTAL
$1,428,200.00 h.
The amount presently obligated for the Base Year and Option f
Year 1 in performance of all contract efforts is $3,761,170.62. -
This amount is summarized as follows:
BASE YEAR Requirement FIN No.
Amount l
Orientation Period Effort RO1252 (GSA) 17,276.00 Phase-In Inspection Task RO1252 (GSA) 2,212.00 Basic Contract Services S01252 (R&A) 25,000.00 Basic Contract Services RO1252 (GSA) 1,091,731.00 Reimbursable Contract Services RO1252 (GSA) 600,000.00 Reimbursable Contract Services SO1252 (R&A) 50,000.00 Reimbursable Contract Services D2316-2 (Alt.)
25,000.00 Reimbursable Contract Services D2315-2 (Maint.)'
25,000.00 Reimbursable Contract Services D2314-2 (OT HVAC). 28,000.00 SUBTOTAL
$1,864,419.00
5 Contract No. NRC-10-92-141 Modification No. 9 Page 6 of 6 OPTION YEAR 1 Requirement FIN No.
Amount Basic Contract Services D2360 (NRC) 2,395.01 Basic Contract Services RO1253 (GSA) 1,194,356.61 t
Reimbursable Contract Services RO1253 (GSA) 600,000.00 Reimbursable Contract Services SO1253 (R&A) 50,000.00 Reimbursable Contract Services D2316-3 (Alt.)
50,000.00 SUBTOTAL
$1,896,751.62 TOTAL
$3,761,170.62 1.
Payments to the contractor for operation and management of the NRC Parking Facilities shall not be made from funds obligated for contract performance.
The contractor shall be reimbursed for operating costs."
VI.
The updated wage determination No. 86-1259 (Rev. 13) dated 5/28/92 and No. 93-0004 dated 1/8/93 as issued by the Department of Labor, are hereby incorporated into this contract.
All other terms and conditions nnder the subject contract remains unchanged.
A summary of obligations for this contract from award date through the date of this action is given below:
Total FY 92 obligation amount $1,886,959.00 Total FY 92 deobligation amount $1,886,959.00 Total FY 92 obligation amount $1,864,419.00 Total FY 93 obligation amount $1,134,938.30 Total FY 93 deobligation amount $1,132,543.29 Total FY 93 obligation amount $1,894,356.61 Cumulative total of NRC obligation amount $3,761,170.'62 This modification obligates FY 93 funds in the amount of $61,813.32 for FIN No. RO1253.
i
~1 s
=
ATTACHMENT I Page 1 of 14 (TO MODIFICATION No. 9)
OPTION YEAR 1 REIMBURSADLE CONTRACT SERVICES DURING DURING ITEM-contract no. NRC-10-92-141 WORK NON-WORK UNIT HOURS HOURS NO SUPPLIES / SERVICES CARPENTRY ITEMS Partitions', metal stud w/ 1/2" drywall, each side, includes base & paint.
Ceiling hgt.
3"-0" ft.
C-1 A) Remove (includes doors & patch floor & ceiling) 1-50 LF LF 9.83 13.52 B) Remove over 50 LF LF 9.83 13.52 C) Patch a paint wall e point of removal EA 82.92 114.01 D) Furnish & install 1-50 LF LF 32.01 44.02 E) Furnish & install over 50 LF LF 32.01 44.02 Partitions, metal stud w 1/2" drywall, each side, includes base & paint.
Slab to slab 10'-6" ft.
C-2 A) Remove (includes doors & patch floor & ceiling 1-50 LF LF 10.32 14.18 B) Remove over 50 LF LF 10.32 14.18 C) Patch & paint wall e point of removal EA 107.64 148.00 D) Furnish & install
'1-50 LF LF 36.47 50.15 E) Furnish & install over 50 LF LF 36.47 50.15 Add to C-1 D or C-1 E C-3 A) 1 HR fire rating LF 1.47 2.02 D) Vinyl covered wall board LF 7.36 10.11 C) Sound Insulation-3 1/2" batt exist wall LF 18.34 25.21 D) Sound Insulation-3 1/2" batt exist wall LF 18.34 25.21 E) Vinyl wall covering LF 13.93 19.15 F) Add 1/2" D/ wall to one side exist wall LF 12.01 16.51 Add to C-2 D or C-2 E C-4 A) 1 HR fire rating LF 3.59 4.94 B) Vinyl covered wall board LF 10.06 13.84 C) Sound Insulation-3 1/2" batt new wall LF 4.24 5.83 D) Sound Insulation-3 1/2" batt exist wall LF 21.87 30.07 E) Vinyl wall covering LF 18.28 25.13 F) Add 1/2" D/ wall to one side exist wall LF 14.12 19.42
ATTACHMENT I Page 2 of 14 (TO MODIFTCATION NO.9)
J OPTION YEAR 1 DURING DURING ITEM contract no. NRC-10-92-141 WORK NON-WORK o
NO SUPPLIES / SERVICES UNIT HOURS HOURS Bank-type Partition (Demountable) 1 C-5 A) Remove (includes doors & patch floor)
LF 7.29 10.02 B) Relocate LF 12.67 17.42' C) Furnish & install LF 106.27 146.12
~
D) Install Government furnished portions LF 5.38 7.40 E) Adjust partitions af ter relocation and installation LF 3.14 4.32 Moveable Metal Partitions C-6 A) Remove (includes doors & patch i
floor and ceiling LF 8.30 11.41 B) Relocate LF 15.58 21.42 C) Furnish & install LF 96.96 133.32 D) Install Government furnished portions LF 7.29 10.02 E) Adjust partitions after relocation and installation LF 3.47 4.78 Drywall partitions 4 to Sft high with wood cap and ends C-7 A) Remove LF 3.92 5.39 B) Furnish & install LF 27.09 37.25 Masonry Partitions C-8 A) Remove 4" thick (includes doors
& patch floor & ceiling)
LF 7.76 10.67 D) Remove 6" thick (includes doors
& patch floor & ceiling LF 7.87 10.82 C) Remove 6" thick (includes doors
& patch f)oor & ceiling LF 7.87 10.83 i
D) Furnish & install 4" thick LF 50.02 68.78 E) Furnish & install 6" thick LF 52.96 72.83 F) Furnish & install 6" thick (8" )
LF 64.30 88.41 l
C-9 A) Remove vinyl base' LF 0.33 0.45 B) Remove vinyl base LF 0.33 0.45 C-10 A) Remove damaged vinyl asbestos tile and replace LF 6.50 8.93-1 B) Furnish & install. vinyl asbestos tile and replace LF 24.39 33.53 5.99 C-11 A) Remove carpet SY 4.35
. 45.57 B) Furnish &' install carpet SY 33.14 C) Patch carpet SY 5.12 7.04 D) Install 2'x2' Government l
furnished carpet tiles SF 0.57 0.78
d ATTACHMENT I Page 3 of 14 (TO NODIEICATION No.9)
OPTION YEAR 1 DURING DURING ITEM-contract no. NRC-10-92-141 WORK NON-WORK NO SUpFLIES/ SERVICES UNIT HOURS HOURS C-12 Acoustical tile glued to wall or ceiling A) Remove 12x12 Acoustic tile patch & paint SF 5.03 6.92 B) Remove 2'x4' Acoustic tile, patch & paint SF 5.30 7.29 C) Furnish & install 12x12 Acoustic tile SF 3.50 4.81 D) Furnish & install 2x4 Acoustic tile SF 4.13 5.67 Acoustical Ceilings C-13 A) Remove & reuse 12'x12' spline type SF 1.39 1.91 B) Remove & reuse 2'x2' spline type SF 1.32 1.81 C) Remove & reuse 2'x4' lay-in type.
SF 1.27 1.75 D) Replace damaged 12"x12" spline type SF
-2.45 3.37 E) Replace damaged 2'x2' spline type SF 2.38 3.27 F) Replace damaged 2"x4" lay-in type SF 1,57 2.15 G) Remove 12"x12" spline title include suspension SF 0.22 0.31 H) Remove 2'x2' spline tile include suspension SF 0.21 0.29 I) Remove 2"x4\\' lay-in tile include suspension SF 0.20 0.28 J) Furnish & install 12"x12" spline tile include suspension SF 2.22 3.06 K) Furnish & install 2'x2' spline tile include' suspension SF 2.17 2.98 L) Furnish & install 2'x4' lay-in tile include suspension SF 1.98 2.72 Raised Flooring C-14 A) Remove - include ramps & rails SF 3.41 4.69 B) Furnish & install floor SF 14.71 20.23 C) Furnish & install ramps & steps SF 18.83 25.89 D) Furnish & install hand rails-LF 45.31 62.31
- E) Add IBM or equal grounded carpet SF 2.35 3.24
ATTACHMENT 1 p
4 gg g (TO MODIFICATION NO.9)
OPTION YEAR 1 DURING DURING ITEM contract no. NRC-10-92-141 WORK NON-WORK NO SUPPLIES / SERVICES UNIT HOURS HOURS Government furnished blackboards bulletin boards, framed maps, etc.
C-15 A) Hang - up to 16 sf (approx. 4'x4' 25 lbs.)
EA 25.78 35.45 B) Hang - up to 36 sf (approx. 6'x6' 50 lbs.)
EA 41.48 57.03 C-16 Government furnished pictures, certificates, etc.
EA 14.57 20.04 C-17 Systems Furniture A) Remove EA 246.61 339.09 B) Install EA 538.06 739.83 C) Relocate EA 784.67 1078.91 D) Adjust after installation and relocation EA 123.30 169.54 PAINTING (All work "To cover" existing surfaces)
P-1 A) Single door & frame 1 side EA 21.19 29.13 B) Single door & frame 2 sides EA 42.37 58.26 C) Frame only EA 15.30 21.04 D) Relocated door & frame EA 49.87 68.57 E) Double door & frame EA 84.74 116.52 F) Dutch door & frame EA 35.31 48.55 Wall or partition includes preparation P-2 A) Flat SF 0.56 0.78 B) Semi-gloss SF 0.61 0.84 P-3 A) Masonry wall - new 2 coats SF 1.98 2.72 B) Masonry wall - existing I coat SF 0.99 1.36 P-5 A) Convector cover - flat SF 0.74 1.02 B) Convector cover - semi-gloss SF 0.80 1.10 P-6 A) Wall grill 2'x2' EA 2.97 4.08 B) Wall grill 3'x4' EA 8.90 12.23 P-7 Skim Walls (1/8" plaster)
SF 8.33 11.46 1 ty P-8 Base - 4" semi-gloss SF 0.62 0.86 P-9 Duct conduit piping larger than 6 in.
IN 1.02 1.41
l ATTACHMENT I Page 5 of 14 (To MODIFICATION No.9)
OPTION YEAR 1-DURING DURING ITEM contract no. NRC-10-92-141 WORK NON-WORK NO SUPPLIES / SERVICES UNIT HOURS HOURS DOORS D-1 A) Remove door & frame (single) seal opening - patch, paint, & base EA 84.23 115.82 i
l B) Remove door & frame (double) seal opening - patch, paint, & base EA 168.47 231.64 Relocate / removed door & frame, include paint (New Partition)
D-2 A) Single hollow / core wood, wood frame EA 88.27 121.38 B) Single hollow / core wood, metal irame EA 88.27 121.38 C) Double hollow / core wood, metal frame PR 176.55 242.76 D) Single solid / core wood, metal frame EA 88.27 121.38 E) Double solid / core wood, metal frame PR 176.55 242.76 F) Single fire rated solid / core wood, metal frame EA 88.27 121.38 G) Single hollow / core metal, metal frame EA 88.27 121.38 H) Double hollow / core metal, frame PR 176.55 242.76 I) Single fire rated metal, metal frame EA 88.27 121.38 Furnish, install, & paint doors & frambs including passage hardware (New Partition)
D-3 A) Sing N hollow / core wood, wood frame EA 300.13 412.68 B) Single hollow / core wood, metal frame EA 426.14 585.94 C) Double hollow / core wood, metal frame PR 852.28 1171.89 D) S16gle solid / core wood, metal frame EA 459.59 631.94 E) Double solid / core wood, metal frame PR 919.18 1263.87 F) Single fire rated solid / core wood, 6
metal frame EA 544.78 749.07 G) Single hollow / core metal, metal frame EA 550.83 757.40 H) Double hollow / core metal, metal frame PR 1101.67 1514.80 I) Single fire rated metal, metal frame EA 593.21 815.66 J) Single cased opening - metal frame EA 141.24 194.20 K)' Double cased opening - metal frame EA 282.48 388.41
i ATTACIIMENT I (TO MODIFICATION No. 9)
Page 6 of 14 OPTION YEAR 1 DURING DURING ITEM contract no. NRC-10-92-141 WORK NON-WORK NO SUPPLIES / SERVICES UNIT HOURS HOURS In addition to D-2 or D-3 D-4 A) Cut opening, single door (existing ptn)
EA 58.85 80.92 B) Cut opening, double door (existing ptn)
EA 117.70 161.84 D-5 A) Reverse swing of door (same door)
- EA 70.62 97.10 B) Reverse swing of door (new door)
EA 426.07 585.85 D-6 A) Furnish & instal 11 dutch door single solid / core wood EA 480.21 660.30 D-7 A) Add for stain grade door - single EA 158.89 218.48 B) Add for stain grade door - double PR 317.79 436.96 D-8 A) Cut wood door for carpet EA 25.89 35.60 B) Cut metal door for carpet EA 64.73 89.01 D-9 Add for plastic laminate door EA 84.07 115.60 HARDWARE H-1 Substitute locking hardware for passage set - new door prior to installation EA 35.78 49.20 H-2 Furnish & install locking hardware existing door EA 121.23 166.69 H-3 A) Furnish & install panic hardware
" Paddle" single door EA 441.37 606.89 B) Furnish & install panic hardware "Bar" single door EA 461.39 634.42 C) Furnish & install panic hardware "Bar" double door EA 1009.38 1387.90 H-4 A) Install Government furnished simplex lock - wood door EA 33.01 45.39 B) Install Government furnished simplex lock - metal door EA 38.73 53.25 C) Furnish & install simplex lock wood door EA 453.37 62: 33 D) Furnish & install simplex lock door EA 459.09 631.24 I
ATTACHMENT I P ge 7 of 14 (T0 MODIFICATION NO. 9)
OPTION YEAR 1 DURING DURING ITEM contract no. NRC-10-92-141 WORK NON-WORK NO SUPPLIES / SERVICES UNIT HOURS HOURS H-5 A) Furnish & install wall door stop (bumper)
EA 17.00 23.37 B) furnish & install floor door stop EA 16.58 22.80 H-6 Furnish & install door closer EA 105.93 145.65 H-7 Furnish & install deadbolt EA 95.28 131.01 H-8 A) Re-key existing lock (2 keys)
EA 49.62 68.23 B) Furnish & install new cylinder in lock with 2 keys EA 49.62 68.23 C) Duplicate keys EA 4.81 6.62 ELECTRICAL Telephone outlets will include installation of plaster ring and drag line.
Any conduit required will be priced separately.
Remove &/or cap feed to electrical outlet E-1 A) Floor outlet - in floor duct EA 37.02 50.90 B) Floor outlet - core drilled EA 39.26 53.98 C) Wall outlet EA 27.57 37.90 D) Wall outlet - in demolished wall EA 27.57 37.90 Remove &/or cap telephone outlet E-2 A) Floor outlet - in floor duct EA 34.26 47.11 B) Floor outlet - core drilled EA 36.50 50.19 C) Wall outlet EA 25.24 34.70 Remove combination tele-elec outlet E-3 A)' Floor outlet - in floor duct EA 39.37 54.13 B) Floor outlet - core drilled EA 41.61 57.22 E-4 A) Core drill to 2" for outlets -
conduit 1-5 EA 596.62 820.35 B) Core drill to 2" for outlets -
conduit over 5 EA 596.62 820.35 Relocate removed housing & device E-5 A) Floor elec outlet using existing capped outlet EA 18.66 25.66 B) Floor phone outlet using existing capped outlet EA 18.66 25.66 C) Floor elec.. outlet - new location EA 52.93 72.77 D) Floor phone outlet - new location EA 52.93 72.77 i
L
Page 8 of 14 ATTACHMENT I
.(T0 MODIFICATION NO. 9)
OPTION YEAR 1 DURING DURING 178M' contract no. NRC-10-92-141 WORK NON-WORK NO SUPPLIES / SERVICES UNIT HOURS HOURS Furnish & install quadruple elec. outlet E-6 A) Floor outlet - floor duct EA 52.73 72.50 B) Floor outlet - core drilled (see E-4) EA 54.97 75.59 C) Wall outlet EA 49.95 68.68 D) Tele / power pole EA 173.01 237.88 Furnish & install electrical outlet E-7 A) Floor outlet - in floor duct EA 44.15 60.71 B) Floor outlet - core drilled (see E-4) EA 46.39 63.79-C) Wall outlet - includes clock outlets EA 24.44 33.60 Furnish & install telephone outlet E-8 A) Floor outlet - in floor duct EA 44.15 60.71 B) Floor outlet - core drilled (see E-4) EA 46.39 63.79 C) Wall outlet EA 24.44 33.60 Furnish & install combination tele /elec outlet E-9 A) Floor outlet - in floor duct EA 44.15 60.71 B) Floor outlet - core drilled (see E-4) EA 46.39 63.79 Tele / Power (TP) Poles E-10 A) Remove T/P poles & restore area EA 35.92 49.39 i
B) Furnish & install T/P pole w/
elec outlet EA 156.65 215.40 C) Relocate removed T/P pole w/
elec outlet EA 54.28 74.64 D) Furnish & install T/P pole w/
phone outlet EA 156.65 215.40 E) Relocate removed T/P pole w/
phone outlet EA 54.28 74.64 F) Furnish & install T/P pole w/
combination phone /elec outlet EA 173.01 237.88 G) Relocate removed T/P pole w/
combination phone /elec outlet EA 64.93 89.28.
H) Furnish & install dedicated telepole else EA 333.20 458.15 Remove 2'x4' fluorescent lighting fixture E-11 A) Lay-in fix. from 2'x4' grid EA 20.72 28.48 B) Surface mounted fix. from 2'x4' grid EA 20.72 28.48 C) Recessed fix. from spline ceiling EA 20.72 28.48 D) Surface mounted fix. from spline ceiling EA 20.72 28.48 E) Surface mounted fix. from concrete ceiling EA 20.72 28.48
i*
ATTACHMENT I (T0 MODIFICATION NO. 9)
Page 9 of 14 OPTION YEAR 1 DURING DURING ITEM contract no. NRC-10-92-141 WORK NON-WORK NO SUPPLIES / SERVICES UNIT HOURS HOURS Remove 2'x2' fluorescent lighting fixture j
E-12 A) Lay-in fix. from 2'x2' or 2'x4' grid EA 20.72 28.48 B) rface std. fix. from 2'x2' or 2'x4" grid EA 20.72 28.48 C) Recessed fix. from spline ceiling EA 20.72 28.48 D) Surface std. fix. from spline ceiling EA 20.72 28.48 E) Surface std. fix. from ceiling ceiling EA 20.72 28.48
)
Remove l'x4' fluorescent lighting fixture l
E-13 A) Lay-in fix. to 2'x4' grid EA 20.72 28.48 B) Surface std. fix. from 2'x4' grid EA 20.72 28.48 C) Recessed fix. from spline ceiling EA 20.72 28.48 D) Surface std. fix. from spline ceiling EA 20.72 28.48 E) Surface utd. fix. from concrete ceiling EA 20.72 28.48 Remove 150 Watt incandescent fixture E-14 A) Recessed fix. from 2'x4' grid EA 20.72 28.48 B) Surface utd. fix. from 2'x4' grid EA 20.72 28.48 C) Recessed fix. from spline ceiling EA 20.72 28.48 D) Surface utd. fix. to spline ceiling EA 20.72 28.48 E) Surface std. fix. to concrete ceiling EA 20.72 28.48 Relocate 2'x4' fluorescent lighting fixture (includes wiring)
-I E-15 A) Lay-in fix. to 2'x4' grid B) Surf, ace std. iix. to 2'x4' grid EA 142.79 196.33 C) Recessed fix. to spline ceiling EA 149.01 204.89 D) Surface std. fix. to spline ceiling EA 145.14 199.57 E) Surface mtd. fix. to concrete EA 151.37 208.13 ceiling EA 153.72 211.37 Relocate 2'x2' fluorescent lighting fixture (includes wiring)
'E-16 A) Lay-in fix. to 2'x2' or 2'x4' grid EA 134.77 185.31 B) Surface mtd. fix. to 2'x2' or 2'x4' grid EA 130.31 179.18 C) Recessed fix. to spline ceiling EA 137.13 188.55 D) Surface std. fix. to spline ceiling EA 132.66 182.41 E) Surface mtd. fix. to concrete ceiling EA 135.02 185.65 l
~
ATTACHMENT I (T0 MODIf1 CAT 10N NO. 9)
Page 10 of 14 OPTION YEAR 1 DURING DURING ITEM contract no. NRC-10-92-141 WORK NON-WORK NO SUPPLIES / SERVICES UNIT HOURS HOURS i
I Relocate l'x4' fluorescent lighting fixture (includes wiring) l E-17 A) Lay-in fix. to 2'x4' grid EA 134.77 185.31 B) Surface std. fix to 2'x4' grid EA 130.31 179.18 C) Recessed fix. to spline ceiling EA 137.13 188.55 D) Surface utd. fix. to spline ceiling EA 132.66 182.41 E) Surface atd. fix. to concrete ceiling EA 135.02 185.65 Relocate 150 Watt incandescent fixture (includes wiring)
E-18 A) Recessed fix. to 2;x4; grid EA 134.77 185.31 B) Surface std. fix. to 2'x4' grid EA 130.31 179.18 C) Recessed fix. to spline ceiling EA 137.13 188.55 D) Surface utd. fix. to spline ceiling EA 132.66 182.41 E) Surface utd. fix. to concrete EA 135.02 185.65 ceiling Furnish & install 2'x4' fluorescent lighting fixture (includes wiring)
E-19 A) Lay-in 2'x4' fix. in 2'x4' grid EA 253.02 347.90 B) Surface std. fix. to 2'x4' grid EA 243.76 335.17 C) Recessed fix. to spline ceiling EA 255.38 351.14 D) Surface utd. fix. to spline ceiling EA 246.09 338.37 E) Surface mtd. fix. to concrete ceiling EA 248.47 341.64 Furnish & install 2'x2' fluorescent lighting fixture (includes wiring)
E-20 A) Lay-in fix. in 2'x2' or 2'x4' grid EA 228.34 313.97 B) Surface utd. fix. in 2'x2' or 2'x4' grid EA 200.54 275.74 C) Recessed fix. to spline ceiling EA 230.69 317.20 D) Surface std. fix. to spline ceiling EA 202.89 278.98 E) S"rface mtd. fix, to concrete ceiling EA 205.25 282.21 Furnish & install l'x4 fluorescent lighting fixture (includes wiring)
ATTACHMENT I (10 MODIFICATION NO. 9)
Page 11 of'14 OPTION YEAR 1 DURING DURING ITEM contract no. NRC-10-92-141 WORK NON-WORE NO SUPPLIES / SERVICES UNIT HOURS IIOURS E-21 A) Lay-in fix. in 2'x4' grid EA 228.34 313.97 B) Surface std. fix.in 2"x4' grid EA 200.54 275.74 C) Recessed fix. to spline ceiling EA 230.69 317.20 D) Surface std. fix. to spline ceiling EA 202.89 278.98 E) Surface utd. fix. to concrete ceiling EA 205.25 282.21 Furnish & install 150 Watt incandescent fixture (includes wiring)
E-22 A) Recessed fix. In 2'x'4' grid EA 228.34 313.97 i
B) Surf ace std. fix. in 2"x4' grid EA 200.54 275.74 C) Recessed fix. to spline ceiling EA 230.69 317.20-D) Surface atd. fix. to spline ceiling EA 202.89 278.98 E) Surface std. fix, to concrete ceiling EA 205.25 282.21 Combination light fixture /liVAC E-23 A) Remove troffer fix. - lay-in ceiling' EA 20.72 28.48 B) Remove troffer fix. - spline ceiling EA 20.72 28.48 C) Relocate troffer fix. - lay-in ceiling EA 93.47 128.51 D) Relocate troffer fix. - spline ceiling EA 95.82 131.75 E) Furnish & install troffer fix. -
lay-in EA 129.72 178.36 F) Furnish & install troffer fix. -
spline EA 131.96 181.44 Light Switches (includes wiring to first fixture)
,E-24 A) Remove switch & cap EA 27.57 37.90 D) De-energize switch - demolished wall EA 27.57 37.90 C) Relocate switch EA 55.92 76.89 D) Furnish & install switch EA 32.39 44.54 E) Furnish & install set of 3-way swithces EA 35.63 48.99 F) Reswitch or make wiring change for individual or group of lights to a different circuit or switch; 2
each wiring change EA 61.57 84.66
)
E-25 A) Remove 2000, watt dimmer EA 27.57 37.90 B) Relocate 2000 watt dimmer EA 55.92 76.89 C) Furnish & install 2000 watt dimmer EA 206.14 283.44 J
i 1
1
ATTACHMENT I (T0 MODIFICATION NO. 9)
Page 12 of 14 OPTION YEAR 1 DURING DURING ITEM contract no. NRC-10-92-141 WORK NON-WORK NO SUPPLIES / SERVICES UNIT HOURS HOURS Special Outlets Separate circuit for CRT with solid ground E-26 A) Furnish & install receptacle (120V, 20 AMP), including wire and 20 AMP breaker EA 205.24 282.20 B) Furnish & install extra outlet EA 93.47 128.52 Note: CRT circuit may have up to 4 outlets Dedicated copier outlets, includes breaker and wire (Government furnished receptacle)
E-27 A) Remove copier outlet EA 37.02 50.90 B) Relocate copier outlet EA 76.50 105.19 l
l Furnish & install wiring & breaker, &
install dedicated copier outlet (Government furnished receptacle)
EA 180.28 247.88 E-88 A) 120V-20 AMP
+
B) 120V-30 AMP EA 183.41 252.19 C) 220V-20 AMP EA 188.07 258.59 D) 220V-30 AMP EA 191.20 262.90 E) 220V-50 AMP EA 194.55 267.51 Furnish & install dedicated electric outlets.
Includes breaker and wire E-29 A) 120V-20 AMP EA 192.66 264.91 B) 120V-30 AMP EA 196.58 270.30 C) 220V-20 AMP EA 201.37 276.89 D) 220V-30 AMP EA 210.76-289.79 E) 220V-50 AMP EA 229.09 315.00 F) Remove dedicated electric outlet EA 37.02 50.90 Relocate dedicated electric outlets.
Includes breaker and wire E-30 A) 120V-20 AMP EA 88.56 121.76 B) 120V-30 AMP EA 88.56 121.76 l
C) 220V-20 AMP EA 88.56 121.76 D) 220V-30 AMP EA 88.56 121.76 E) 220V-50 AMP EA 88.56 121.76 1
1
9.'
ATTACHMENT 1 (T0 MODIFICATION NO. 9)
Page 13 of 14' OPTION YEAR 1 DURING DURING ITEM contract no. NRC-10-92-141 WORK NON-WORK NO SUPPLI ES/ SERVICES UNIT HOURS HOURS E-31 A) BX #12/2 LF 1.67 2.30 B) BX #12/3 LF 1.99 2.74 C) BX #10/2 LF 2.11 2.90 D) BX #10/3 LF 2.47 3.40 (2.4 grid) Conduit-including set screw couplings and connectors E-32 A) EMT 3/4 in.
LF 2.28 3.14 B) EMT 1 in.
LF 2.90 3.98 (Spline cig) Conduit-including set screw couplings and connectors E-33 A) EMT 3/4 in.
LF 2.38 3.28 B) EMT 1 in.
LF 3.01 4.14 Computer cable (Government furnished)
E-34 A) Install teflon computer cable 1/4" LF 0.58 0.79 B) Install teflon computer cable 3/8",
LF 0.60 0.83 C) Install computer cable in conduit 1/4" LF 0.49 0.68 D) Install computer cable in conduit 3/8" LF 0.52 0.71 E) Remove computer cable LF 0.14 0.19 P
- Note Conduit priced separately above E-35 Reactivate / deactivate light fixture EA 17.84 24.53 Ceiling exhaust fan with switch and necessary wiring E-36 A) Furnish & install 100 CFM fan EA 229.79 315.97 B) Furnish & install Heavy Duty (2 speed) 2900 CFM fan EA 998.77 1373.30 C) Remove ceiling fan and wiring EA 33.63 46.24 D) Relocate 100 CFM fan EA 72.86 100.18 E) Relocate Heavy Duty (2 speed) 2900 CFM fan EA 103.13 141.80 MECHANICAL (includes restoration of ceiling or other af fected Grills, ceiling mounted M-1 A) Remove EA 23.54 32.37 B) Relocate EA 17.94 24.66 C) Furnish & install EA 62.77 86.31
l ATTACHMENT 1 (TO MODIFICATION NO. 9)
Page 14 of 14 OPTION YEAR 1 DURING DURING ITEM contract no. NRC-10-92-141 WORK NON-WORK NO SUPPLIES / SERVICES UNIT HOURS HOURS Air Diffusers, ceiling mounted M-2 A) Remove EA 26.90 36.99 B) Relocate EA 21.30 29.28 C) Furnich & install EA 113.22 155.67 Convectors-Includes complete job-cutting, patching, touchup, plumbing, electrical, and controls M-3.A) Remove EA 39.23 53.95 B) Relocate EA 116.58 160.30 C) Furnish & install EA 174.87 240.44 D) Replace EA 102.01 140.26 Fan Coil Units M-4 A) Remove EA 72.86 100.18 i
B) Relocate EA 95.28 131.01 C) Furnish & install EA 1109.74 1525.89 I
D) Replace EA 168.14 231.20 l
Thermostats, wall mounted, pneumatic i
M-5 A) Remove EA 27.07 37.22 B) Relocate EA 34.81 47.86 C) Furnish & install EA 57.36 78.88 D) Replace EA 61.88 85.08 Thermostats, wall mounted, electric M-6 A) Remove EA 23.54 32.37 B) Relocate EA 30.27 41.62 C) Furnish & install EA 49.88 68.59 D) Replace EA 53.81 73.98 NOTE EA Each LF Lineal Foot SF Square Foot
i, ATTACIIMENT II (TO MODIFICATION No. 9)
REVISED OVERTIME Il0URLY RATES CONTRACT NO. NRC-10-92-141 UNLOADED LOADED REGULAR OVERTIME IlOURLY EST.
Il0URLY RATE HRS.
RATE
==== r.
=
==
ELECTRICIAN
$1. ?f ti 100
$28.03 MAINTENANCE MECilANIC
$15.i
/
100 528.03 FACILITY MANAGER
$24.52 50 543.49 TECIINICAL MANAGER
$21.58 75
$38.28 PIPEFITTER (PLUMBER)
$15.40 25 528.03 IIVAC HECHANIC
$15.40 40
$28.03 CARPENTER
$15.40 25
$28.03 PAINTER (MAINTENANCE MECHANIC)
$15.40 100
$28.03 PLUMBER
$15.40 30
$28.03 IIELPER
$9.68 25 S1'i.61 GENERAL LABORER
$9.68 25
$17.61 GROUND MTCE LADORER (UC)
$6.49 20
$11.81 REFU'SE COLLECTION LABORER (UTILITY CLEANER) 56.49 15 511.81 PAREING ATTENDANT
$6.07 20
$11.05 LOCKSMITil (CARPENTER)
$15.40 10
$28.03 CLEANING SUPERVISOR
$10.8375 25 519.22 JANITOR \\ PORTER
$5.99 25 510.91 CARPET INSTALLER /
REPAIRER (CARPENT3R) 515.40 10 528.03 CHIEF ENGlNEER
$20.09
$36.57 I
t 4
l 1
0*
I ATTACHMENT III (TO NODIFICATION NO. 9)
REVISED REGULAR HOURLY RATES CONTRACT NO. NRC-10-92-141 LOADED REGULAR EST.
Il0URLY HRS.
RATE
==
ELECTRICIAN 100
$21.80 MAINT. MECHANIC 100 521.80 FACILITY MANAGER 50
$31.26 TECilNICAL MANAGER 75
$27.73 PIPEFITTER (PLUMBERI 25
$21.80
.HVAC HECHANIC 40 521.80 CARPENTER 25 s21.80 PAINTER (MAINTENANCE MECHANIC) 100 521.80 PLUMBER 30 s21.80 HELPER 25
$14.35 GENERAL LABORER (HELPER) 25 514.35 GROUND HTCE LABORER (UTILITY CL 20
$12.39 REFUSE COLLECTION LABORER (UTILITY CLEANER) 15 s12.39 PEST CONTROLLER (MAINTENANCE ME 15 521.80 FIRE EXTINGUISHER REPAIRER (MAINTENANCE MECHANIC) 10 521.80 PARKING ATTENDANT 20
$8.67 LOCKSMITH (CARPENTER) 10 s21.80 CLEANING SUPERVISOR 25 514.58 JANITOR \\ PORTER 25 s8.58 CARPET INSTALLER /
REPAIRER (MAINTENANCE MECHANIC) 10 521.80
- Chief Engineer S 26.70
.