September 2, 1993 l
Docket No. 50-213 Distribution:
)
Docket File:
CGrimes i
NRC & Local' PDRs ACRS (10) l PD I-4 Plant RJones.
Mr. John F. Opeka SVarga OPA Executive Vice President, Nuclear JCalvo OC/LFDCB Connecticut Yankee Atomic Power Company SNorris LTDoerflein, RI J
Northeast Nuclear Energy Company AWang RCooper Post Office Box 270 OGC Hartford, Connecticut 06141-0270 DHagan GHill (2) l Dear Mr. Opeka
SUBJECT:
ISSUANCE OF AMENDMENT (TAC NO. M86504) i The Commission has issued the enclosed Amendment No.163 to Facility j
Operating License No. DPR-61 for the Haddam Neck Plant, in response to your application dated May 18, 1993.
j The amendment adds a footnote to the Haddam Neck Technical Specifications Section 3.4.2.2, " Reactor Coolant Systems - Operating," to allow a relaxation in the pressurizer safety valve setpoint tolerance to +3% from +1%.
This +3%
tolerance is used for the "as found" acceptance criterion for additional valve testing.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Reaister j
notice.
i Sincerely, q
Original signed by:
Alan B. Wang, Project Manager l
. Project Directorate I-4 Division of Reactor Projects - I/II Office ~ of Nuclear Reactor Regulation l
Enclosures:
l 1.
Amendment No.163 to DPR-61 j
l 2.
Safety Evaluation l
cc W/ enclosures:
kh k g See next page 9309140061 930902 PDR ADOCK 05000213 P
PDR i
- SEE PREVIOUS CONCURRENCE OFFICE LA:PDI-4*
PM:PDI-4*
BC:SCSB*
BC:EMEB MRJ44 0GC\\
NAME SNorris AWang:bp RJones
[No$eYg kShz Ib DATE 8/11/93 8/11/93 8/16/93 6 /2c'/93 9/I/93 k/N93
'O OFFICIAL RECORD COPY Document Name: G:\\ WANG \\PSVSET_
g i-
p*"%q
+
i
(
S UNITED STATES 3
NUCLEAR REGULATORY COMMISSION g.
/
wAssincrow o.c. rosss-ooos September 2, 1993 Docket No. 50-213 Mr. John F. Opeka Executive Vice President, Nuclear 1
Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
ISSUANCE OF AMENDMENT (TAC N0. M86504) a The Commission has issued the enclosed Amendment No. 163 to facility Operating License No. DPR-61 for the Haddam Neck Plant, in response to your application dated May 18, 1993.
The amendment adds a footnote to the Haddam Neck Technical Specifications Section 3.4.2.2, " Reactor Coolant Systems - Operating," to allow. a relaxation in the pressurizer safety valve setpoint tolerance to +3% from +1%.
This +3%
tolerance is used for the "as found" acceptance criterion for additional valve testing.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Reaister notice.
Sincerely,
'l.bw bd G.tuf Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Enclosures:
1.
Amendment No.163 to DPR-61 2.
Safety Evaluation cc w/ enclosures:
See next page
Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:
Gerald Garfield, Esquire R. M. Kacich, Director Day, Berry and Howard Nuclear Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President S. E. Scace, Vice' President Nuclear Operations Services Millstone Nuclear Power Station Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 2/0 Post Office Box 128 Hartford, Connecticut 06141-0270 Waterford, Connecticut 06385 l
Kevin McCarthy, Director Regional Administrator i
Radiation Control Unit Region I Department of Environmental Protection U.S. Nuclear Regulatory Commission State Office Building
_475 Allendale Road i
Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Allan Johanson, Assistant Director Board of Selectmen Office of Policy and Management Town Office Building Policy Development & Planning Division Haddam, Connecticut 06438-l 80 Washington Street i
Hartford, Connecticut 06106 Resident Inspector Haddam Neck Plant J. P. Stetz, Vice President c/o U.S. Nuclear Regulatory Commission Haddam Neck Plant 361 Injun Hollow Road l
Connecticut Yankee Atomic Power Company East Hampton, Connecticut 06424-3099 362 Injun Hollow Road East Hampton, Connecticut 06424-3099 Nicholas S. Reynolds Winston & Strawn D. J. Ray 1400 L Street, NW Haddam Neck Unit Director Washington, DC 20005-3502 Connecticut Yankee Atomic Power Company 362 Injun Hollow Road East Hampton, Connecticut 06424-3099 I
G. H. Bouchard, Director Nuclear Quality Services Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270
-.. a