MONTHYEARBVY-99-134, TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure1999-10-21021 October 1999 TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure BVY-99-132, TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-021999-10-18018 October 1999 TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 BVY-99-119, TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank1999-09-21021 September 1999 TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank BVY-99-104, TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS1999-08-18018 August 1999 TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS BVY-99-106, TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance1999-08-18018 August 1999 TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance BVY-99-105, Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS1999-08-17017 August 1999 Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS ML20210D2431999-07-20020 July 1999 Application for Amend to License DPR-28,revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20210D3241999-07-20020 July 1999 TS Proposed Change 218 to License DPR-28,evaluating Increase in Allowable Core Flow from 100% to 107%.Listed Specific Change Proposed ML20209G1631999-07-12012 July 1999 TS Proposed Change 221 for License DPR-28,revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values.Proprietary & non-proprietary GE Info Re SLMCPR Values,Encl.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20196K2881999-06-29029 June 1999 Application for Amend to License DPR-28 to Incorporate Attached Proposed Change 220 Into Ts.Proposed Change Revises Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2801999-06-24024 June 1999 TS Proposed Change 214 to License DPR-28,revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20196F4011999-06-23023 June 1999 Application for Amend to License DPR-28 to Amend Previous Approvals Granted Under 10CFR20.302(a) for Disposal of Contaminated Septic Waste & Cooling Tower Silt to Allow for Disposal of Contaminated Soil ML20195J8491999-06-15015 June 1999 Application for Amend to License DPR-28,increasing Stis, Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9461999-06-0909 June 1999 Supplement to 990416 Proposed Change 213 for License DPR-28, Allowing Use of Amse Code Case N-560,in Lieu of Certain Provisions of GL 88-01 ML20195C8711999-05-26026 May 1999 TS Proposed Change 203 to License DPR-28,clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3621999-05-0606 May 1999 Application for Amend to License DPR-28,to Delete Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20206J7121999-05-0505 May 1999 Application for Amend to License DPR-28,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys & Incorporate Certain Provisions of NRCs Rule on Anticipated Transients ML20205S9391999-04-20020 April 1999 TS Proposed Change 211 to License DPR-28,revising Reactor Spiral Reloading Pattern Beginning Around Source Range Monitor ML20205T4621999-04-19019 April 1999 Supplemental Application for Amend to License DPR-28 to Incorporate Certain Changes to Section 6 of Ts.Submittal Supplements 990201 Request for Amend & Revises Portions of Proposed Change 208 as listed.Marked-up TS Pages Encl ML20205S4031999-04-16016 April 1999 Application for Amend to License DPR-28,modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 BVY-98-165, TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn1998-12-11011 December 1998 TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn BVY-98-119, LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors1998-12-10010 December 1998 LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors BVY-98-162, TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation1998-12-0707 December 1998 TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation BVY-98-118, Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application1998-11-0303 November 1998 Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G4921998-11-0202 November 1998 TS Proposed Change 197 to License DPR-28,modifying Tech Specs to More Clearly Describe ECCS Actuation Instrumentation - LPCI Sys A/B RHR Pump Start Time Delay Requirements BVY-98-130, TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4))1998-09-0404 September 1998 TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4)) ML20236H4221998-06-30030 June 1998 Application for Amend to License DPR-28,modifying TS to Delete ECC Actuation Instrumentation/Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247J8061998-05-0808 May 1998 TS Proposed Change 204 to License DPR-28,reducing Normal Operating Supression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances to Add Heat to Suppression Pool.Rept Re Pool Temp,Encl ML20217P3961998-05-0101 May 1998 Proposed Change 202 to License DPR-28,changing Several Editorial Changes to Administrative Control Section of TSs ML20217G6461998-04-23023 April 1998 Application for Amend to License DPR-28,revising Station SW & Alternate Cooling Sys Requirements ML20217C4491998-03-20020 March 1998 Proposed Change 201 to License DPR-28,modifying Util Licensing Basis by Limiting Time Large Purge & Vent May Be Open to 90 H Per Yr BVY-97-165, Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit1997-12-11011 December 1997 Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit BVY-97-155, Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries1997-11-20020 November 1997 Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries BVY-97-130, Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources1997-10-10010 October 1997 Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources BVY-97-106, Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys1997-08-22022 August 1997 Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys BVY-97-107, Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR1997-08-20020 August 1997 Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR ML20141H1101997-07-11011 July 1997 Application for Amend to License DPR-28,replacing Pp 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1771997-06-0909 June 1997 Application for Amend to License DPR-28,changing TSs to Update Section 6.0 to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Validate or Generate cycle-specific Thermal Hydraulic Stability BVY-96-155, Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements1996-12-10010 December 1996 Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements BVY-96-120, Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.21996-10-11011 October 1996 Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2 BVY-96-104, Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power1996-09-11011 September 1996 Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power ML20117C3901996-08-22022 August 1996 Application for Amend to License DPR-28,requesting Deletion of Existing Action Statement for High Range Stack Noble Gas Monitor & Replacing W/Different Action Statement ML20116J4371996-08-0909 August 1996 Application for Amend to License DPR-28,revising SLs for MCPR Based Upon Util Plant & Cycle Specific Analysis Performed by GE ML20113D8011996-06-28028 June 1996 Proposed Change 187 to License DPR-28,incorporating Std Language for Shutdown Margin Specifications to Allow Calculational Determination of Highest Wroth Control Rod,Per NUREG-1433 ML20107M7691996-04-26026 April 1996 Application for Amend to License DPR-28,deleting Definitions of Unrestricted Area, Restricted Area & Controlled Area ML20101P1261996-04-0404 April 1996 Proposed Change 184 to License DPR-28,revising TS Requirements for Secondary Containment Based on Guidance in NUREG-1433,Rev 1, STS for GE Plants,BWR/4 ML20101N1651996-04-0404 April 1996 Application for Amend to License DPR-28,consisting of Proposed Change 183,revising Existing Requirements for Control Rod & Drive Mechanism Coupling Verification,Per TS 4.3.B ML20097C0451996-02-0505 February 1996 Application for Amend to License DPR-28,consisting of Proposed Change 180 to Correct Typos & Text Inconsistencies BVY-94-123, Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation1994-12-14014 December 1994 Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation BVY-94-105, Proposed Change 177 to License DPR-28,replacing TS 3.7.B, Pages 152,153 & 154 Re Standby Gas Treatment Power Supply Requirements During Refueling Operations1994-12-0808 December 1994 Proposed Change 177 to License DPR-28,replacing TS 3.7.B, Pages 152,153 & 154 Re Standby Gas Treatment Power Supply Requirements During Refueling Operations 1999-09-21
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARBVY-99-134, TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure1999-10-21021 October 1999 TS Proposed Change 228 for License DPR-28,correcting Two Textual Errors & Changing Designation of Ref Figure BVY-99-132, TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-021999-10-18018 October 1999 TS Proposed Change 227 to License DPR-28,revising Activated Charcoal Testing Methodology IAW Guidance Provided in GL 99-02 BVY-99-119, TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank1999-09-21021 September 1999 TS Proposed Change 198 to License DPR-28,increasing Required Vol of Stored Fuel in Diesel Fuel Oil Storage Tank ML20212C2521999-09-17017 September 1999 Amend 175 to License DPR-28,revising TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System & Incorporate Certain Provisions of NRC Rule on Anticipated Transients BVY-99-106, TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance1999-08-18018 August 1999 TS Proposed Change 225 to License DPR-28,revising Definition of Surveillance Frequency to Incorporate Provisions That Apply Upon Discovery of Missed TS Surveillance BVY-99-104, TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS1999-08-18018 August 1999 TS Proposed Change 223 to License DPR-28,revising Reactor Core Spiral Reloading Pattern to Begin Around Srm.Submittal Entirely Supersedes Proposed Change 211 to TS BVY-99-105, Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS1999-08-17017 August 1999 Supplemental Application for Amend to License DPR-28, Correcting Typographical Error & Clarifying Certain Changes to Requirements for High Pressure Core Cooling Sys Contained in TS ML20210D3241999-07-20020 July 1999 TS Proposed Change 218 to License DPR-28,evaluating Increase in Allowable Core Flow from 100% to 107%.Listed Specific Change Proposed ML20210D2431999-07-20020 July 1999 Application for Amend to License DPR-28,revising & Clarifying Operability & SRs of High Pressure Core Cooling Systems ML20209G1631999-07-12012 July 1999 TS Proposed Change 221 for License DPR-28,revising Value for SLMCPR & Deleting Wording Which Specifies These as Cycle 20 Values.Proprietary & non-proprietary GE Info Re SLMCPR Values,Encl.Proprietary Info Withheld,Per 10CFR2.790(b)(1) ML20196K2881999-06-29029 June 1999 Application for Amend to License DPR-28 to Incorporate Attached Proposed Change 220 Into Ts.Proposed Change Revises Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20196H2801999-06-24024 June 1999 TS Proposed Change 214 to License DPR-28,revising & Clarifying Terminology Re Certain RPS Scram Bypass Permissives ML20196F4011999-06-23023 June 1999 Application for Amend to License DPR-28 to Amend Previous Approvals Granted Under 10CFR20.302(a) for Disposal of Contaminated Septic Waste & Cooling Tower Silt to Allow for Disposal of Contaminated Soil ML20195J8491999-06-15015 June 1999 Application for Amend to License DPR-28,increasing Stis, Adding Allowable OOS Times,Replacing Generic ECCS Actions for Inoperable Instrument Channels with function-specific Actions & Relocating Selected Trip Functions from TS ML20195F9461999-06-0909 June 1999 Supplement to 990416 Proposed Change 213 for License DPR-28, Allowing Use of Amse Code Case N-560,in Lieu of Certain Provisions of GL 88-01 ML20195C8711999-05-26026 May 1999 TS Proposed Change 203 to License DPR-28,clarifying Suppression Chamber Water Temp SR 4.7.A, Primary Containment & Modifying Associated TS Bases ML20206H3621999-05-0606 May 1999 Application for Amend to License DPR-28,to Delete Specific Leak Rate Requirements of TS 3.7.A.4 & 4.7.A.4 for Main Steam Line Isolation Valves ML20206J7121999-05-0505 May 1999 Application for Amend to License DPR-28,modifying TS to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to SLC Sys & Incorporate Certain Provisions of NRCs Rule on Anticipated Transients ML20205S9391999-04-20020 April 1999 TS Proposed Change 211 to License DPR-28,revising Reactor Spiral Reloading Pattern Beginning Around Source Range Monitor ML20205T4621999-04-19019 April 1999 Supplemental Application for Amend to License DPR-28 to Incorporate Certain Changes to Section 6 of Ts.Submittal Supplements 990201 Request for Amend & Revises Portions of Proposed Change 208 as listed.Marked-up TS Pages Encl ML20205S4031999-04-16016 April 1999 Application for Amend to License DPR-28,modifying Inservice Insp Requirements of Section 4.6.E to Allow NRC-approved Alternatives to GL 88-01 BVY-98-165, TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn1998-12-11011 December 1998 TS Proposed Change 210 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation.Change 209,withdrawn BVY-98-119, LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors1998-12-10010 December 1998 LAR 206 to License DPR-58,correcting Error in TS 4.9.2 Re Calibr of Augmented Offgas Sys Hydrogen Monitors BVY-98-162, TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation1998-12-0707 December 1998 TS Proposed Change 209 to License DPR-28,resolving Emergent Concern Re Potential Operation Outside of LCO Contained in Current TS & Hence,Potential USQ with Respect to Opening of Manual PCIVs During Plant Operation BVY-98-118, Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application1998-11-0303 November 1998 Application for Amend to License DPR-28,consisting of TS Proposed Change 180,incorporating Number of Minor Corrections or Clarifications Which Enhance Clarity of TSs Without Materially Changing Meaning or Application ML20155G4921998-11-0202 November 1998 TS Proposed Change 197 to License DPR-28,modifying Tech Specs to More Clearly Describe ECCS Actuation Instrumentation - LPCI Sys A/B RHR Pump Start Time Delay Requirements BVY-98-130, TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4))1998-09-0404 September 1998 TS Proposed Change 207 to License DPR-28,increasing Spent Fuel Storage Capacity of Util Spent Fuel Pool from 2,870 to 3,355 Fuel assemblies.Non-proprietary & Proprietary Rept Encl.Proprietary Rept Withheld (Ref 10CFR2.790(a)(4)) ML20236H4221998-06-30030 June 1998 Application for Amend to License DPR-28,modifying TS to Delete ECC Actuation Instrumentation/Core Spray Sys & LPCI Sys Auxiliary Power Monitor Calibr Requirement ML20247J8061998-05-0808 May 1998 TS Proposed Change 204 to License DPR-28,reducing Normal Operating Supression Pool Water Temp Limit & Adding Time Restriction for Higher Temp Allowed During Surveillances to Add Heat to Suppression Pool.Rept Re Pool Temp,Encl ML20217P3961998-05-0101 May 1998 Proposed Change 202 to License DPR-28,changing Several Editorial Changes to Administrative Control Section of TSs ML20217G6461998-04-23023 April 1998 Application for Amend to License DPR-28,revising Station SW & Alternate Cooling Sys Requirements ML20217C4491998-03-20020 March 1998 Proposed Change 201 to License DPR-28,modifying Util Licensing Basis by Limiting Time Large Purge & Vent May Be Open to 90 H Per Yr BVY-97-165, Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit1997-12-11011 December 1997 Application for Amend to License DPR-28,revising Current Value for SLMCPR for Cycle 20,next Operating Cycle. Proprietary Summary of Plant SLMCPR Evaluation for Cycle 20, Encl.Proprietary Info Withheld,Per Encl GE Affidavit BVY-97-155, Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries1997-11-20020 November 1997 Application for Amend to License DPR-28,proposing Mod to Revise Requirements for Main Station Batteries BVY-97-130, Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources1997-10-10010 October 1997 Application for Amend to License DPR-28,revising & Clarifying Requirements of Offsite Power Sources BVY-97-106, Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys1997-08-22022 August 1997 Application for Amend to License DPR-28,amending App a to Modify TS to More Clearly Describe Separation of Switchgear Room Into Two Fire Areas & Incorporate Specifications for New Low Pressure CO2 Suppression Sys BVY-97-107, Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR1997-08-20020 August 1997 Application for Amend to License DPR-28,modifying TS to Update Section 6 in Order to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Generate cycle- Specific Thermal Operating Limits in COLR ML20141H1101997-07-11011 July 1997 Application for Amend to License DPR-28,replacing Pp 147,156 Through 161,168 & 279 of Util TS W/Corrected Pages ML20148J1771997-06-0909 June 1997 Application for Amend to License DPR-28,changing TSs to Update Section 6.0 to Add & Revise Ref to NRC Approved Methodologies Which Will Be Used to Validate or Generate cycle-specific Thermal Hydraulic Stability BVY-96-155, Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements1996-12-10010 December 1996 Application for Amend to License DPR-28,requesting Rev to TS to Relocate Fire Protection Requirements BVY-96-120, Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.21996-10-11011 October 1996 Application for Amend to License DPR-28,revising Existing Requirements Re Amount of Foam Concentrate Required to Support Operability of Recirculation Motor Generator Set Foam Sys in TS 3.13.G.1 & 3.13.G.2 BVY-96-104, Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power1996-09-11011 September 1996 Application for Amend to License DPR-28,modifying Sections 2.2.B & 3.6.D.1 of Util TS & Accompanying Bases Section to Permit Operation W/Increased SRV & SV Setpoint Tolerance & to Permit Operation Up to 100% of Rated Power ML20117C3901996-08-22022 August 1996 Application for Amend to License DPR-28,requesting Deletion of Existing Action Statement for High Range Stack Noble Gas Monitor & Replacing W/Different Action Statement ML20116J4371996-08-0909 August 1996 Application for Amend to License DPR-28,revising SLs for MCPR Based Upon Util Plant & Cycle Specific Analysis Performed by GE ML20113D8011996-06-28028 June 1996 Proposed Change 187 to License DPR-28,incorporating Std Language for Shutdown Margin Specifications to Allow Calculational Determination of Highest Wroth Control Rod,Per NUREG-1433 ML20107M7691996-04-26026 April 1996 Application for Amend to License DPR-28,deleting Definitions of Unrestricted Area, Restricted Area & Controlled Area ML20101P1261996-04-0404 April 1996 Proposed Change 184 to License DPR-28,revising TS Requirements for Secondary Containment Based on Guidance in NUREG-1433,Rev 1, STS for GE Plants,BWR/4 ML20101N1651996-04-0404 April 1996 Application for Amend to License DPR-28,consisting of Proposed Change 183,revising Existing Requirements for Control Rod & Drive Mechanism Coupling Verification,Per TS 4.3.B ML20097C0451996-02-0505 February 1996 Application for Amend to License DPR-28,consisting of Proposed Change 180 to Correct Typos & Text Inconsistencies BVY-94-123, Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation1994-12-14014 December 1994 Application for Amend to License DPR-28 to Change Instrument Identification for ECCS Actuation Instrumentation 1999-09-21
[Table view] |
Text
-
VERMONT YANKEE NUCLEAR POWER CORPORATION a h) y p Ferry Road, Bra"Jeboro VT 05301-7002 _,
ENGINEERING OFFICE m em smm SOLTON. f/A 0' 740
% wm August 27,1993 United States Nuclear Regulatory Commission BVY 93 - 81 A'ITN: Document Control Desk Washington, DC 20555
Reference:
- a. License No. DPR-28 (Docket No. 50-271)
Subject:
Proposed Change No.170 to the Vermont Yankee Technical Specifications -
Revisions Relating to 10CFR20
Dear Sir:
Pursuant to Section 50.59 of the Commission's Rules and Regulations, Vermont Yankee hemby pmposes the following changes to Appendix A of the Facility Operating License.
Pronosed Change This proposed change is being submitted to bring the Vermont Yankee Technical Specifications into compliance with recent revisions to 10CFR Part 20. In addition, several administrative changes are being proposed. The following descriptions detail the proposed changes:
- 1. Pages 4a,147,148,149,160f and 188: Definitions for " Member (s) of the Public" and " Site Boundary" are being revised to conform to the definitions or use of terms as provided in 10CFR20.1003. In addition, new definitions for "Umestricted Ama" and " Restricted Ama" are added to reflect their use in the revised Technical Specifications and definitions in 10CFR20.1003.
A new definition is also added for the " Controlled Area". This area is now identified as that portion of site propeny whem the dose limit of 100 mmm per year (10CFR20.1301) to " Members of the Public" apply. With respect to existing Technical Specification off-site dose limits that are lower than 100 mrem / year, the NRC has indicated that 10CFR50, Appendix 1, and 40CFR190 dose limits to members of the public still apply at the site boundary and beyond whem the licensee no longer has control in limiting access to an area. As such, those Technical Specifications that implement the dose criteria of 10CFR50, Appendix 1 and 40CFR190 have been clarified where necessary to stipulate that they apply only to members of the public beyond the site boundary. In addition, the reference to the annual dose limits of the old 10CFR Part 20 as the bases for the instantaneous dose rate limits of Technical Specification 3.8.E (page 160f) has been restated to directly identify the bases of the existing specification without refemnce to the old Pan 20.
- 2. Page 64 (Section 3.2) has been amended to delete reference to the limits of the old 10CFR20 with respect to the main steam line high radiation monitor and their response for gross fuel failures during reactor operations. The bases for the high radiation monitor actuation of the main steam line isolation valve closure (3 times normal background) is not changed by the deletion of reference to the old Part 20 since it was set specifically with respect to the dose limits of 10CFR100 for the control rod drop accident. Both the high radiation closure signal at 3 times backgmund, and the alarm signal for possible gross fuel failme or abnormal fission product M'
p m m %e ^; daMD4m
+
, i
i VERMONT YANKEE NUCLEAR POWER CORPOR ATION !
United States Nuclear Regulatory Commission l August 27,1993 i Page 2 j i
releases due to transient reactor operation remain unchanged. Therefore, there is no mducuon m !
the operational response of this system. The removal of the old Part 20 refemace is considemd to !
be an administrative change only by deleting unnecessary or outdated references from the j Technical Specifications. l
- 3. Pages 147,160d and 172j (Technical Specifications 3.8.A.1 and 3.9.A): Limitations on the j concentmtion of radioactive material released in liquid effluents have been revised to maintain the ;
previously appmved dose basis for liquid effluents. The new 10CFR20 requires that the annual i average releases of radioactive material in effluents be limited to the values in Appendix B, Table 2, Column 2. However, operational flexibility is allowed, compatible with considerations of health and safety, which may temporarily result in releases higher than the absolute values for !
concentration listed in Appendix B. The pmposed specification allows for this flexibility, but still l keeps the instantaneous concentrations at a level consistent with the previous 10CFR20.106. !
Since a release concentration corresponding to a limiting dose rate of 500 mrem /yr has been i acceptable in the curmnt Technical Specification to provide assurance that the limits of Appendix I to 10CFR50 are not likely to be exceeded, this same dose level should continue to be acceptable. i in addition, this operational flexibility is especially important in establishing effluent monitor !
setpoints. When applied on an instantaneous basis, the new 10CFR20, Appendix B l concentrations may be too low upon which to derive workable effluent monitor setpoints when monitor background, monitor sensitivity and performance characteristics must be taken into !
account. i i
- 4. Page 160e (Technical Specification 3.8.D): The bases for liquid holdup tanks has been ;
, restated to maintain the same dose bases (500 mrem / year) as that used to derive the 10 curie limit ;
1 under the old MPC values of Appendix B to Part 20. Therefore, this modification maintains the !
same dose bases for the Technical Specificanon as was ongmally accepted. l i
- 5. Pages 154,160,160c, and 160i; Technical Specifications 3.8.L.1 and 4.8.L.1 currently i require the primary containment to be vented / purged through SBGT if airborne activity levels in !
containment exceed the concentration values contained in 10CFR20, Appendix B. The i concentration limits in the regulation range between E-06 and E-08 microcuries per ml. However, 1 the implementing surveillance Table 4.8.2 only required analyses to a lower limit of detection of !
IE-04, thereby not requiring analyses to be sensitive enough to be sure that requirements of !
Technical Specification 3.8.L.1 could be demonstrated. As a result, the plant had implemented Technical Specification Interpretation #37 to ensure that proper sample counting would provide ,
the necessary sensitivity. The proposed Technical Specification change identifies that the SBGT
- System is effective for iodines and particulates only, with no credit taken for noble gas removal. .;
As such, this filter system is only to be used if Iodine-131, Iodine-133 or particulates with half
! lives greater than 8 days are detected above the 10CFR20 limits. The surveillance Table 4.8.2 has also been revised to state the LLD as IE-09 uC/ml to cover the sensitivity requirements to satisfy i the Technical Specification. This will allow Technical Specification interpretation #37 to be [
deleted. J i
- 6. Page 155,160i and 214 (Technical Specification 3.8.M): The term "in areas at and beyond the l site boundary" has been added to clarify which members of the public the dose limits of 40CFR190 (25 mrem /yr whole body) apply to, as opposed to members of the public within the
" controlled area" where the dose limits of 10CFR20 (100 mrem /yr) apply. In addition, administrative changes to the reporting requirements noted on pages 160i and 214 have been made to reflect the change in references found m the old Part 20.405c and the corresponding new Part ;
20.2203.
I VERMONT YANKEE NUCLEAR POWER CORPORATION United States Nuclear Regulatory Commission :
August 27,1993 -
Page 3 l
- 7. Pages 172e, and 172g: The cunent Technical Specification refers to the " National Bureau of Standards" when indicating traceability requirements for calibration sources. This has been updated to reflect that the National Bureau of Standards has been renamed to " National Institute for Standards and Technology". These are administrative changes that do not effect the conduct of f plant calibration methods. These changes are not directly associated with revisions necessary to implement the new 10CFR20, but are included to take the opportunity of this amendment to ;
update this ponion of the Technical Specifications.
- 8. Page 207, 207a: Plant record keeping requirements have been modified to reflect ,
requimments in the new 10CFR20 which state that records of radioactive shipments be mtained :
for the life of the plant instead of for only five years.
- 9. Pages 159,160b,172a,210,211,212,218,219, (with additional references on 159,160b l and 172a): A recent NRC notice in the Federal Register (Vol. 57, No.169,39353) revised 10CFR50.36a to allow radioactive effluent repons to be submitted to the NRC on an annual basis as opposed to semi-annually. This will reduce the number of repons that need to be pmpamd and ,
submitted each year, as well as allow for a submittal schedule for the effluent data that is less restrictive than current requirements (i.e. 90 days after January 1 va. the current 60 day requirements). No change in the time permitted to prepare a supplemental annual dose report is :
requested from that already granted in the Technical Specifications (180 days following January '
1). The word changes on the pages noted above reflect the change from semi-annual to annual j radioactive effluent release repons. This change is not required by the new 10CFR20, but is !
included here since trany of the pages that are being changed for the new Part 20 also contain the !
requirement for semi-annual reporting.
I
- 10. Page 218: In addition to modifying the terminology used in Section 6.13. "Off-Site Dose l Calculation Manual (ODCM)" referring to the previous version of 10CFR20, improvements are !
proposed to the wording which explains how amendments to the ODCM need to be documented. l The revised wording is more direct in specifying the information and documentation requirements i necessary to implem:nt changes. It also addresses a current NRC request that a complete and '
l revised ODCM be submitted to the NRC each time an amendment is made. This changes the existing situation whereby only pages with changes need to be submitted when an amendment is j filed with the Commission.
I 1. Page 165: Note 5 in the current TS contains a typographical error in that it references e.8.A.1, instead of 3.8.A.I. This is an administrative change to provide a corect Technical Specification reference in Note 5.
- 12. Page 201: The requirements for control of access to High Radiation Areas has been expanded in Technical Specification 6.5.B by adding clarifications for distances at which dose rate limits apply in accortlance with the use of these limits in the new 10CFR20.1001-20.2401.
- 13. Page 209: The term, " pocket dosimeter" has been replaced with "Self-Reading Dosimeter (SRD)" to reflect a more general category that includes both pocket ion chambers, as well as electronic dosimeters that can be used in estimating dose.
Reason and Basis for Change On May 21,1991, the NRC issued a complete revision to its standards for protection against !
ionizing radiation,10CFR20. The purpose of the revision to 10CFR20 was to modify the NRC !
VERMONT YANKEE NUCLEAR POWER CORPORATION United States Nuclear Regulatory Commission l August 27,1993 !
Page 4 regulations to reflect developments in the principles, philosophy, and scientific knowledge l underlying radiation protection. ;
4, l
Vennont Yankee implemented the requirements of the new 10CFR20 on July 8,1993. In i accordance with 10CFR20.1008(b), "after the time the licensee implements 20.1001-20.2401, the
- applicable sections of 20.1001-20.2401 shall be used in lieu of any section in 20.1-20.601 of this pan that is cited in license conditions of Technical Specifications, except as specified in paragraphs - i (c), (d) and (e) of this section". This proposed change to the Vermont Yankee Technical !
Specifications reflects the implementation of the new 10CFR20 by replacing conditions cited in the ;
previous version of 10CFR20 with appropriate conditions as cited in the new version of :
l 10CFR20. -!
a Additionally the reason and basis behind changing the frequency of submittal of the Vermont [
Yankee effluent report from semi-annual to annual is based upon recent changes to 10CFR50.36a i to reduce the regulatory burden of routine repon submittals. l
[
Safety Considerations l
, This proposed change is being implemented to bring Vermont Yankee into compliance with I i newly revised regulations 10CFR20 and 10CFR50.36a. i Changes as proposed to meet the new 10CFR20 will bring Vermont Yankee into compliance with the latest Federal Regulations on radiation protection in advance of the January 1,1994 3 required implementation date. Changes as proposed to meet 10CFR50.36a are administrative i
, only,in that the regulatory bunien is reduced by submitting the required effluent mports annually ,
4 . verses semi-annually. [
a This change has been reviewed by the Vermont Yankee Plant Operations Review Committee !
and the Nuclear Safety Audit and Review Committee.
Sienificant Hazards Considerations
- e The Commission has provided standards for determining whether a significant hazards
determination exists as stated in 10CFR50.92. A proposed amendment to an operating license i l
involves no significant hazards if operation of the facility in accordance with the proposed
~
1 amendment would not: (1) involve a significant increase in the probability or consequences of an l accident previously evaluated; (2) create the possibility of a new or different kind of accident from ;
any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. In I addition, the Commission has provided guidance in the practical application of these criteria in j 51FR7751, dated March 6,1986. {
The discussion below addresses each of these three criteria and demonstrates that the proposed l amendment involves no significant hazards consideranons: ;
- 1. The proposed change will not involve a significant increase in the probability or consequences !
of an accident previously evaluated. The changes as proposed consist of revisions to the Technical !
Specifications to meet new regulatory requirements as contained in 10CFR20 and 10CFR50.36a, l 1
and other related changes of an administrative nature. There is no change in the types and amounts t of effluents released, nor will there be any increase in individual or cumulative occupational j radiation exposures. None of the changes proposed will affect any plant hardware, plant design, :
safety limit settings, or plant system operation, and therefore do not modify or add any initiating :
i i
i VERMONT YANKEE NUCLEAR POWER CORPOR ATION United States Nuclear Regulatory Commission August 27,1993 Page 5 parameters that would significantly increase the probability or consequences of any previously analyzed accident.
- 2. The proposed chr ge will not create the possibility of a new or different kind of accident from any accident previo. ,1y evaluated. The changes as proposed do not physically alter the plant nor do they change the opemtion of the plant.
- 3. The proposed change does not involve a significant reduction in the margin of safety. The changes will not inemase the amount or types of effluents that may be released offsite, nor do they significantly incmase individual or cumulative occupational radiation exposures. These changes will not alter any of the requirements or responsibilities for protection of the public and/or employees against radiation hazards.
Therefore, we conclude that the changes as proposed do not constitute a significant safety hazard as defined in 10CFR50.92.
Schedule of Change l
l Vermont Yankee will implement these proposed changes to Technical Specifications as soon as practicable following mceipt of NRC appmval.
l We trust that the information provided adequately supports our request for a license amendment; however, should you have any question in this matter, please do not hesitate to contact this office.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION A
Donald A.Reid Vice President - Operations ..
cc: USNRC Region I Administmtor p USNRC Resident Inspector- VYNPS .- h S A ' 3,4 l
USNRC Project Manager- VYNPS
$d VTDepanment of Public Service 7
[c7@4 , NOTARY q STATE OF VERMONT
) :i
) ss t .s FUBUC A f WINDllAM COUNTY ) 7,g f "Ihen personally appeared before me, Donald A. K-id, who, being duly sworn, did ' hdggyce,Nh;ibit.
- Operations of Vermont Yankee Nuclear Power Corporation, that he is duly authorized to' execute and $le the foregoing document in the name and on the behatf of Vermont Yankee Nuclear Power Comoration and that the statements therein are true to the best of his knowledge and belief.
A/ k tkJ - .
Sally A.Sandstmm Notary Public My Commission Expires February 10,1995