Advises That Based on Review of Addl Justification for Completion Date of Second Quarter of 1996 for Performing Ipeee,Schedule Acceptable
ML20056F129
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/10/1993
From: Andersen J
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO.
References
GL-88-20, TAC-M83641, NUDOCS 9308260107
Download: ML20056F129 (3)


Text

August 10, 1993 Docket No. 50-245 Mr. John F. Opeka Executive Vice President, Nuclear Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SU8 JECT: MILLSTONE NUCLEAR POWER STATION, UNIT 1 - REVIEW 0F RESPONSE TO GENERIC LETTER NO. 88-20, SUPPLEMENT NO. 4 - INDIVIDUAL PLANT EXAMINATIONS FOR EXTERNAL EVENTS (TAC NO. M83641) l The NRC issued Supplement 4 to Generic Letter 88-20 on June 28, 1991, to require each licensee and each Construction Permit holder to conduct an individual plant examination of external events (IPEEE).

Guidance was provided with the generic letter supplement in the form of NUREG-1407,

" Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities." The supplement requested a response that would 1) identify the method and approach selected for the IPEEE, 2) describe the method to be used if it has not previously been submitted for staff review, and 3) identify the milestones and schedule for performing the IPEEE and submittal of the results to the NRC.

Following our review of your initial response to Supplement 4, we informed you by letter on June 29, 1992, that your scheduled completion date did not support the Commission's goal of closure on the severe accident issue by mid-1994. You subsequently provided additional justification for your completion date of the second quarter of 1996.

We have reviewed your letter dated September 18, 1992, and, although later than the staff would have preferred, we have determined that your schedule is acceptable.

Please inform us of any changes to your schedule or methodology.

Sincerely, Original signed by:

James W. Andersen, Acting Project Manager Project Directorate I-4 Division of Reactor Projects - I/II 1200Db Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:

Docket File.

JCalvo ACRS (10)

NRC & Local PDRs SNorris LDoerflein RGI

~

PDI-4 Plant JAndersen RHernan SVarga 0GC JChen OFFICE LA:PDI-4 PM:PDI-4/

D:Pb}' 4 SN@i[

JAndersed:Sp JStolb NAME DATE R//O/93 6 /10/93 f // D/93

/ /

/ /

T)

OFFICIAL RECORD COPY d

Document Name:

G:\\ANDERSEN\\IPEEE

. h k hM @{

9308260107 930810 PDR ADOCK 05000245 P

pop

1

. poucoq:\\

J.-

f" !

S UNITED STATES l'

NUCLEAR REGULATORY COMMISSION g

,/

WASHINGTON, D.C. 20555-0001 i

August 10, 1993 i

Docket No. 50-245 l

1 Mr. John F. Opeka Executive Vice President, Nuclear J

Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

MILLSTONE NUCLEAR POWER STATION, UNIT 1 - REVIEW OF RESPONSE TO GENERIC LETTER NO. 88-20, SUPPLEMENT NO. 4 - INDIVIDUAL PLANT EXAMINATIONS FOR EXTERNAL EVENTS (TAC NO. M83641)

The NRC issued Supplement 4 to Generic Letter 88-20 on June 28, 1991, to require each licensee and each Construction Permit holder to conduct an individual plant examination of external events (IPEEE). Guidance was provided with the generic letter supplement in the form of NUREG-1407, j

" Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities." The supplement requested a response that would 1) identify the method and approach selected for the IPEEE, 2) describe the method to be used if it has not previously been submitted for staff review, and 3) identify the milestones and schedule for performing the IPEEE and submittal of the results to the NRC. Following our review of your initial response to Supplement 4, we' informed you by letter on

]

June 29, 1992, that your scheduled completion date did not support the Comission's goal of closure on the severe accident issue by mid-1994.

You subsequently provided additional justification for your completion date of the i

second quarter of 1996.

We have reviewed your letter dated September 18, 1992, and, although later than the staff would have preferred, we have determined that your schedule is acceptable.

Please inform us of any changes to your schedule or methodology.

Sincerely, Jkmes W. Andersen, Acting Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page i

Mr. John F. Opeka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit I cc:

Gerald Garfield, Esquire R. M. Kacich, Director Day, Berry and Howard Nuclear Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President J. P. Stetz, Vice President Nuclear Operations Services Haddam Neck Plant Northeast Utilities Service Company Connecticut Yankee Atomic Power Company Post Office Box 270 362 Injun Hollow Road Hartford, Connecticut 06141-0270 East Hampton, Connecticut 06424-3099 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Department of Environmental Protection U.S. Nuclear Regulatory Commission 165 Capitol Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Allan Johanson, Assistant Director First Selectmen Office of Policy and Management Town of Waterford Policy Development and Planning Division Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Vice President P. D. Swetland, Resident Inspector Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U.S. Nuclear Regulatory Commission Post Office Box 128 Post Office Box 513 Waterford, Connecticut 06385 Niantic, Connecticut 06357 H. F. Haynes, Nuclear Unit Director G. H. Bouchard, Director Millstone Unit No. 1 Nuclear Quality Services Northeast Nuclear Energy Company Northeast Utilities Service Company Post Office Box 128 Post Office Box 270 Waterford, Connecticut 06385 Hartford, Connecticut 06141-0270 Nicholas S. Reynolds Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 l

.