- REVISED COPY 0c**************************************************************************-
UNIT 1 OPERATING DATA REPORT
.co**************************************************************************
Docket'No. 50-317.
August 12, 1993 Prepared by Frank-Piazza Telephone: (410)260-3821 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 1.
2.
REPORTING PERIOD MAY 1993
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET MWe) 845 6.. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830
'8.
CHANGE IN CAPACITY RATINGS NONE 9.
POWER LEVEL TO WHICH RESTRICTED N/A
-10.
REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date-
- 11. HOURS IN REPORTING PERIOD 744 3,623 158,364
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 3,623.0 111,973.0.
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 744.0 3,623.0 109,601.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,996,482 9,738,874 277,017,725
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 670,614 3,282,395 92,109,929
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 643,286 3,153,580 87,622,966-
- 19. UNIT SERVICE FACTOR 100.0 100.0 69.2
.20. UNIT AVAILABILITY FACTOR 100.0 100.0 69.2
- 21. ' UNIT. CAPACITY FACTOR (USING MDC NET) 104.6 105.5 67.1-
- 22. UNIT CAPACITY FACTOR (USING DER NET) 102.3 103.0 65.5-
- 23. UNIT FORCED OUTAGE RATE 0.0 4.2 9.1 24.-SHUTDOWNS SCHEDULED OVER THE NEXT SIX. MONTHS (TYPE, DATE AND DURATION):
N/A 25.-IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A-
$Bih k
s
- ~
RE/ISED COPY co**************************************************************************
UNIT 2 OPERATING DATA REPORT Jc***************************************************************************
Docket No. 50-318 August 12, 1993 Prepared by Frank Piazza Telephone: (410) 260-3 821 OPERATING STATUS T
- 1. UNIT NAME Calvert Cliffs Unit 2 2.
REPORTING PERIOD MAY 1993 3.
LICENSED THERMAL POWER (MWT) 2700
~
- 4. NAMEPLATE RATING (GROSS MWe) 911
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845 l
6.
MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860 7.
MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830 l
8.
CHANGE IN CAPACITY RATINGS
.NONE k
9.
POWER LEVEL TO WHICH RESTRICTED N/A j
- 10. REASONS FOR RESTRICTIONS N/A Cumulative-This month Year-to-Date to Date j
- 11. HOURS IN REPORTING PERIOD 744 3,623 141,719
- 12. NUMBER 0F HOURS REACTOR WAS CRITICAL 0.0 1,203.6 101,168.0.
j
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- )
- 14..HOURSEGENERATOR ON.LINE 0.0 1,201.7 99,783.5_
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
- 16. GROSS ~ THERMAL ENERGY GENERATED (MWH)-
0 3,222,124 254,366,916
- 17. GROSS ELECTRICAL ENERGY-GEN'TED(MWH)-
0 1,072,647 84,031,425
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 1,028,672 80,297,101
~
19.-UNIT SERVICE FACTOR 0.0 33.2 70.4 i
-20. UNIT AVAILABILITY' FACTOR 0.0 33.2 70.4
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 34.4 68.7' l'
- 22. UNIT CAPACITY. FACTOR (USING DER NET) 0.0 33.6' 67.1
- 23. UNIT FORCED OUTAGE RATE 0.0 3.8 24.' SHUTDOWNS SCHEDULED OVER THE'NEXT
' 6.0 i
I SIX MONTHS (TYPE, DATE'AND DURATION):
N/A l
- 25. IF. UNIT IS SHUTDOWN AT END OF REPORT PERIOD,
-l ESTIMATED'DATE OF START-UP' l
N/A i
i I
l
}
i
-)
t
.