Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 ML20247H5661998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Ccnpp ML20216G4601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20248L3641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20202G6611998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198N9441997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Calvert Cliffs Nuclear Power Plant,Units 2 & 3 ML20203H3081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Calvert Cliffs Nuclear Power Plant ML20199D0801997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198J6631997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Calvert Cliffs Nuclear Power Plant ML20210U7031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ccnpp ML20210L0671997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Ccnpp ML20149E2301997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Calvert Cliffs Nuclear Power Plant ML20148L1761997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CCNP ML20141F1401997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20137W8781997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant ML20136J4941997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20134M2891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20133N1031996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20132D1141996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2 ML20134L6621996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Calvert Cliffs Nuclear Power Plant Unit 1 & 2 ML20128Q8011996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Calvert Cliffs Npp,Units 1 & 2 ML20117N2171996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20116M6701996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20115F7281996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112J1291996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112A2421996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20107C1831996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20101D7831996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ccnpp ML20149K8721996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ccnpp ML20096D7031995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ccnpp Units 1 & 2 ML20095H3741995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20096D7171995-11-30030 November 1995 Rev to Monthly Operating Rept for Nov 1995 for Ccnpp Unit 2 ML20094M0161995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant ML20093G5881995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Calvert Cliffs Nuclear Power Plants Units 1 & 2 ML20092G3521995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Calvert Cliffs Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
. . - -
,i o** *****e****************************************************************** .
l UNIT 1 i OPERATING DATA REPORT ,
.o+e************************+.************************************************-
Docket No. 50-317-August 12, 1993 -!
Prepared by Frank Piazza
- Telephone:(410)260-3821 ;
.i 9$b b$bl9 h$b$S5 -f
- 1. UNIT NAME Calvert Cliffs Unit 1 !
- 2. REPORTING PERIOD JULY 1993 ;
3.. LICENSED THERMAL POWER (MWT) 2700-
'4. NAMEPLATE RATING (GROSS MWe). 918 ,
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845 i
_6. KAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860 !!
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830 l
- 8. CHANGE IN CAPACITY. RATINGS NONE
- 9. POWER LEVEL TO WHICH RESTRICTED N/A ,
- 10. REASONS FOR RESTRICTIONS N/A Cumulative !
This month Year-to-Date to Date
____________________________________ 1
- 11. HOURS'IN. REPORTING PERIOD 744 5,087 159,828 I
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4,946.0 113,296.0 3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4 .
14 .- HOURS GENERATOR ON LINE 744.0 4,926.5. 110,905.4. .j
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0_ -0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,997,133 13,215,124 280,493,975-
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 644,860' 4,415,299_ 93,242,833
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 618,061- 4,235,694 88,705,080 .:
- 19. UNIT SERVICE-FACTOR '100.0 96.8 69.4' j '
- 20. UNIT AVAILABILITY FACTOR 100.0 96.8 69.4
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.1 100.7 67.3-
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.3 98.5 65.7 .,
-23. UNIT FORCED OUTAGE RATE 0.0 3.2 9.0
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT
'SIX MONTHS (TYPE,;DATE AND DURATION):
N/A j
'25. IF SHUTDOWN AT END OF REPORT PERIOD, ;
-ESTIMATED DATE OF START-UP: l N/A :
(
l I
l 9308180171.930812- E[ ,
PDR ' ADDCK 05000317 f$ !
.R PDR h a
t
~
r 1
e l
o r
s_
a _,
w U- 3 opvn et w 9 1 3 .
pi r i o nt 8 s 9 a 28 4 _
t f 1 z r t a c e in 8 9 _
if 2
. z 3-a 0 t ope r e ko u 9 1
lC 1 i c m ph t r e 1
- A _
7 t
r t
s k P 26 E e u o a
r pno1 b h t 5 0
3 0
1 e u ) E C i t s yon d 8 N cu n 8 .
3 0
a a r
0 1 V 1 N %de al tp a dr dr _
5CAF( 4 I E 0 e 7f wpud e C R e a a EOR lyr oos nud ir s d
n d
n .
RT U tet at i e a a p a a _
. RNC OOE a r nt ch we S t
S t
OE E YE CI T R ime x e f i ns nund r E E NMTBN &CT o g pd u a E E _
.ENDtH TAADO r pmt ir ur n ow. re E E E
S AN E pa e o gI w t
I I
.. KT CI iP
- e. E U V E
ae to rghe n os t
. o p 4 5 _
LL A t mCTo ON PE C R I il d1 e . erD .tcef u l
DU MT l' t O c oea iu no duNhf c nt C erTor ri a ec s
i od c e .
r t.
r r n e pi u e e r m wreucr acwdloe u t mc. r a d Pto cb oieops r a aS r o ccd L S T l l Siau t ed e _
N N aaminc r ES uu O d: nn _
I NE OD 4 oaa tot u e uoet ndh T
C I'
MC O
9 hMMACRO t
e - . - - - -
U 3 O M1 23459 _
D 9 C E 9 3 H 1 M4 R Y EE L TD I.
E U S O S _
W J Y S C O l P i T n~
D N E # o N O ETT i t
A S NR A a
S M N E VEO /
n N C EE l' N im T I a
W R L R x O O E D P e s
E F 3 n T
U I
R OG D N 1
OI WT NO R
ic e __
I nL _
S o iOT O C l _
5 T T DA t
s i&
t I Ei l
E ee igc r N MS R rT u t r n o r
U l r si e r _
2 ia o' Fe c Rav in'e E N y ril a
n gd rTtan t
O n e a r r o S .
t A B m n nt osi.
i E pt el el at anar it _
R :i
' n uif gemeh n u uri r e oqa e e pd pt N)
OS sEMRR.OA a
OO I e _
TR RABCDEFGH _
AU O RO I 2
UI _
D(
l _
E I
Y F T _
d _
.l e _
E 8 F
1 d u _
7 ed _
N 0 ce D 3 rh 9
FS oc O
4 0-FS N 3 I _
9
. . _ . . . . . . . _. . ~
, :j
.i l
AVERAGE DAILY UNIT POWER LEVEL' co********************************************************************** ,
Docket No. 50-317 ~!
Calvert Cliffs Unit No. 1 August 12, 1993 ,
Prepared by Frank Piazza Telephone: (410) 260-3821 ,
JULY 1993 ;
Average' Daily Power Level Average Daily. Power Level Day (MWe-Net) Day (MWe-Net) -;
1 839 17 830 h 2 840 18 727 -i 3 839 19 812 l
4 838 20 835 .l 5 836 21 834 6 839 22 835 4
7 837 23' 834 l
?
i 8 836 24 835 r
9 833 25 835 !
10 833 26 838 :
11 832 27 834 l 12 832 28 834 13 834 29 832 .
1 14 837 30 830 15 838 31 831 16 835 t-
'i
'l 1
I J
4 . . -_ .- ._ . _
s l
- i
- t DOCKET NO. 50-317 CALVERT CLIFFS - UNIT 1 :
August 12,1993 ,
i i
SUMMARY
OF OPERATING EXPERIENCE :
July 1993 ,
The Unit was at power the entire month. The power was reduced at 1530 on July 18 to '
approximately 700'c to repair a broken solder connection in the trip circuit of 11 steam generator feed pump. The unit was returned to 100% power at 0050 on July 19, remaining there through the :
end of the month. ;;
I i
h r
i l
_. i 1
q
'f
-i
-)
H
- t 2. . , , _ .-_. 1
August 5, 1993 REFUELING INFORMATION RE00EST s
i
- 1. Name of facility: Calvert Cliffs Nuclear F ver Plant, Unit No.1.
- 2. Scheduled date for next refueling shutdown: February 4, 1994.
- 3. Scheduled date for restart following refueling:
May 9, 1994.* i
- 4. Will refueling or resumption of operation thereafter require a Technical l Specification change or other license amendment?
Operation after refueling will require either " Core Operating Limits Report" or will require a change to Technical Specification 3/4.2.2, ;
" Linear Heat Rate".* !
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information. ;
September 1993 for Core Operating Limits Report.* 7
- 6. Important licensing considerations associated with the refueling.
None identified at this time.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel ;
storage pool. ;
(a) 217. (b) 1498. ;
Spent fuel pools are common to Units 1 and 2.
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been !
requested or is planned, in number of fuel assemblies. .
(a) 4710. (NOTE 1) (b) 0. l
- 9. The projected date of the last refueling that can be discharged to the l Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load. j March 2014
- Entry has changed since last reported. -j NOTE 1: 4710 total licensed site storage capacity.
(1830 pool + 2880 IspsI) 7
co'**************************************************************************
~
UNIT 2 OPERATING DATA REPORT co**************************************************************************
Docket No. 50-318 August 12, 1993 Prepared by Frank Piazza Telephone: (410) 2 60-3821 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD JULY 1993
- 3. LICENSED THERMAL POWER (MWT) '2700
- 4. NAMEPLATE RATING (GROSS MWe) 911
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860 '
- 7. MAXIMUM DEPENDABLE CAP'YL(NET MWe) 830
- 8. CHANGE IN CAPACITY RATINGS NONE
- 9. POWER LEVEL TO WHICH RESTR.ICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A
' Cumulative This month Year-to-Date to Date ll. HOURS IN REPORTING PERIOD 744 -5,087 143,183
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,399.4 '102,363.8-
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0, 1,296.6-
- 14. HOURS GENERATOR ON LINE 709.9. 2,280.1 100,861.9-
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED - (MWH) 1,906,766 5,929,459 257,074,251-
.17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 614,754 1,945,302 84,904,080-
"18. NET ELECTRICAL ENERGY GENERATED (MWH) 588,017- 1,852,928. 81,121,357-19.. UNIT SERVICE FACTOR. 95.4 14 4 .'8 70.4
- 20. UNIT AVAILABILITY FACTOR 95.4 44.8 70.4
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 95.2 4 4 '. 1 68.7
- 22. UNIT' CAPACITY FACTOR (USING DER NET) 9 3'. 5 43.1 67.0.
2 3 ~. UNIT' FORCED OUTAGE RATE 0.0 .
. 2. 0 5. 9
- 24. SHUTDOWNS' SCHEDULED OVER THE NEXT.
SIX: MONTHS (TYPE, DATE AND DURATION):
N/A
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF-START-UP: >
N/A-
_ =_ . _ =
L 4
e e 2 h t e h
t U 3 3 f
s 9 9 1 a 28 nh oT nd e
ga n 4 8 9
1 k . e o d 8 f
i . n 3
- a sh rd r 9 1
2 e et i
a lC 1 i P 26 0 l x gyg o
1
- A 8
1 t
r v c t
s e u kn )
0 E E C
eBinHe n
gr u r e h t ~
5 0
8 3
0 8 _
3- l a u a 1 r 4 V N oed h o dr dr 0
5CAF(
I T E r
d ai f t t t . _
C R yW?od r e a a EDR RTU 0
ie1 ira ee wo l
l d
n a
d n
a ;
RNC irat h o pl pl t t t
e S S O0E p0a% 1 OE E YE pnd r r .
e a E E NhTBN C1 T R r eaed cl .
&CT oc u e s 0 E E TAADO l
1 EAN t d ed wa E .E _
ENDel iP i S E e gnr r wo I I ,
KT CI eE U V E ta a,a s ter f od t
e 4 5 LL A u r wAt an ON PE C R ot o DU P . er u r .
r t
hT ea c r ee nt n e wc O n e e a no n r
C n e paGs n e a .
teGrote h w m iinnt ci ant ei n t
. a ii a a a emliU n mrc d a
hh r aS r o ccdL S T Sia ed l
t ue r c..
N N laa E *- : uu miunc ot e O NE F d nn oa a uoet t nd h I
T' OD S hl l c
C P O MC P t hhACRO e _- - - - - - .
U' O i
h1 23459 D 3 9
C E 9 3 .
R 1 MI R y E 'E K E
l u TD T .
J S O Y
W S 'C O l' F i T
D n N E # o .
N O ETT i t
c A S NR A a
M S N E EVP O / in N T C EE N m .
R I L R a W O x
O P E n D' E F e
s T R OG 3
R .ne 2 U N DI NO l ic 2 i
S OTWT A nL o -
I I TO C /
N t T~ T UDA l
E ee s i&
t c a I Ei r i g' r N MS R uTr t r
n o r ;
~
U l iao si e ieEn r 2 Fe c Ravril _
N rTtar na y
n nagor t
O e _
n nt osi o S .
A B t E m eliat it _
pt el anar _
R :inu n uif gemeh uri r e oqa e e pd pt .
sEhRROA OO i
N) a IOS e - - - - - . - - .
TR RABCDEFG1 1 AU 1
4 ROl 3 2 .
Ul D'(
I E
1 .
P Y S .
T _
d l
e E 7 _
1 d u T 7 ed A 0 ce D 3 rh 9
FS oc _
O.
5 0 FS N 3 9
I
' 4 4 3 ;
i
l t
I AVERAGE DAILY' UNIT POWER LEVEL i
'oo********************************************************************** j Docket No. 50-318 Calvert Cliffs Unit No. 2 August 12,1993 ,
Prepared by Frank Piazza t Telephone: (410) 260-3821 {
JULY 1993 l
- i Average Daily Power Level Average Daily. Power Level. l Day (MWe-Net) Day- (MWe-Net) !
]
1 844 17 30 2 846 18 206 !
3 846 19 830 ,
i 4 845 20 834 !
5 843 21' 834 i
6 846 22 828 7 846 23 827 ;
8 844 24 832 l
.)
9' 841 25 831 l 10 843 26 832 i a
11 841 27 .835 12 839 28 830 13 840 29 828
.14 .842 30 827 15 838 31 829 :;
i
-16 826 l n
I
.e f
i
DOCKET NO. 50-318 l CALVERT CLIFFS - UNIT 2 i August 12,1993 -l
SUMMARY
OF OPERATING EXPERIENCE !
, July 1993 ;
^h The unit began the month at 100% power. The reactor power was decreased commencing at 2155 ,
on July 16, to 10% for a scheduled maintenance outage. The outage was planned to repair a pin hole leak on a main generator hydrogen line elbow and to clean condenser water boxes. The generator .
was disconnected from the grid at 0424 on July 17, during the maintenance. Following repairs the ;
generator was reconnected to the grid at 1431 on July 18. and the unit was returned to 100% power for the remainder of the month.
t I
i i
f r
b l
f r
s i
f 0
'I
~!
)
l
.. r ., _ _ . . , , , _ _ , - . _ _ _ . _ _ _ , _ _ _ _ . _ _ _ _ _ _ . _ --
+
i i
August 5, 1993 l
REFUELING INFORMATION RE0UEST l
- 1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2
- 2. Scheduled date for next refueling shutdown: March 3, 1995.
- 3. Scheduled date for restart following refueling: May 17, 1995.
- 4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Unknown.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
Unknown. t
- 6. Important licensing considerations associated with the refueling.
None identified at this time.
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217. (b) 1498.
Spent fuel pools are common to Units 1 and 2. !
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies. i (a)- 4710 (NOTE 1) (b) 0. .
- 9. The projected date of the last refueling that can be discharged to the Spent fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2016.
i NOTE 1: 4710 total licensed site storage capacity. !
(1830 pool + 2880 ISFSI)
'