ML20056D759

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1993 for McGuire Nuclear Station Units 1 & 2
ML20056D759
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 07/31/1993
From: Simmons N, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20056D758 List:
References
NUDOCS 9308170445
Download: ML20056D759 (10)


Text

s

)  :

i

?

OPERATING DATA REPDR1 L;:

?

I DDCKET NO E0-369 DATE Au;ust 13. 1993 5 0FERATINE STATUS COMPLETED BY R.A. Williaes-  ;

TELEPHONE 704-382-5346-

1. Unit hate: McGuire I r 4

2, Reporting Period: July 1. 1993-h ly 31, 1993

3. Licensed Thersal Pcuer (MWt): 3411  ;
4. Wateplate Rating (Eross MWe): 13051 Notes *Naeeplate Rating

'5. Design Elettrical Rating (Net MWe):  !!B0 (Brcss MWe) calculated as .

6. Marieus Dependable Capacity (Eress MWe):  !!71 1450.000 MVA x .90 power [
7. Maxisus Dependable Capacity (Net MWe): 1129 factor per Page lii, i B. If Changes Dccur in Capacity Ratings ilters Nutber 3 Through 7) Since Last NURES-0020. r Re;crt. Eive Reasons:

-l i

9. Power level To W ith Restricted, if Any (Net MWe): i 1 0. Reason for Restrictions, If any: ,

f This Month Yr,-to-Date Cumulative  ;

l

11. Hars In feperting Feriod 744.0 -5087.0 102263.0
12. Number Of Hocis Reacter Was Critical 744.0 2S62.2 71719.4
13. Reacter Reserve Shutd:wn Heurs --0-- - --0-- .(
14. Hours Senerater Sn-Line 744.0 PS20.7 70943.2
15. Unit Reserve Shutdcan Hars --0--- - 16. Gross Thersal Energy Benerated (MWH) 2531661 9257757 219061799
17. Brcss Electrical Energy Generated WH1 644629 3165167. 75340497
19. Net Electrical Energy Benerated (MWH) 811303 3021200 71937535 19.. Unit Service Facter 100.0 -55.5 69.4
20. Unit (nailability Factor 100.0 55.5- 69.4
21. Unit Capacity factor (Using MDC Net) 96.6 52.6 61.2-
22. Unit Capacity Factor (Using Deli Net) 92.4 50.3 59.6
23. Unit fatted Catage Rate 0.0 5.2 13.3
24. Shutdan Scheduled Over Next 6 Months (Type, Date, and Duration c.f Each):

NONE

25. If but Dran At End Of b pert Period. Estimated Date of Startup:
26. Units in Test Status (Prior tc Cearercial Operatical: Fr, recast  : Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C0KMERCIAL DPERATION 9308170445 930813 M' PDR _ADDCK 0S000369. M R PDR Q

PL s n

f

.i.

4 .

OPERATlWS DATA REPDRT .l

.t DOCKET NO- 50-369 UNIT McGuire 1 j DATE Aucust 13. 1993 .-

COMPLETED BY R.A. Willins '

i TELEPHDNE 704-382-5346'  ;

i

-t 90 NTH July, 1993 ..

.i DAY AVERA5E EAILY F0 DER LEVEL DAY AVERAGE DAILY PDWER LEVEL ~!

(NWe-Net) (MWe-Net)  :

1 1098 17 1092 1 4

2 1099 1B 1089 l

3 1096 19 1091 l 4 1093 20 1090 .j 5 1093 21 1097  !

6 1094 22 1089 ,

7 1079 23 '1027 .

B 1097 '24 1089 ,

I 9 109B 25 1099 5 10 1093 26 1099 l

. 11 ' 1090 27 1087 .;

i 12 1090 28 1097' i

.I 13 1090 29 1088- i

14' 1094' 30 1084 15 1095- 31 1083~ j

'16- -1092

')

i

.j l

'i i

' ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME Mcuu1Hs 1 DATE va/1;/va REPORT MONTH JulV 1993 COMPLETED BY N. C. 51MMUNS TELEPHONE trusj-Juz-azuJ (1) (4) (5) f2) _

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE S HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (2) (3) (4)

(1[r Forced Reason: Method: Exhibit G - Instructions S Scheduled A-EquigmentFailure{ 1-Manual for. Pre aration of Data B-Main enance or tes Explain) 2-Manual Scram Ent W S eets For Licensee C-Refueling 3-Automatic Scram (LER D-Regulatory R9striction 4-Other (Explain) Event File Report (NUREG-0161))

.E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

n,

+

F DOCKET: 50-369 UNIT: McGuire 1 Date: 08/13/93 ,.

NARRATIVE

SUMMARY

~

MONTH: July 1993 McGuire Unit 1 began the month of July operating at 100% full power. The unit operated at or near .

100% full power for the entire month.

i 1

- Prepared by N. C. Simmons ,

Telephone: . 704-382-5263  !

l i

.1 i

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire. Unit 1 i
2. Scheduled next refueling shutdown: June 1994 ,
3. Scheduled restart following refueling: Auaust 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by ,

Safety Review Comlaittee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or  ;

supplier, unreviewed design or_ performance analysis methods, significant changes in design or new operating procedures).

7. Number of Fuel assemblies (a) in the core: 193 l (b) in the spent fuel pool: ERI
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by-present licensed capacity: March 2006 DUKE POWER COMPANY DATE: Auaust 13, 1993 Name of

Contact:

N. C. Simmons Phone: 704-382-5263 _ I f

i s

n 3_

Li

.f

?

DPERATINE DATA REPDRI ,

F DOCKET ND 50-370 f DATE Aucust 13. 1993 j OFE MTING SioTUS COMT1ETED BY F.A,Williass .!:

TELEPHDNE 704-322-5346

1. Unit Nare: McGuire 2 5
2. Reperting Period: July 1, 1993-July 31, 1973
3. Licensed Thereal Power (MWth 3411
4. Naceolate Rating (Gross MWel: 1305+ Notes +Naseplate Rating
5. Design Electrical Rating (Net N e): 1100 (Srcss MWe) calculated as j
6. Marinum Dependatie Capacity (6ross MWe): 1171 1450.000 MA x .90 power
7. Mancus Dependable Capa:ity (Net HWeh  !!29 fact r per Page iii, E. If Chan;es Occur iri Capacity Ratings t!tess hsber 3 Through 7) Since Last NUREB-0020. -!

Repert. Elve Reaters:  ;

9. Fower Level To Which Restricted, If Any (Net MWe): ,
10. Reas o for Restrictions, If any:

This Month Yr.-to-Date- Cuaulative

11. hcurs In Keperting Peried 744.0 5087.0 82559.0 t
12. Ecber Of hrs Reactor Was Criti:al 6.0 4307.9. 63724.2 (
13. Keatter Reserve Shutd:en Hears --0-- --0-- - .;
14. Hoers Eenerater Dn-Line 6.0 4300.9 62798.0- l'
15. Unit Reserve Shutdrun Heurs --0-- - '--0--
16. Srcss Thers,al Energy Generated (NH) 7767 13784B66 205192422 -
17. Srcss Electrical Energy Eenerated ( M ) 1645 4915442 '71735143 IB. Net Electrical Energy Benerated (MWH) -6721 461354B 6E774513 ,
19. Unit Service Facter 'O.B- E4.6- 76.1 ,
20. Unit Availability Factor 0.8 84.6 76.1

} 2!. Unit Capa:ity Fatter iUsing MDC Net) 0.0 - 80.3 72.9 l- 22. Unit Capacity factor (using DER Net) 0.0 76.9- 70.6

23. Unit Forced Datage Rate .

0.0 1.1 7.2

24. Shetdewn Schehled Dver Neat 6 Months (Type, Date, and Duration of Eachh j

_ Current 1v refueline

'25. If Shut Dcun At End Of Beport Feriod. Esticated Iate ef Startup: September 13,-1993  ;

26. Units In Test Status (Prior to Coasettial Operatien): Forecast 'Athieved- ,

INITIAL CRITICALITY IhlilAL ELECTRICIT)  :

COMERCIAL DPERATION t

4 .

.a  :)

i n  :

OPERATINB DATA REFORT DDCKET ND' 50-370 UNIT ticBuire 2 l DATE Aunust 13. 1993-COMPLETED BY R.A. Williers TELEPHONE 704-352-5346- 'I 20 NTH July, 1993 .i D31 AVERASE DAILY POWER LEVEL E3Y AVEEASE DAILY POWER LEVEL l W e-Net) (Mile-Net) .;

1 PB 17 0

.I 2 0 18 0

-3 0 19 0 4 0 20 :0 i 5 -0 21 ' O --

6 0 22 0 7 0 23 -0 -!

E D 24 0- ,

.9 0 25 '0' '

i

! 10 0 E6 0 l

11 0 27 0-i 12 0 28 0 .>

13 0- 29 0  ;

. 14 0 30 0

-is o 31 o  !

t

-. l b . ' O-1 b

k p

r

' th , -

L:.

UNIT SHUTDOWNS AND POWER' REDUCTIONS DOCKET NO. 50-370 UNIT NAME Muuulub z DATE UU/1J/9J REPORT MONTH July 1993 COMPLETED BY N. c. 51MMUHb TELEPHONE (/ve)-J82-DzbJ (1) (4) (5)

{2) _

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 4 93 1 S 738.00 C 1 RC FUELXX END-OF-CYCLE 8 REFUELING OUTAGE (1) (2) (3) (4)

F Forced Reason: Method: Exhibit G - Instructions S Scheduled- A-Egyipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of Data 2-Manual Scram EntW Sheets For Licensee C-Refueling D-Regulatory Restriction 3-Automatic Scram 4-Other (Explain)

Event Report (LER File (NUEG-0161) )

E-Operator Training & License Examination F-Administrative (5) '

G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)

-4 l

DOCKET: 50-370- ,

UNIT: McGuire 2 .,

Date: 08/13/93 '

NARRATIVE

SUMMARY

MONTH: July 1993 McGuire Unit 2 began the month of July decreasing power for end-of-cycle 8 refueling outage. The unit was taken off-line to started end-of-cycle 8 refueling ontage on 7/1 at 0600. The unit remained in the' refueling outage for the remainder of the month. l V

f t

Prepared by N. C. Simmons Telephone: 704-382-5263

M r

)

MONTHLY REFUELING INFORMATION REOUEST l

1. Facility name: McGuire. Unit 2 [
3. Scheduled next refueling shutdown: Currently Refuelina
3. Scheduled restart following refueling: September 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF h ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 ,

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. I

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
  • If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 193-(b) in the spent fuel pool: 817
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: Depember 2003 DUKE POWER COMPANY DATE: Auaust 13. 1993 Name of

Contact:

N. C. Simmons Phone: 704-382-5263 _

i

-t I

i l

j